Wang Xin. THE STEEL STRUCTURES ERECTION FOR BEIJING INSTITUTE OF TECHNOLOGY GYMNASIUM[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(08): 140-143.
Citation:
Wang Xin. THE STEEL STRUCTURES ERECTION FOR BEIJING INSTITUTE OF TECHNOLOGY GYMNASIUM[J]. INDUSTRIAL CONSTRUCTION , 2014, 44(08): 140-143.
Wang Xin. THE STEEL STRUCTURES ERECTION FOR BEIJING INSTITUTE OF TECHNOLOGY GYMNASIUM[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(08): 140-143.
Citation:
Wang Xin. THE STEEL STRUCTURES ERECTION FOR BEIJING INSTITUTE OF TECHNOLOGY GYMNASIUM[J]. INDUSTRIAL CONSTRUCTION , 2014, 44(08): 140-143.
THE STEEL STRUCTURES ERECTION FOR BEIJING INSTITUTE OF TECHNOLOGY GYMNASIUM
Abstract
The structural form of hanging roof trusses by a main trussed arch was used for the steel roof of the sports
and culture gymnasium in Beijing Institute of Technology,whose main arch was a circular arch composed of steel
tubular trussed,and the roof truss was a curved truss composed of steel tubes. It was expounded the main process of
quality control of the steel roof of the gymnasium by means of the quality management in the stages of optimization
design,member processing,construction and erection of the steel main arch and steel trusses.
References
Relative Articles
[1] ZOU Kongqing, LIU Guo, WU Yibing, DING Shihong, SONG Zhifeng. MECHANICAL ANALYSIS OF THE INTEGRAL LIFTING PROCESS FOR A LONG-SPAN AND COMPLEX ASSEMBLED STEEL ROOF [J]. INDUSTRIAL CONSTRUCTION, 2021, 51(5): 124-130,138. doi: 10.13204/j.gyjzG201906170007
[2] Zhou Yi. SLIDING FORM CONSTRUCTION TECHNOLOGY OF UREA PRILLING TOWER WITH AN ANNUAL OUTPUT OF 12 ×105 TONS FOR VLAN FERTILIZER PLANT [J]. INDUSTRIAL CONSTRUCTION, 2015, 45(6): 128-132. doi: 10.13204/j.gyjz201506025
[3] Yang Jiandong. CONSTRUCTION TECHNOLOGY FOR FOUNDATION COMPOSED OF INCLINED COLUMN,OBLIQUE TOP FACE AND SKEW ANCHOR BOLT [J]. INDUSTRIAL CONSTRUCTION, 2013, 43(10): 112-116. doi: 10.13204/j.gyjz201310024
[4] Tian E, Yang Zheng-jun, Li Yi, Lv Huang-bing, Peng Pai. DESIGN OF TEMPORARY TRESTLES FOR LARGE STEEL STRUCTURE CONSTRUCTIONS [J]. INDUSTRIAL CONSTRUCTION, 2012, 42(9): 157-161. doi: 10.13204/j.gyjz201209033
[5] Yang Wenwei, Zou Lei, Xi Wenke. INSTALLATION TECHNOLOGY OF TRUSS OF STEEL PIPE FOR GYMNASIUM ROOF OF NINGXIA UNIVERSITY [J]. INDUSTRIAL CONSTRUCTION, 2011, 41(8): 74-78. doi: 10.13204/j.gyjz201108019
[6] Peng Tian, Liu Zhenhua, Liu Xiangyu. SIMULATION OF CONSTRUCTION PROCESS OF LARGE BEAM STRING STRUCTURE [J]. INDUSTRIAL CONSTRUCTION, 2011, 41(5): 108-111,125. doi: 10.13204/j.gyjz201105024
[7] Chen Dachuan, Ouyang Pan. CONSTRUCTION QUALITY CONTROL OF FERROCEMENT MORTAR [J]. INDUSTRIAL CONSTRUCTION, 2009, 39(8): 28-29,37. doi: 10.13204/j.gyjz200908008
[8] Zhang Xianyi, Wu Huiying, Chen Huabin, Li Gang, Wang Yunchuan, Han Defei. QUALITY CONTROL REQUIRMENTS OF HOT ROLLING PROCESS FOR HRBF500 [J]. INDUSTRIAL CONSTRUCTION, 2009, 39(11): 9-12. doi: 10.13204/j.gyjz200911003
[9] Yu Qing, Yan Shanzhang. DISCUSSION ON THE PROCESS CONTROL METHOD OF POURING QUALITY OF CORE CONCRETE IN CONCRETE-FILLED STEEL TUBES [J]. INDUSTRIAL CONSTRUCTION, 2008, 38(9): 104-106. doi: 10.13204/j.gyjz200809029
[10] Wang Yuanqing, Tan Chengdong, Zhang Yong. DESIGN AND ANALYSIS OF FOUNDATION OF ARCHED CORRUGATED METAL ROOF [J]. INDUSTRIAL CONSTRUCTION, 2006, 36(2): 82-84. doi: 10.13204/j.gyjz200602024
[11] Xu Chuanxi, Stanley Tan C.S.. INSTALLATION AND MAINTENANCE OF MEMBRANE STRUCTURE [J]. INDUSTRIAL CONSTRUCTION, 2005, 35(1): 71-74,64. doi: 10.13204/j.gyjz200501023
[12] Tong Liping, Ren Junchao, Tang Bifeng. STUDY OF THE SUSPENDED CABLE-ARCH STEEL ROOF SYSTEM OF ZHENGZHOU INTERNATIONAL CONVENTION AND EXHIBITION CENTER [J]. INDUSTRIAL CONSTRUCTION, 2004, 34(3): 65-67. doi: 10.13204/j.gyjz200403020
[13] Chen Yiyi, Tian Hai, Chen Yangji. EXPERIMENTAL RESEARCH ON STEEL ROOF MAIN TRUSS OF NEW TERMINAL BUILDING IN CHONGQING JIANGBEI AIRPORT [J]. INDUSTRIAL CONSTRUCTION, 2004, 34(12): 27-31. doi: 10.13204/j.gyjz200412007
[14] Lou Junjie, Guo Yanlin, Miao Youwu, Lin Bing, Xu Yanlin, Cui Wei. THE INSTALLATION SCHEME AND ANALYSIS OF SECONDARY TRUSSES OF STEEL ROOF IN MACAO GYM [J]. INDUSTRIAL CONSTRUCTION, 2004, 34(12): 12-14,35. doi: 10.13204/j.gyjz200412003
Proportional views
Created with Highcharts 5.0.7 Amount of access Chart context menu Abstract Views, HTML Views, PDF Downloads Statistics Abstract Views HTML Views PDF Downloads 2024-06 2024-07 2024-08 2024-09 2024-10 2024-11 2024-12 2025-01 2025-02 2025-03 2025-04 2025-05 0 1 2 3 4 5
Created with Highcharts 5.0.7 Chart context menu Access Class Distribution FULLTEXT : 25.4 % FULLTEXT : 25.4 % META : 74.6 % META : 74.6 % FULLTEXT META
Created with Highcharts 5.0.7 Chart context menu Access Area Distribution 其他 : 17.9 % 其他 : 17.9 % 北京 : 26.9 % 北京 : 26.9 % 张家口 : 4.5 % 张家口 : 4.5 % 芒廷维尤 : 22.4 % 芒廷维尤 : 22.4 % 西宁 : 28.4 % 西宁 : 28.4 % 其他 北京 张家口 芒廷维尤 西宁