Qin Shihong, Zou Wei, Jian Bin, Li Tangning. THE TREATMENT OF PRESTRESS TIGHTWIRE COUPLER FAILURE AND STRUCTURAL LOADING TEST IN AN ATHLETIC FIELD OF A HIGH SCHOOL[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(3): 102-104. doi: 10.13204/j.gyjz200603027
Citation:
Qin Shihong, Zou Wei, Jian Bin, Li Tangning. THE TREATMENT OF PRESTRESS TIGHTWIRE COUPLER FAILURE AND STRUCTURAL LOADING TEST IN AN ATHLETIC FIELD OF A HIGH SCHOOL[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(3): 102-104. doi: 10.13204/j.gyjz200603027
Qin Shihong, Zou Wei, Jian Bin, Li Tangning. THE TREATMENT OF PRESTRESS TIGHTWIRE COUPLER FAILURE AND STRUCTURAL LOADING TEST IN AN ATHLETIC FIELD OF A HIGH SCHOOL[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(3): 102-104. doi: 10.13204/j.gyjz200603027
Citation:
Qin Shihong, Zou Wei, Jian Bin, Li Tangning. THE TREATMENT OF PRESTRESS TIGHTWIRE COUPLER FAILURE AND STRUCTURAL LOADING TEST IN AN ATHLETIC FIELD OF A HIGH SCHOOL[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(3): 102-104. doi: 10.13204/j.gyjz200603027
It is presented briefly that the failure of a steel strand coupler during the tension of the prestressed tendon in a high school. As a result of the analysis of its reasons,the scheme adopting overlapping unbonded prestressed tendon for the reinforcement is proposed and successfully accomplished. And the data on the site test substantiates the efficiency of the steel strand coupler and the performance of the ultra long prestressed secondary girder structural system,which adopts steel strand couplers.