Source Journal of Chinese Scientific and Technical Papers
Included as T2 Level in the High-Quality Science and Technology Journals in the Field of Architectural Science
Core Journal of RCCSE
Included in the CAS Content Collection
Included in the JST China
Indexed in World Journal Clout Index (WJCI) Report
Volume 56 Issue 5
May  2026
Turn off MathJax
Article Contents
TANG Wei, HE Yifang, WU Chunran, WU Ya, FENG Zhiyuan, ZHAO Baojun, KOU Shicong. Formulation and Engineering Practice of the Shenzhen Local Standard Technical Standard for Green Demolition of Buildings[J]. INDUSTRIAL CONSTRUCTION, 2026, 56(5): 57-66. doi: 10.3724/j.gyjzG25050804
Citation: TANG Wei, HE Yifang, WU Chunran, WU Ya, FENG Zhiyuan, ZHAO Baojun, KOU Shicong. Formulation and Engineering Practice of the Shenzhen Local Standard Technical Standard for Green Demolition of Buildings[J]. INDUSTRIAL CONSTRUCTION, 2026, 56(5): 57-66. doi: 10.3724/j.gyjzG25050804

Formulation and Engineering Practice of the Shenzhen Local Standard Technical Standard for Green Demolition of Buildings

doi: 10.3724/j.gyjzG25050804
  • Received Date: 2025-05-08
    Available Online: 2026-06-06
  • Publish Date: 2026-05-20
  • The Shenzhen local standard, Technical Standard for Green Demolition of Buildings, was issued and implemented on January 31, 2025, by the Shenzhen Municipal Standards Committee. Based on this newly compiled standard, the definition, framework, application objectives, and demolition technologies for green demolition were analyzed; the current development status of building demolition methods was summarized and evaluated; and the principles for preparing a special green demolition scheme, which balances the goals of structural dismantling safety and comprehensive utilization of demolition waste, were elaborated. Furthermore, a practical application of the standard was carried out in a building demolition project in the Xinqiao East Area urban renewal project in Shenzhen. The results showed that the technical guidelines established in the standard enabled classified and orderly demolition of existing buildings, leading to classified and graded comprehensive utilization of demolition waste. This achieved an on-site utilization rate of 30% and a comprehensive utilization rate of 100% for the demolition waste, thereby improving the comprehensive utilization level and resource recovery efficiency of the project’s demolition waste. This established a technical paradigm for green demolition of buildings and provided a basis for the promotion and application of green demolition technologies.
  • loading
  • [1]
    GHAFFAR S H,BURMAN M,BRAIMAH N. Pathways to circular construction:an integrated management of construction and demolition waste for resource recovery[J]. Journal of Cleaner Production,2020,244:118710.
    [2]
    KÜPFER C,BASTIEN-MASSE M,FIVET C. Reuse of concrete components in new construction projects:Critical review of 77 circular precedents[J]. Journal of Cleaner Production,2023,383:135470.
    [3]
    肖建庄,张文泽,刘堡嘉,等. 城市中心区高层建筑绿色拆除方法[J]. 建筑科学与工程学报,2021,38(1):23- 30.
    [4]
    姜智盛,郑文忠,侯晓萌,等. 混凝土厚板和转换梁静态破碎试验[J]. 哈尔滨工业大学学报,2021,53(10):12- 22.
    [5]
    HUANG B L,ZHANG H,YANG W S,et al. Mechanical carbon emission assessment during prefabricated building deconstruction based on BIM and multi-objective optimization[J]. Scientific Reports,2024,14(1):1- 15.
    [6]
    贾永胜,孙金山,姚颖康,等. 我国拆除爆破研究进展与展望(1994—2024)[J]. 工程爆破,2024,30(5):45- 60.
    [7]
    HOANG N H,ISHIGAKI T,WATARI T,et al. Current state of building demolition and potential for selective dismantling in Vietnam[J]. Waste Management,2022,149:218- 227.
    [8]
    王小蕊. 浅析城市房屋建筑的拆除改造施工方法[J]. 江西建材,2014(24):208- 209.
    [9]
    侍晶晶. 历史建筑平移和加固改造施工关键技术研究[J]. 福建建筑,2024(1):108- 112.
    [10]
    陈磊,李雪峰,郝新同. 高速公路改扩建工程桥梁拆除施工技术研究[J]. 砖瓦,2021(10):172- 174.
    [11]
    黄旭雷,高林炎,余琳. 建筑工程拆除发展简述[J]. 居舍,2018(5):6.
    [12]
    马永红,高文朋,何贇,等. 面向核退役设施拆除的机器人遥操作系统设计及实现研究[J]. 机械工程师,2022(9):53- 56.
    [13]
    CHRISTIAN O C,NASID M M A,MASA N. Human-robot collaboration for building deconstruction in the context of construction 5.0[J]. Automation in Construction,2024,167.
