TAN Zhicui, ZHANG Wenge, GUO Xiaodong, LIU Jia, LI Keke. Safety Risk Assessment Methods and Case Analysis of Cultural Heritage Buildings[J]. INDUSTRIAL CONSTRUCTION, 2025, 55(12): 47-52. doi: 10.3724/j.gyjzG24082101
Citation:
TAN Zhicui, ZHANG Wenge, GUO Xiaodong, LIU Jia, LI Keke. Safety Risk Assessment Methods and Case Analysis of Cultural Heritage Buildings[J]. INDUSTRIAL CONSTRUCTION, 2025, 55(12): 47-52. doi: 10.3724/j.gyjzG24082101
TAN Zhicui, ZHANG Wenge, GUO Xiaodong, LIU Jia, LI Keke. Safety Risk Assessment Methods and Case Analysis of Cultural Heritage Buildings[J]. INDUSTRIAL CONSTRUCTION, 2025, 55(12): 47-52. doi: 10.3724/j.gyjzG24082101
Citation:
TAN Zhicui, ZHANG Wenge, GUO Xiaodong, LIU Jia, LI Keke. Safety Risk Assessment Methods and Case Analysis of Cultural Heritage Buildings[J]. INDUSTRIAL CONSTRUCTION, 2025, 55(12): 47-52. doi: 10.3724/j.gyjzG24082101
1. Inspection and Certification Co.,Ltd,,MCC,Beijing 100088,China;
2. Faculty of Architecture,Civil and Transportation Engineering,Beijing University of Technology,Beijing 100124,China;
3. Key Research Base of Safety Assessment and Disaster Risk Control of Ancient Wooden Buildings,State Administration of Cultural Heritage,Beijing 100124,China;
4. Beijing Sanmao Construction Engineering Testing and Appraisal Co.,Ltd.,Beijing 100088,China
Received Date: 2024-08-21 Available Online:
2026-01-06
Cultural heritage buildings face many risk factors. How to conduct scientific and reasonable safety risk assessment of cultural heritage buildings is one of the most popular research contents in the cultural heritage industry. The risk assessment is divided into three stages: risk identification, risk analysis and risk assessment. In the risk identification stage, the risks faced by cultural heritage buildings are divided into five categories, covering most of the risk factors. In the stage of risk analysis, risk analysis is carried out for each category according to the total damage situation, management situation, protective measures, external living conditions, damage probability and other factors, and the risk level and score of the classification are determined. In the risk assessment stage, the comprehensive assessment score is calculated according to the classified risk analysis and the classified weight value, and the overall risk level, risk status and repair suggestions are determined. The three-stage assessment method was used to assess the safety risk of some cultural heritage buildings. The assessment results were in good agreement with the actual survey situation, which could reflect the current safety risk level of cultural heritage buildings.
Jr. PEDERSOLI J L,STEFAN M. A guide to risk management of cultural heritage[M]. Canada:ICCROM& Government of Canada/Canadian Conservation Institute,2016.
[5]
JONATHAN R J,CARMEN M G,MARÍA D J D,et al. Heritage risk index:a multi-criteria decision-making tool to prioritize municipal historic preservation projects[J]. Frontiers of Architectural Research,2020,9(2):403-418.