Deng Qilai, Fu Bin, Wang Xiaonan, Xu Dan, Xu Dexin. APPLICATION OF UNDERPINNING TECHNOLOGY IN A BASEMENT REBUILDING PROJECT[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(1): 120-123. doi: 10.13204/j.gyjz201001029
Citation:
Deng Qilai, Fu Bin, Wang Xiaonan, Xu Dan, Xu Dexin. APPLICATION OF UNDERPINNING TECHNOLOGY IN A BASEMENT REBUILDING PROJECT[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(1): 120-123. doi: 10.13204/j.gyjz201001029
Deng Qilai, Fu Bin, Wang Xiaonan, Xu Dan, Xu Dexin. APPLICATION OF UNDERPINNING TECHNOLOGY IN A BASEMENT REBUILDING PROJECT[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(1): 120-123. doi: 10.13204/j.gyjz201001029
Citation:
Deng Qilai, Fu Bin, Wang Xiaonan, Xu Dan, Xu Dexin. APPLICATION OF UNDERPINNING TECHNOLOGY IN A BASEMENT REBUILDING PROJECT[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(1): 120-123. doi: 10.13204/j.gyjz201001029
Through a basement rebuilding and reinforcement project,this article introduced the application of Underpinning technique in a basement rebuilding project from theoretical analysis and engineering practice.First of all,this article disscussed the result of underpinning project,lift-up force and lift-up displacement in rebuilding design;then introduced application of ground treatment technology in this project;at last,evaluated the effect of the rebuilding project by local monitoring of the structure displacement and sedimentation observation of building in later period.