Source Journal of Chinese Scientific and Technical Papers
Included as T2 Level in the High-Quality Science and Technology Journals in the Field of Architectural Science
Core Journal of RCCSE
Included in the CAS Content Collection
Included in the JST China
Indexed in World Journal Clout Index (WJCI) Report
Volume 56 Issue 8
Aug.  2026
Turn off MathJax
Article Contents
YAO Zhixiong, FANG Jiabin, XIA Huacan, CHEN Ximao, WU Bo, YANG Yawei. Analysis and Practice on the Influence of Large-Scale MJS Construction on Adjacent Existing High-Speed Railway Bridges[J]. INDUSTRIAL CONSTRUCTION, 2026, 56(8): 267-276. doi: 10.3724/j.gyjzG25031307
Citation: YAO Zhixiong, FANG Jiabin, XIA Huacan, CHEN Ximao, WU Bo, YANG Yawei. Analysis and Practice on the Influence of Large-Scale MJS Construction on Adjacent Existing High-Speed Railway Bridges[J]. INDUSTRIAL CONSTRUCTION, 2026, 56(8): 267-276. doi: 10.3724/j.gyjzG25031307

Analysis and Practice on the Influence of Large-Scale MJS Construction on Adjacent Existing High-Speed Railway Bridges

doi: 10.3724/j.gyjzG25031307
  • Received Date: 2025-03-13
    Available Online: 2026-11-06
  • To explore the impact of large-scale reinforcement construction using Metro Jet System (MJS) piles on existing high-speed railway bridges in coastal soft-soil areas and to optimize the construction scheme, this study is based on a large-scale soft-soil foundation reinforcement project along a railway in the Binhai area of Fuzhou. A three-dimensional mechanical model was developed to analyze the influence of both test-pile construction and large-scale reinforcement construction on adjacent existing high-speed railway bridges, and the optimized scheme was subsequently verified through field tests. The results indicated that the MJS test-pile construction induced deformation in the pier platform and pile foundation on the side adjacent to the reinforcement area. Specifically, the settlement of the pier platform was 0.16 mm, the horizontal displacement of the pier platform ranged from 0.45 mm to 0.72 mm, and the deformation of the pier-platform pile foundation varied between 0.27 mm and 0.42 mm. The deformed section of the pile foundation was primarily distributed in the middle and lower parts of the reinforced zone, with displacement increasing gradually from bottom to top with depth. All deformation values remained far below the control limits. For the large-scale MJS reinforcement construction, the differential settlement generated by the vertical construction sequence was 5.1% greater than that of the horizontal sequence and 10.75% greater than that of the outside-in sequence. In other words, the outside-in construction scheme proved to be the most effective, owing to the shielding and isolation effects provided by the piles that had hardened first. The group-pile disturbance effect induced by large-scale MJS pile construction on the high-speed railway bridge cannot be ignored. These findings offer practical guidance for the optimization of on-site construction schemes.
  • loading
  • [1]
    LI Z K,LV J B,XIE X D,et al. Mechanical characteristics of structures and ground deformation caused by shield tunneling underpassing highways in complex geological conditions based on the MJS method[J]. Applied Sciences,2021,11(19):9323-9323.
    [2]
    XIAO Z,XIE S,HU A,et al. Displacement control in irregular deep excavation adjacent to tunnel groups in structural soil:a case study of MJS cement-soil composite piles and grouting rectification[J/OL]. Case Studies in Construction Materials.[ 2025-03-13]. https://DOI:10.1016/J.CSCM.2024.E03085.
    [3]
    周立. 基于云贝叶斯网络盾构下穿铁路近接施工安全风险动态评价[J]. 工业建筑,2023,53(11):226-233.
    [4]
    徐平,张昂然,张瑞铎,等. 大断面矩形顶管下穿管线MJS加固效果研究[J]. 地下空间与工程学报,2024,20(增刊1):463-471.
    [5]
    耿天霜,张静,赵记领,等. 南京地铁7号线中胜站密贴下穿运营站MJS+水平冻结施工与实测研究[J]. 隧道建设(中英文),2024,44(1

    ):172-180.
    [6]
    徐晓兵,姜叶翔,童磊,等. 邻近地铁基坑后插型钢MJS工法桩试桩研究[J]. 地下空间与工程学报,2021,17(增刊2):854-860.
    [7]
    LIU W,ZHAO L,YAO C X,et al. Impact of shield tunnel Construction on adjacent railway bridge:protective measures and deformation control[J]. Buildings,2024,14(9):3024-3024.
    [8]
    ZHANG M Y,WANG H,MAO X J,et al. Monitoring-based assessment of the construction influence of benoto pile on adjacent high-speed railway bridge:case study[J]. Journal of Performance of Constructed Facilities,2019,33(1):0001258.
    [9]
    张品,钟志全,陈仁朋,等. MJS桩加固对上覆地铁运营隧道影响研究[J]. 地下空间与工程学报,2019,15(4):1164-1171.
    [10]
    李宗阳,张佳,褚方平. 地道基坑上跨盾构的实测分析及保护方案研究[J]. 地下空间与工程学报,2022,18(6):1979-1988.
    [11]
    弓毅伟,陈杰华,唐欣薇. 砂土地层暗挖施工结合MJS工法应用研究[J]. 施工技术(中英文),2024,53(23):36-41.
    [12]
    LUO Z Y,DENG Y H,ZOU B P,et al. Study on field test and seismic performance of MJS joint microdisturbance reinforcement on existing tunnel[J/OL]. Shock and Vibration.[ 2025-03-13]. https://doi.org/10.1155/2021/7709050.
    [13]
    肖子聪,江建洪,王占生,等. 黏土层中水平MJS水泥土强度分析[J]. 水利与建筑工程学报,2023,21(5):48-54.
    [14]
    吕明豪,韦成林,唐欣薇. 低净空大直径MJS工法在盾构穿越地下通道中的应用:以珠三角城际新白广机场T1—T2区间为例[J]. 隧道建设(中英文),2023,43(增刊1):434-442.
    [15]
    毛祖夏,杨兰强,李佳明. MJS工法与高压旋喷桩(双重管)挤土效应对比试验研究[J]. 隧道建设(中英文),2021,41(10):1699-1707.
    [16]
    翟志国,花楠,刘柳. MJS水平旋喷桩在京沈高铁盾构隧道联络通道中的应用[J]. 隧道建设(中英文),2021,41(增刊2):512-519.
    [17]
    睢博栋,贾敏才. 抽水井附近MJS桩施工引起的土体位移[J]. 地下空间与工程学报,2022,18(1):276-280.
    [18]
    陈志军,朱晨,潘晓东,等. 台州湾新区软土小应变硬化模型参数试验研究[J]. 工业建筑,2024,54(12):186-193.
    [19]
    沈丹祎,陈赟,罗敏敏,等. 宁波浅层软土小应变硬化土模型参数试验研究[J]. 岩土工程学报,2023,45(增刊1):114-118.
    [20]
    夏华灿. MJS工法在福州滨海涉铁软基加固工程中的应用研究[D]. 福州:福建工程学院,2023.
    [21]
    王博文. HSS模型在漫滩区基坑工程中的适用性研究[D]. 北京:北京建筑大学,2024.
    [22]
    董鑫,周峰,王旭东,等. 基坑数值分析中HSS模型参数试验及应用[J]. 科学技术与工程,2023,23(18):7878-7885.
    [23]
    姚志雄,夏华灿,黄敏,等. 福州滨海软土MJS工法桩加固施工及环境效应[J]. 地下空间与工程学报,2023,19(3):1019-1026.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (21) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return