    [14]
    叶建军,郭水龙,王建永,等. 高耸筒式建筑物破墙换柱绿色爆破拆除技术[J]. 爆破器材 2025,54(6):1- 8.
    [15]
    叶建军,程大春,詹小杰,等. 基坑支撑梁轴向预埋孔爆破拆除技术[J]. 爆破,2017,34(2):74- 79.
    [16]
    叶建军,彭庆波,肖建庄,等. 梁柱预埋孔机械切割异地爆破绿色拆除技术[J]. 建筑科学与工程学报,2023,40(6):111- 117.
    [17]
    程大春,叶建军,汪腊香,等. 钢筋混凝土梁柱轴向预埋孔长袋水耦合精确装药爆破拆除技术[J]. 爆破,2018,35(2):107- 113.
    [18]
    郑志涛,徐颖,倪红娟. 钻孔直径对静态破碎剂致裂性能影响试验分析[J]. 科学技术与工程,2016,16(2):7- 10.
    [19]
    李小龙. 混凝土定向静态破碎试验研究[D]. 哈尔滨:哈尔滨工程大学,2022.
    [20]
    王勃,崔洋,董丽欣. 基于随机森林算法的高层建筑机械拆除方法判断[J]. 低温建筑技术,2020,42(12):40- 42.
    [21]
    张志军,肖列,姜早龙,等. 新型绿色静力切割技术在城市核心区高架桥拆除工程中的应用研究[J]. 施工技术,2019,48(4):119- 124.
    [22]
    WANG J Y,WU H Y,DUAN H B,et al. Combining life cycle assessment and Building Information Modelling to account for carbon emission of building demolition waste:A case study[J]. Journal of Cleaner Production,2018,172:3154- 3166.
    [23]
    周贤舜,张学民,武朝光,等. 基于低碳减排的隧道水封爆破优化效果研究[J]. 铁道科学与工程学报,2023,20(3):996- 1007.
    [24]
    李欣,王猛,张发强,等. 大型体育场馆拆除施工仿真与方案优化探讨[J]. 建筑结构,2023,53(6):6- 11.
    [25]
    王斌. 某办公建筑结构耐久性检测与加固技术研究[J]. 中国建筑金属结构,2024,23(6):96- 98.
    [26]
    许海峰. 超高层项目的大型起重设备拆除施工工艺[J]. 建筑技术开发,2019,46(16):98- 99.
    [27]
    KIM S,KIM S A. A design support tool based on building information modeling for design for deconstruction:A graph-based deconstructability assessment approach[J]. Journal of Cleaner Production,2023,383:135343.
    [28]
    丁衎然,谢剑. 废旧建筑材料再利用与建筑的拆解[J]. 建筑结构,2016,46(9):100- 104.
    [29]
    陈茜,张强,马君彪,等. 高层建筑逆向拆除液压同步移位控制系统的设计研究[J]. 建筑科学,2021,37(1):133- 140.
    [30]
    肖建庄,陈立浩,叶建军,等. 混凝土结构拆除技术与绿色化发展[J]. 建筑科学与工程学报,2019,36(5):1- 10.
    [31]
    费思异,马天雨. 高层混凝土结构逆向拆除技术研究[J]. 建筑施工,2022,44(10):2507- 2510.
    [32]
    MIZUTANI R,YOSHIKAI S. A new demolition method for tall buildings Kajima cut & take down method[J]. Council on Tall Buildings and Urban Habitat Journal,2011,(6):36- 41.
    [33]
    中华人民共和国住房和城乡建设部. 混凝土结构通用规范:GB 55008—2021[S]. 北京:中国建筑工业出版社,2022.
    [34]
    曾亮,肖建庄,陈立浩,等. 建筑旋转平移的基本方法探究[J]. 建筑科学与工程学报,2021,38(4):57- 64.
    [35]
    杨洋,吴二军,蓝戊己,等. 连续桥梁顶升改造解联方案分析[J]. 水利与建筑工程学报,2013,11(6):35- 39.
    [36]
    STACEY M. Concrete:a studio design guide[M]. London:RIBA,2011.
    [37]
    LUO S,YE S,XIAO J,et al. Carbonated recycled coarse aggregate and uniaxial compressive stress-strain relation of recycled aggregate concrete[J]. Construction and Building Materials,2018,188:956- 965.
    [38]
    王社良,李涛,杨涛,等. 掺加硅粉及纤维的再生混凝土柱抗震性能试验研究[J]. 建筑结构学报,2013,34(5):122- 130.
    [39]
    SILVA R V,De BRITO J,DHIR R K. Use of recycled aggregates arising from construction and demolition waste in new construction applications[J]. Journal of Cleaner Production,2019,236:117629.
    [40]
    李航,唐碧波,凌兴文. 武汉绿地中心工程临时支撑爆破拆除绿色施工技术[J]. 施工技术,2015,44(4):18- 20.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (40) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return