Citation: | Zhang Jianlin, Zhang Canhui, Li Mingcheng. AN INVERSE METHOD OF PILE FAULTS' IDENTIFICATION VIA FITTING STRESS WAVE CURVES[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(11): 54-57,53. doi: 10.13204/j.gyjz200411014 |
[2] 刘利民,苏翔,熊巨华.桩基工程的理论进展与工程实践.北京:中国建材工业出版社,2002
|
徐攸在.桩的动测新技术.北京:中国建筑工业出版社,2002
|
[3] 罗骐先.桩基工程检测手册.北京:人民交通出版社,2002
|
[4] 陈宝林.最优化理论与算法.北京:清华大学出版社,1989
|
[1] | ZHOU Binke, CHENG Guozhong, TENG Wenzheng, ZHOU Handong, WANG Cong, CHEN Shasha, LIU Shuo, WANG Ruirong. Intelligent Optimization Method for Scan Planning of Large and Complex Space Frames[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(4): 202-208. doi: 10.13204/j.gyjzG21062919 |
[4] | Wu Jie. OPTIMIZATION OF THE BIDIRECTIONAL BEAM STRING STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(04): 140-145. |
[5] | Xie Yan, Tan Xiaohui, Shen Mengfen, Yu Wei, Xu Quan. STUDY OF SOIL-WATER CHARACTERISTIC CURVE OF FIBER MODIFIED EXPENSIVE SOIL[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(10): 91-95. doi: 10.13204/j.gyjz201410019 |
[6] | Qi Fengbo, Yao Jitao. AN OPTIMIZATION OF SENSITIVITY FACTORS FOR GENERAL DESIGN FORMULA[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(8): 10-14. doi: 10.13204/j.gyjz201308002 |
[7] | Yang Tao, Yan Yieqiang, Li Guowei. THE SETTLEMENT RATE STANDARD FOR EQUAL PRELOADING BASED ON HYPERBOLIC FITTING METHOD[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(3): 93-96. doi: 10.13204/j.gyjz201203020 |
[8] | Liang Jin, Xue Suduo, Li Xiongyan. AIR TEMPERATURE EMPIRICAL FORMULA FOR LARGE SPACE STRUCTURE UNDER FIRE CONSIDERING THE EFFECT OF CIRCULAR WALL[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(7): 91-94. doi: 10.13204/j.gyjz201207014 |
[9] | Tao Qinglin, Zheng Shansuo, Hu Yi, Li Zhiqiang, Wang Fan. STUDY ON MULTI-OBJECTIVE OPTIMIZATION DESIGN METHOD FOR SRC COLUMNS[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(11): 126-130. doi: 10.13204/j.gyjz201011030 |
[10] | Sun Hongjun, Liang Li, Zhao Lihong, Wang Xuezhi. EXPERIMENTAL ANALYSIS OF PRIMARY COMPRESSION SETTLEMENT OF MUNICIPAL SOLID WASTE LANDFILL[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(6): 84-87,107. doi: 10.13204/j.gyjz200906020 |
[11] | Huang Xin, Ning Jian-guo, Xu Sheng, Lan Ming-zhang. OPTIMIZATION DESIGN OF SOFT SOIL STABILIZER[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(7): 7-12,18. doi: 10.13204/j.gyjz200607002 |
[12] | Shen Baohan, Niu Dongsheng, Yu Chengjie. EXPERIMENTAL STUDY ON INTEGRITY DETECTION OF FUIL-SCALE MODEL DX PILES CAST-IN-SITU[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(3): 19-20,43. doi: 10.13204/j.gyjz200403005 |