YU Gui, TONG Jiahui, SONG Yuqiu, YU Zhixiang. Research on Carbon Emission Accounting for Tunnel Exit Slope Construction Based on 3D Terrain Reconstruction[J]. INDUSTRIAL CONSTRUCTION, 2026, 56(10): 231-238. doi: 10.3724/j.gyjzG25091003
Citation: YU Gui, TONG Jiahui, SONG Yuqiu, YU Zhixiang. Research on Carbon Emission Accounting for Tunnel Exit Slope Construction Based on 3D Terrain Reconstruction[J]. INDUSTRIAL CONSTRUCTION, 2026, 56(10): 231-238. doi: 10.3724/j.gyjzG25091003

Research on Carbon Emission Accounting for Tunnel Exit Slope Construction Based on 3D Terrain Reconstruction

doi: 10.3724/j.gyjzG25091003
  • Received Date: 2025-09-10
    Available Online: 2026-11-06
  • Under the "dual-carbon" strategy, controlling carbon emissions during the tunnel construction phase has become critical for the low-carbon transition of transportation infrastructure. To address the limitation of traditional design-drawing-based methods, which cannot accurately reflect on-site construction conditions, this paper proposes a high-precision carbon accounting method based on three-dimensional(3D) terrain reconstruction. A 3D site modeling approach using UAV oblique photogrammetry and multi-view geometric reconstruction was developed to enable accurate extraction of the disturbance area and earthwork quantities. Based on the 3D terrain data, a multi-dimensional carbon accounting framework was established, covering mechanical operations, material transportation, and vegetation disturbance, thereby enabling precise estimation of construction-phase carbon emissions and facilitating construction scheme optimization. The proposed method was applied to a tunnel project on the Xi’an-Chongqing High-Speed Railway. The baseline scheme (Scheme 1) yielded 355296.6 kgCO2e. Two optimization schemes were further proposed: Scheme 2 reduced emissions by 33.83% by eliminating high-energy equipment and optimizing construction scheduling; Scheme 3, building on Scheme 2, reduced emissions by 34.31% by optimizing equipment configuration, improving machinery efficiency, and introducing photovoltaic power. At the same time, the optimized schemes reduced total construction cost from CNY 2.5517 million to CNY 2.0887 million.
  • loading
  • [1]
    XU B Q,LIU C. A 3D reconstruction method for buildings based on monocular vision[J]. Computer-Aided Civil and Infrastructure Engineering,2022,37(3):354-369.
    [2]
    POLLEFEYS M,NISTÉR D,FRAHM J M,et al. Detailed real-time urban 3D reconstruction from video[J]. International Journal of Computer Vision,2008,78(2):143-167.
    [3]
    LU Q C,SANGHOON L,ASCE A M. Image-based technologies for constructing as-is building information models for existing buildings[J]. Journal of Computing in Civil Engineering,2017,31(4):04017005.
    [4]
    HAN Y T,FENG D M,WU W W,et al. Geometric shape measurement and its application in bridge construction based on UAV and terrestrial laser scanner[J]. Automation in Construction,2023,151:104880.
    [5]
    CHANGHUN S,PAN Y K. 3D terrain reconstruction of construction sites using a stereo camera[J]. Automation in Construction,2016,64:65-77.
    [6]
    PUCKO Z,SUMAN N,REBOLJ D. Automated continuous construction progress monitoring using multiple workplace real time 3D scans[J]. Advanced Engineering Informatics,2018,38:27-40.
    [7]
    YAN X Z,ZHANG H,LI H. Computer vision-based recognition of 3D relationship between construction entities for monitoring struck-by accidents[J]. Computer-Aided Civil and Infrastructure Engineeringcv,2020,35(9):1023-1038.
    [8]
    LIU R,LIANG H,WANG Z Y,et al. Fusion-based high-quality polarization 3D reconstruction[J]. Optics and Lasers in Engineering,2023,162:107397.
    [9]
    REJA V K,VARGHESE K,HA Q P. Computer vision-based construction progress monitoring[J]. Automation in Construction,2022,138:104245.
    [10]
    周志祥,姜腾蛟,唐亮,等.移动式三维激光扫描系统在桥面全息变形监测的应用研究[J].应用基础与工程科学学报,2018,26(5):1078-1091.
    [11]
    熊文,石颖,丁旭东,等.基于点云模型的桥梁构件形态变化趋势识别与分析[J].桥梁建设,2018,48(6):35-40.
    [12]
    苑壮.基于无人机三维激光扫描技术的矿区岩移观测研究[D].济南:山东科技大学,2020.
    [13]
    RAZALI A F,ARIFF M F M,MAJID Z. A hybrid point cloud reality capture from terrestrial laser scanning and uav-photogrammetry[J]. The International Archives of the Photogrammetry,Remote Sensing and Spatial Information Sciences,2022,46:459-463.
    [14]
    鲍学英,韩通,霍雨雨.铁路轨道工程物化阶段碳排放预测及影响因素研究[J].铁道科学与工程学报,2024,21(10):4299-4310.
    [15]
    鲍学英,申中帅,刘北胜,等.铁路路基挡墙碳减排方案优选及降碳策略研究[J].铁道科学与工程学报,2024,21(9):3842-3853.
    [16]
    戴延泽,占曙光.考虑碳排放的城轨开行大小交路方案分析[J].铁道科学与工程学报,2022,19(12):3546-3556.
    [17]
    陈坤阳,段华波,张怡,等.广州地铁盾构隧道建设期碳排放强度与减排潜力研究[J].隧道建设(中英文),2022,42(12):2064-2072.
    [18]
    方海,曹子龙,凤振华,等.基于全生命周期理论的公路建设期碳排放核算方法及实证研究[J].公路工程,2021,46(1):92-97.
    [19]
    何青,李晔,张鑫.道路系统全生命周期碳排放量化分析框架:基于国际标准[J].城市交通,2022,20(1):102-109.
    [20]
    JIA S Y,LIU M H. Embodied GHG emissions of high speed rail stations:quantification,data-driven prediction and cost-benefit analysis[J]. Journal of Cleaner Production,2022,366:133006.
    [21]
    吴宏飞.基于正交试验的污水泵性能优化设计[J].水泵技术,2021(5):13-16.
    [22]
    万伦,宋文武,虞佳颖,等.叶片包角对高比转速离心泵水力性能的影响研究[J].人民长江,2018,49(15):96-100.
    [23]
    中华人民共和国住房和城乡建设部.建筑碳排放计算标准:GB/T 51366-2019[S].北京:中国建筑工业出版社,2019.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (25) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return