Experimental Research on Optimization of Containment Concrete Layered Pouring Height Considering Steel Liner Bearing Capacity
-
摘要: 为了研究内安全壳筒体混凝土分层浇筑高度调整对安全壳钢衬里受力状态的影响,设计了内安全壳筒体段试验模型,并开展了有限元分析。基于有限元分析结果布置了安全壳钢衬里受力状态监测设备,开展了内安全壳筒体混凝土分层浇筑高度优化试验。结果表明,混凝土浇筑侧压力、拉杆轴力、钢衬里板面外位移和钢衬里应变随浇筑高度呈阶梯式增长,并在浇筑完成后趋于稳定,显示出明显的分层累积效应。混凝土浇筑侧压力、拉杆轴力、钢衬里板面外位移试验值均低于数值计算值。钢衬里板应变与数值计算值吻合良好,各测点均保持在弹性工作阶段,未出现塑性发展趋势。在安全壳浇筑一次分段高度为4.2 m内的条件下,混凝土浇筑侧压力、钢衬里板变形及受力均处于可控范围,结构稳定性与施工安全性得到有效保证。Abstract: In order to investigate the effect of adjusting the layered pouring height of the inner containment cylinder concrete on the stress state of the steel liner, a scaled experimental model of the containment cylinder segment was designed and finite element analysis was conducted. Based on the numerical results, stress-monitoring devices were arranged on the steel liner, and optimization tests on the layered pouring height of the inner containment concrete were carried out. The results showed that the concrete lateral pressure, tie-rod axial force, out-of-plane displacement of the steel liner plate, and liner strain increased in a stepwise manner with the rise of pouring height and stabilized after completion, indicating a distinct cumulative effect of layered pouring. The measured values of concrete lateral pressure, tie-rod axial force, and liner displacement were all lower than the numerical predictions. The measured strains of the steel liner were in good agreement with the numerical results, and all monitoring points remained in the elastic stage without any sign of plastic development. Under the condition of a single 4.2 m pouring height, the lateral pressure, deformation, and stress state of the steel liner were all within controllable limits, ensuring structural stability and construction safety.
-
Key words:
- inner containment /
- concrete pouring height /
- steel liner /
- finite element analysis /
- lateral pressure
-
[1] 吴星怡,李鑫波,贡金鑫. 预应力混凝土安全壳时变预应力损失评估[J]. 建筑结构,2025,55(12):67-75. [2] 裴习平. VVER堆型核电站外穹顶钢模板施工技术创新研究[J]. 建筑技术,2025,56(7):772-775. [3] 侯佑胜,张兴斌,张家臻. 核电站大体积混凝土基础裂缝控制理论与方法[J]. 工业建筑,2025,55(1):182-187. [4] 高向华,苗圃,杨阳. 叠合型钢混凝土梁在核岛大跨屋盖中的可行性研究[J]. 建筑科技,2025,9(4):34-38. [5] TANG Y,ZHANG S,GAO J. Dynamic response of stainless steel-concrete-stainless steel containment structures in nuclear power plants under internal explosions[J]. Nuclear Engineering and Design,2026,12(2):448-459. [6] 武伟,赵建忠. 钢板墙模块在自密实混凝土施工中的侧压力特性-基于AP系列核电厂设计建造[J]. 工业技术创新,2021,8(2):106-110. [7] 孙美娟,张唐召,董月亮. 某核电站SC结构自密实混凝土施工工艺研究[J]. 工程技术研究,2020,5(19):128-129. [8] BA Z,CHONG X,HAN Q. Shaking table test study of a 1∶15 scale model of the reinforced concrete containment vessel for nuclear power plant[J]. Engineering Structures,2026,15(3):350-362. [9] JU S B,BAEK W J,PARK G H. Seismic fragility analysis of reinforced concrete shear walls with high-strength reinforcing bar for nuclear power plants[J]. Nuclear Engineering and Technology,2025,57(12):5(2):8-17. [10] 王建,夏光照,石立影. CAP1000核岛SC与RC结构施工技术[J]. 中华建设,2025(1):159-161. [11] 陈笋,周宇鹏,谢洪虎. 核电厂主设备支承锚固螺栓预紧力确定方法研究[J]. 核动力工程,2025,46(5):148-151. [12] 马军卫,陈秀杰,顾盛. 某核电站4号机组筏基大体积混凝土整浇施工温度监测研究[J]. 工程质量,2026,44(1):65-70. [13] 周崇刚. 特种双壳筒体结构安全壳施工安全风险预估及控制研究[D]. 西安:西安建筑科技大学,2020. [14] 吕光晔,黄阁,张健. 核电站筏板基础大体积混凝土裂缝控制关键技术研究[J]. 混凝土与水泥制品,2025(9):68-73. [15] 唐若洋. 单钢板-混凝土组合结构抗冲击性能及应用研究[D]. 北京:清华大学,2023. -
点击查看大图
计量
- 文章访问数: 14
- HTML全文浏览量: 4
- PDF下载量: 0
- 被引次数: 0
登录
注册
E-alert
登录
注册
E-alert
下载: