Source Journal of Chinese Scientific and Technical Papers
Included as T2 Level in the High-Quality Science and Technology Journals in the Field of Architectural Science
Core Journal of RCCSE
Included in the CAS Content Collection
Included in the JST China
Indexed in World Journal Clout Index (WJCI) Report
Volume 56 Issue 3
Mar.  2026
Turn off MathJax
Article Contents
WU Yunpeng, LUO Xinglong, SUI Bingqiang, YIN Hongbing. Analysis of the Construction and Formation for the Giant Inclined Arch and Long-Span Truss Roof of Xiamen New Stadium[J]. INDUSTRIAL CONSTRUCTION, 2026, 56(3): 294-300. doi: 10.3724/j.gyjzG23082917
Citation: WU Yunpeng, LUO Xinglong, SUI Bingqiang, YIN Hongbing. Analysis of the Construction and Formation for the Giant Inclined Arch and Long-Span Truss Roof of Xiamen New Stadium[J]. INDUSTRIAL CONSTRUCTION, 2026, 56(3): 294-300. doi: 10.3724/j.gyjzG23082917

Analysis of the Construction and Formation for the Giant Inclined Arch and Long-Span Truss Roof of Xiamen New Stadium

doi: 10.3724/j.gyjzG23082917
  • Received Date: 2023-08-29
    Available Online: 2026-04-11
  • Publish Date: 2026-03-20
  • The stadium roof of Xiamen New Sports Center is mainly composed of giant arches, connecting grid frames, roof trusses, and facade curtain wall supporting structures, etc. Two giant arches are arranged from south to north, and a connecting grid is arranged between them. The main truss is arranged from east to west, supported by the giant arches and the slanted columns of the stands; the east and west facades are equipped with curtain wall supporting structures. The main installation idea of the roof is “first the main structure, then the secondary structure, and finally the curtain wall structure”. Compared with the final formed structure, the structure’s geometry, load-transfer system, stiffness, boundary constraints, and load actions have been changing during the construction and forming processes, and the corresponding structure’s displacement and stress have also been changing continuously. The stress on some oblique struts at the temporary support points of the connecting grid is too large, and reinforcement measures need to be taken. After the installation is completed, small additional stresses and additional deformations are locally produced in the structure, which have little impact on the bearing capacity and normal use of the structure. This analysis can be used to judge the mechanical rationality of the roof installation scheme, provide a theoretical basis for the preparation of the construction scheme, and serve as a reference for the construction mechanics design of similar projects in the future.
  • loading
  • [1]
    王秀丽,冯竹君,任根立,等. 大型复杂体育馆钢结构施工过程模拟分析[J]. 北京交通大学学报,2020,44(6):17-24.
    [2]
    吴穷,王乾坤,任志刚,等. 大跨度钢结构施工过程仿真分析[J]. 工业建筑,2018,48(3):127-131.
    [3]
    陈亮. 大型复杂结构施工全过程模拟分析[D]. 西安:长安大学,2009.
    [4]
    罗永峰,王春江,陈晓明,等. 建筑钢结构施工力学原理[M]. 北京:中国建筑工业出版社,2009
    [5]
    王光远. 论时变结构力学[J]. 土木工程学报,2000,33(6):105-108.
    [6]
    卓新,董石麟. 施工阶段内力与变位叠加法及其应用[J]. 浙江大学学报,2003,37(5):557-559.
    [7]
    史洪泉. 大跨度空间钢结构施工全过程力学分析及考虑施工影响的若干要素研究[D]. 南京:东南大学,2005.
    [8]
    中国建筑设计研究院. 厦门新体育中心体育场施工图[Z]. 北京:中国建筑设计研究院,2021.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (13) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return