[1] | YU Yue, CAI Lijian, TANG Ruoyang, DING Ran, FAN Jiansheng, LIU Guanghe. Experimental Research on Impact Resistance of Half Steel Plate Concrete Structures with Different Tie Bar Details[J]. INDUSTRIAL CONSTRUCTION, 2024, 54(8): 19-27. doi: 10.3724/j.gyjzG23110116 |
[2] | CHEN, Weihong, WANG, Chenyang, ZENG. RESEARCH ON SEISMIC BEHAVIOR AND FAILURE MODE OF “STRONG BEAM AND WEAK COLUMN” PC JOINTS[J]. INDUSTRIAL CONSTRUCTION, 2020, 50(1): 22-27. doi: 10.13204/j.gyjz202001005 |
[3] | XIONG, Haiming, LIANG, Houran. EXPERIMENTAL RESEARCH ON THE PERFORMANCE OF COMPOSITE CONFINED REINFORCED CONCRETE CIRCULAR COLUMN WITH MULTIPLE SPIRAL STIRRUPS UNDER AXIAL COMPRESSION[J]. INDUSTRIAL CONSTRUCTION, 2020, 50(1): 84-90. doi: 10.13204/j.gyjz202001015 |
[4] | Ding Hongyan, Yang Baokun, Zhang Puyang, Qiao Shuai. EXPERIMENTAL RESEARCH ON SEISMIC PERFORMANCE OF STORY-ADDED REINFORCED CONCRETE FRAME[J]. INDUSTRIAL CONSTRUCTION, 2015, 45(5): 49-54. doi: 10.13204/j.gyjz201505012 |
[5] | STUDY OF SEISMIC PERFORMANCE OF SRC COLUMN-SHEAR WALL HYBRID STRUCTURE#br# SYSTEM OF MAIN POWERHOUSE IN LARGE-SCALE THERMAL POWER PLANT[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(08): 92-97. |
[6] | Wang Chaoqun, Bai Guoliang, Wang Bo, Zhu Jianing, Li Hongxing. STUDY OF FAILURE MECHANISM AND MECHANICAL BEHAVIOR OF ABNORMAL JOINTS BETWEEN STEEL REINFORCED CONCRETE COLUMN AND REINFORCED CONCRETE BEAM UNDER LOW-CYCLE REVERSED LOADING[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(09): 156-161. |
[7] | Chen Zongping, Zhong Ming, Chen Yuliang. EXPERIMENTAL STUDY ON MECHANICAL PROPERTIES OF CONCRETE-FILLED OPENING HOLE DAMAGED STEEL TUBULAR MEMBERS[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(2): 121-127. doi: 10.13204/j.gyjz201302025 |
[8] | Wei Demin, Guo Lei, Zhang Haiyan. ANALYSIS OF INFLUENCE FACTORS ON SEISMIC PERFORMANCE OF REINFORCED CONCRETE STAIRS[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(10): 61-65,70. doi: 10.13204/j.gyjz201310014 |
[9] | Zhang Xuebing, Fang Zhi, Guo Xueyi, Xu Xiaowei, Tang Zhuo, Fan Xuan, Kuang Chenggang. STRENGTH AND FAILURE MECHANISM ANALYSIS OF RECYCLED AGGREGATE CONCRETE IMPROVED BY DSP GROUT[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(4): 15-20. doi: 10.13204/j.gyjz201204004 |
[10] | Zhang Jian, Diao Bo, Xi Jie. RESEARCH ON HYSTERETIC BEHAVIOR OF REINFORCED CONCRETE COLUMNS AFTER THE ACTION OF SUSTAINED LOAD[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(10): 38-41. doi: 10.13204/j.gyjz201210010 |
[11] | Chen Lin-zhi, Feng Yuan. INFLUENCE OF RIGID ZONE SETTING FOR BEAMS AND COLUMNS ON SEISMIC PERFORMANCE OF REINFORCED CONRETE FRAME STRUCTURES[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(9): 75-78. doi: 10.13204/j.gyjz201209017 |
[12] | Yao Guohuang, Chen Yiyan, Huang Yongjun, Pan Donghui, Zheng Xiaoying, Xu Wenjie. EXPERIMENTAL STUDY ON SEISMIC BEHAVIOR OF JOINT OF CFST COLUMN-RC BEAM[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(2): 97-101,69. doi: 10.13204/j.gyjz201102023 |
[13] | Wu Kai, Xue Jianyang, Zhao Hongtie. STUDY ON SHEAR PERFORMANCE OF SRC-RC TRANSFER COLUMN WITH SHORT COLUMN FAILURE PATTERN[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(11): 51-54,64. doi: 10.13204/j.gyjz201011014 |
[14] | Zhang Jianwei, Cao Wanlin, Wang Zhihui, Tao Junping. SEISMIC PERFORMANCE OF MID-RISE RC COMPOSITE SHEAR WALLS WITH CONCEALED STEEL TRUSS[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(8): 101-105,110. doi: 10.13204/j.gyjz200908024 |
[15] | Tang Baijian, Ruan Hanting, Li Yaming. DESIGN AND CONSTRUCTION OF 24 m-LONG-SPAN LATTICE SRC TRANSFER STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(9): 96-98. doi: 10.13204/j.gyjz200809027 |
[16] | Wang Xun-liu, Lu Xin-zheng, Ye Lie-ping. ANALYSIS OF EARTHQUAKE-RESISTANT BEHAVIORS OF RC COLUMNS UNDER VARIABLE AXIAL LOADS[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(12): 71-75. doi: 10.13204/j.gyjz200712017 |
[17] | Yan Weibo, Li Zhenbao, Ma Hua, Zhou Xiyuan, Duan Shichang. AN EXPERIMENTAL STUDY ON PERFORMANCES OF STRENGTHENED RC FRAMES WITH RC DAMPERS AND BRACES[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(7): 29-32. doi: 10.13204/j.gyjz200707010 |
[18] | Yi Weijian, Zhao Xin. DAMAGE PATTERN OF COLUMNS WITH CORRODED STEEL BARS IN THE COMPRESSIVE ZONE OF CONCRETE SECTION AND THE DIFFICULT IDENTIFICATION OF CORROSION WITH HALF-CELL TECHNIQUE[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(12): 23-26,90. doi: 10.13204/j.gyjz200512007 |
[19] | Wang Sheliang, Zhao Xiang, Shen Zhaowu, Miao Xiaoyu. EXPERIMENTAL STUDY ON EARTHQUAKE BEHAVIOR OF SHEAR WALL MODEL STRUCTURE WITH R.C. FRAME COLUMN[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(1): 33-36. doi: 10.13204/j.gyjz200501010 |
[20] | Wang Peiqiong, Tang Yuechao, Mao Zhongyi. RESEARCH ON LONGITUDINAL CRACK DAMAGE TO CONCRETE-FILLED STEEL TUBE STRUCTURE AND ITS STRENGTHENING[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(2): 96-97,109. doi: 10.13204/j.gyjz200502026 |