[1] | HE Li, SHA Huiling, CHONG Xun, GAO Jun, FENG Hui, LI Zhipeng, ZHAO Peng. State-of-the-Art of Connection Systems in Precast Concrete Cladding Panels and Their Effects on Seismic Performance of the Structure[J]. INDUSTRIAL CONSTRUCTION, 2024, 54(4): 207-218. doi: 10.13204/j.gyjzG23020707 |
[2] | XUE Weichen, ZHANG Baozheng, CHEN Shengyang, JIANG Jiafei, GUO Dapeng. State of the Art on Mechanical Properties of Precast Prestressed Concrete Structures (for Buildings and Utility Tunnels)[J]. INDUSTRIAL CONSTRUCTION, 2024, 54(10): 9-20. doi: 10.3724/j.gyjzG24100801 |
[3] | ZHANG Guowei, AN Jianing, GAO Haizhi, ZHANG Wenli, QIN Changan, XUE Hongjing, ZHANG Meng, WANG Haoqiang, WANG Yaxian. Research on Seismic Performance of Repaired RC Frames with Prefabricated Cladding Panels[J]. INDUSTRIAL CONSTRUCTION, 2023, 53(8): 31-37,95. doi: 10.13204/j.gyjzG22080212 |
[4] | WANG Xiaofeng, NA Zhenya, ZHAO Guangjun, HAN Weitao. Advances in Structural Performance Research and Engineering Application of Prestressed Concrete Double Tees[J]. INDUSTRIAL CONSTRUCTION, 2023, 53(3): 12-20. doi: 10.13204/j.gyjzG22082911 |
[5] | GAO Peinan, DENG Yang, LI Aiqun, LU Fengyong. REVIEW ON SEISMIC PERFORMANCE OF CONNECTION JOINTS OF PREFABRICATED CONCRETE FRAME STRUCTURES[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(2): 171-185,152. doi: 10.13204/j.gyjzG20040805 |
[6] | MENG, Shaoping, CAI, Xiaoning. RESEARCH PROGRESS ON PRESTRESSED SELF-RESETTING CONCRETE FRAME STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2020, 50(1): 1-6. doi: 10.13204/j.gyjz202001001 |
[8] | Zhou Deheng, Li Aiqun, Jia Hong, Wang Wei, Guo Tong, Pan Zhihong. PROGRESS OF INVESTIGATION ON SEISMIC BEHAVIOR OF PRECAST CONCRETE FRAME STRUCTURES( Ⅰ) : STUDY OF JOINT PROPERTY[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(06): 95-100. doi: 10.13204/j.gyjz201406022 |
[9] | Li Aiqun, Wang Wei, Jia Hong, Pan Zhihong, Zhou Deheng, Cao Zhongmin, Shen Wei. PROGRESS OF INVESTIGATION ON SEISMIC BEHAVIOR OF PRECAST REINFORCED CONCRETE FRAME STRUCTURES(Ⅱ) : STRUCTURE PROPERTY STUDY[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(07): 137-140. |
[10] | Liu Jingbo, Liu Yangbing, Guo Bing, Yang Jianguo. PARAMETER ANALYSIS OF SEISMIC BEHAVIOR OF STEEL-CONCRETE COMPOSITE FRAME STRUCTURES[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(8): 96-100. doi: 10.13204/j.gyjz200908023 |
[11] | Han Jianqiang, Li Zhenbao, Song Xiaosheng. A NEW TYPE OF CONNECTION FOR ASSEMBLING CONCRETE FRAME:STUDY ON PRESTRESSED ASSEMBLING FRAME STRUCTURES CONSTRUCTION[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(11): 100-103. doi: 10.13204/j.gyjz200911023 |
[12] | He Sasa, Yu Zhiwu. A REVIEW OF RESEARCH ON SEISMIC PERFORMANCE OF MEGA-FRAME STRUCTURE SYSTEMS[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(5): 101-105. doi: 10.13204/j.gyjz200905022 |
[13] | Li Bin, Ren Limin, Shi Xiaoyan. EXPERIMENTAL RESEARCH ON BEHAVIOR OF CONCRETE-FILLED RHS FRAMES[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 97-101,105. doi: 10.13204/j.gyjz200811024 |
[14] | Wu Jing, Lu Jia-ping, Li Jin. RESEARCH ON TEMPERATURE STRESS OF CONCRETE FRAME STRUCTURES WITH LARGE LONGITUDINAL LENGTH[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(5): 20-22. doi: 10.13204/j.gyjz200605006 |
[15] | Chong Xun, Meng Shao-ping, Pan Qi-jian, Zhang Lin-zhen. STUDY ON FORM AND DESIGN APPROACH OF PRECAST PRESTRESSED CONCRETE FRAMES[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(5): 5-7. doi: 10.13204/j.gyjz200605002 |
[16] | Wang Gang, Yao Qianfeng. STUDY ON MODAL IDENTIFICATION OF FRAME STRUCTURE UNDER AMBIENT EXCITATION[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(12): 45-47. doi: 10.13204/j.gyjz200412012 |
[17] | Cao Yunzhong, Gan Gang, Tang Jinchum. COMPARATIVE STUDY ON THE STRUCTURAL PERFORMANCE BETWEEN PRESTRESSED CONCRETE FRAMES WITH CROSS COLUMN AND RECTANGULAR COLUMN[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(4): 40-42,56. doi: 10.13204/j.gyjz200404012 |