[1] | RONG Hua, JING Yuxiang, WANG Yulin, GENG Yan. Effects of Elevated Temperature and Irradiation on Performance Degradation of Concrete Structures[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(11): 133-138. doi: 10.13204/j.gyjzG22062009 |
[2] | HU Ruiyu, WANG Jinsen, WANG Yue. APPLICATION OF R130 STRONG WIND RESISTANT ROOF SYSTEM IN REINFORCEMENT ENGINEERING OF NUCLEAR POWER PLANT[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(12): 123-128. doi: 10.13204/j.gyjzG21121504 |
[3] | LIU Changyong, WANG Qianfeng, HOU Chunping, XIAO Shuluan, WU Cong. STUDY ON UNIAXIAL DYNAMIC COMPRESSIVE MECHANICAL PROPERTIES OF FREEZE-THAW DETERIORATED CONCRETE IN FROZEN CONDITIONS[J]. INDUSTRIAL CONSTRUCTION, 2020, 50(10): 111-116,121. doi: 10.13204/j.gyjzG19102507 |
[4] | Zhang Kai, Wang Qicai, Wang Qingshi, Li Sheng, Li Jianxin. RESEARCH ON EARLY STRENGTH AND FREEZE-PROOF RESISTANCE OF AIR-ENTRAINED CONCRETE UNDER 3 ℃ CURING[J]. INDUSTRIAL CONSTRUCTION, 2015, 45(2): 5-9. doi: 10.13204/j.gyjz201502002 |
[5] | Li Songqi, Li Zhongcheng, Zhang Tao. DESIGN AND SEISMIC RESPONSE ANALYSIS OF SEISMIC-ISOLATION SYSTEM FOR AN EMERGENCY CONTROL CENTER BUILDING OF A NUCLEAR POWER PLANT[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(12): 41-43. doi: 10.13204/j.gyjz2001412008 |
[6] | Shen Wangxia, Li Zhongcheng. ANALYSIS OF SEISMIC FLOOR RESPONSE SPECTRA OF ELASTOPLASTIC RC STRUCTURES OF EXISTING NUCLEAR POWER STATIONS[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(05): 61-64. doi: 10.13204/j.gyjz201405015 |
[7] | Shi Mingzheng. CRACK CONTROL OF PRESTRESSED CONCRETE STRUCTURES BASED ON NOMINAL TENSILE STRESS METHOD[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(11): 64-66,11. doi: 10.13204/j.gyjz201311015 |
[8] | Wang Xiaozhou. HEAT PRESERVATION AND CURING MEASURE ANALYSIS OF CONCRETE STRUCTURE CONSTRUCTION IN BASEMENT[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(11): 96-99,103. doi: 10.13204/j.gyjz201111021 |
[9] | Qiao Hongxia, Zhou Mingru, Zhu Yanpeng, He Zhongmao. DESIGN AND CHOICE OF DURABILITY ASSESSMENT PARAMETER OF CONCRETE IN SALTY SOIL REGION[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(6): 27-30,78. doi: 10.13204/j.gyjz201006007 |
[10] | Zhang Zhong, Li Xiaojiang, Zhang Xinbin, Cheng Daye. FINITE ELEMENT ANALYSIS AND STUDY ON CURING METHODS AND TECHNICAL INDEXES OF MASS-CONCRETE CONSTRUCTION[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(1): 5-7,23. doi: 10.13204/j.gyjz201001002 |
[11] | Chen Lihua, Zhang Xinbin, Simon Chen, Cheng Daye, Zhang Zhong. SITE MONITORING OF MASS CONCRETE STRAIN OF FOUNDATION OF CPR1000 NUCLEAR POWER PLANT[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(1): 24-26,38. doi: 10.13204/j.gyjz201001008 |
[12] | Wang Dingtang. CRACK CONTROL OF MASS CONCRETE FOUNDATION AT EARLY AGE AND ITS TECHNOLOGY APPLICATION[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(3): 139-143,87. doi: 10.13204/j.gyjz201003030 |
[13] | Zhang Zhong, Zhang Tao. APPLICATION OF FE METHOD IN TEMPERATURE CONTROL DURING CONSTRUCTION OF MASS CONCRETE RAFT FOUNDATIONS[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(1): 21-23. doi: 10.13204/j.gyjz201001007 |
[14] | Gu Haiming, Cheng Daye, Zhang Xinbin, Zhang Zhong. MONITORING OF TEMPERATURE STRAIN DURING POURING RAFT FOUNDATION FOR A NUCLEAR ISLAND OF A NUCLEAR POWER PLANT IN HOT AND HUMID ENVIRONMENT[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(1): 17-20. doi: 10.13204/j.gyjz201001006 |
[15] | Bai Chongxi, Xin Yu, Zheng Wenzhong. STRUCTURAL DESIGN AND CONSTRUCTION OF NATATORIUM WITH DOUBLE-FLOOR SWIMMING POOLS IN HARBIN INSTITUTE OF TECHNOLOGY[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(11): 132-136,89. doi: 10.13204/j.gyjz200911031 |
[16] | Zhang Yu-ming, Wu Jing, Meng Shao-ping. STUDY ON CONTROL OF CRACK IN PRESTRESSED CONCRETE STRUCTURES WITH LARGE LONGITUDINAL LENGTH[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(5): 8-12. doi: 10.13204/j.gyjz200605003 |
[17] | Meng Shao-ping, Han Chong-qing, Wu Jing. RESEARCH ON BASIC PROBLEMS AND ENGINEERING PRACTICES ABOUT DESIGN OF CONCRETE STRUCTURES WITH LARGE LONGITUDINAL LENGTH[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(5): 1-4,8. doi: 10.13204/j.gyjz200605001 |
[18] | Yang Zhongbao, Zou Daoqin, . THE SITE TEST OF SUPER-LENGTH CONCRETE STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(8): 64-66,74. doi: 10.13204/j.gyjz200508016 |
[19] | Chen Wanxiang, Yang Liang, Guo Zhikun, Huang Yu, Zhang Shi. STUDY ON TEMPERATURE CONTROL OF MASS CONCRETE IN XUANWU LAKE TUNNEL[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(10): 53-55. doi: 10.13204/j.gyjz200410016 |
[20] | Ouyang Dong. NEW TECHNOLOGY OF HIGH ANTICRACKING CONCRETE FOR HUB BUILDING OF GUANGZHOU NEW BAIYUN AIRPORT[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(1): 69-71,17. doi: 10.13204/j.gyjz200401020 |