Taking a two-storey office building in Zhanjiang as the application object,it was studied the importance of
a full design and its optimization during the whole project construction. Through Tekla three-dimensional model and
node design,detail processing of drawings and material control,Tekla BIMsight collaborative design and collision
detection,etc. ,it was provided a proper way to achieve a better quality,a shorter construction period and a lower
cost project.