Source Journal for Chinese Scientific and Technical Papers
Core Journal of RCCSE
Included in JST China
Included in the Hierarchical Directory of High-quality Technical Journals in Architecture Science Field
Volume 37 Issue 4
Dec.  2014
Turn off MathJax
Article Contents
Zou Dong-feng, Xu Han, Zhong Dong-bo. ISOLATION METHOD OF WIPING OFF UNEMPLOYED SEGMENT PILE SHAFT RESISTANCE IN STATIC LOAD TEST[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(4): 22-24. doi: 10.13204/j.gyjz200704007
Citation: Zou Dong-feng, Xu Han, Zhong Dong-bo. ISOLATION METHOD OF WIPING OFF UNEMPLOYED SEGMENT PILE SHAFT RESISTANCE IN STATIC LOAD TEST[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(4): 22-24. doi: 10.13204/j.gyjz200704007

ISOLATION METHOD OF WIPING OFF UNEMPLOYED SEGMENT PILE SHAFT RESISTANCE IN STATIC LOAD TEST

doi: 10.13204/j.gyjz200704007
  • Received Date: 2006-10-20
  • Publish Date: 2007-04-20
  • :In pile static load test, effectual isolation method must be adopted to wipe off the unemployed segment pile shaft resistance in order to get the bearing characteristics of a single pile at the actual working elevation, when there is a relatively long unemployed pile segment.It is illustrated with an engineering test example in Beijing that double steel casing method is an efficient way to wipe off the unemployed segment pile shaft resistance.Farther, by comparing the tested result of thework pile, it shows that there will be a risk in directly applying the test result data in project, and the effect of overburden on the test results should be considered in pile foundation design
  • loading
  • 陈仲颐, 周景星, 王洪瑾.土力学.北京:清华大学出版社,1994
    [2] JGJ 94-94 建筑桩基技术规范
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (116) PDF downloads(87) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return