GAO Shen, CHENG Xuesong, DONG Minzhong, CHENG Baorui, ZHANG Yong, MA Yunkang. Impact Analysis and Deformation Control Measures for Zero-Distance Deep and Large Excavation Adjacent to Both Sides of an Existing Subway Station[J]. INDUSTRIAL CONSTRUCTION, 2025, 55(5): 217-225. doi: 10.3724/j.gyjzG23050303
Citation: GAO Shen, CHENG Xuesong, DONG Minzhong, CHENG Baorui, ZHANG Yong, MA Yunkang. Impact Analysis and Deformation Control Measures for Zero-Distance Deep and Large Excavation Adjacent to Both Sides of an Existing Subway Station[J]. INDUSTRIAL CONSTRUCTION, 2025, 55(5): 217-225. doi: 10.3724/j.gyjzG23050303

Impact Analysis and Deformation Control Measures for Zero-Distance Deep and Large Excavation Adjacent to Both Sides of an Existing Subway Station

doi: 10.3724/j.gyjzG23050303
  • Received Date: 2023-05-03
    Available Online: 2025-07-15
  • Based on the demand for three-dimensional urban development, the number and scale of subway superstructure projects are gradually increasing, which has a significant impact on existing subway stations and tunnels during the construction process in Tianjin’s soft soil areas. Taking the existing subway station topping project of Tianjin Subway Line 5 as a case study, the paper analyzed the entire excavation process, including pre-excavation dewatering, based on the measurement data. It further studied the impact of deep and large excavations with simultaneous two-sided excavation on existing subway stations and tunnels. A deformation control method for existing structures during construction by refining the dewatering scheme was proposed. The study showed that: 1) Simultaneous deep and large excavations on both sides exerted a huge impact on the existing subway station and tunnel structures between them. The vertical displacement of the existing structures risked exceeding the alarm value or even the control value. Additionally, the vertical and horizontal deformation patterns differed significantly between the existing structure and the new diaphragm wall: during the excavation process, the main structure of the station experienced continuous heave, while the diaphragm wall initially settled but transitioned to heave upon reaching the final excavation depth, with both structures ultimately reaching a similar heave value of approximately 11.0 mm. In terms of horizontal deformation, the newly constructed diaphragm wall exhibited progressively increasing outward displacement as excavation progressed, whereas the station structure showed an initial increase followed by a gradual reduction in horizontal displacement, resulting in a final horizontal displacement of the diaphragm wall that was more than twice that of the station structure. 2) The influence of dewatering in the excavation on the main body of the existing structure and the new diaphragm wall had a large difference. By formulating a refined dewatering scheme, controlled pre-settlement of the station structure could be achieved before excavation. This approach effectively minimized construction-induced heave of the existing station while ensuring compliance with deformation control standards for the new diaphragm wall and supporting structures, thereby guaranteeing construction safety.
  • loading
  • [1]
    杨艳红,扈芮嘉,孟宁. 天津地铁站域地下空间发展现状及策略研究[J]. 城市,2021(12):70-79.
    [2]
    刘波,范雪辉,王园园,等. 基坑开挖对临近既有地铁隧道的影响研究进展[J]. 岩土工程学报,2021,43(增刊2):253-258.
    [3]
    王立峰,庞晋,徐云福,等. 基坑开挖对近邻运营地铁隧道影响规律研究[J]. 岩土力学,2016,37(7):2004-2010.
    [4]
    朱炎兵,周小华,魏仕锋,等. 临近既有地铁车站的基坑变形性状研究[J]. 岩土力学,2013,34(10):2997-3002.
    [5]
    YANG T,XIONG S,LIU S,et al. Numerical analysis of the influence of deep foundation pit construction on adjacent subway stations in soft soil areas[J/OL]. Advances in Civil Engineering,2022(6)[ 2023-05-03]. https://doi.org/10.1155/2022/6071868.
    [6]
    章润红,刘汉龙,仉文岗. 深基坑支护开挖对临近地铁隧道结构的影响分析研究[J]. 防灾减灾工程学报,2018,38(5):857-866.
    [7]
    王利军,邱俊筠,何忠明,等. 超大深基坑开挖对邻近地铁隧道变形影响[J]. 长安大学学报(自然科学版),2020,40(6):77-85.
    [8]
    OU C Y,WU T S,HSIEH H S. Analysis of deep excavation with column type of ground improvement in soft clay[J/OL]. Journal of Geotechnical Engineering,1996,122(9)[ 2023-05-03]. https://doi.org/10.1061/(ASCE)0733-9410(1996)122:9(709).
    [9]
    伍尚勇,杨小平,刘庭金. 双侧深基坑施工对紧邻地铁隧道变形影响的分析[J]. 岩石力学与工程学报,2012,31(增刊1):3452-3458.
    [10]
    李成巍,李伟,梁志荣. 软土地区隧道两侧深基坑同步施工设计与分析[J]. 地下空间与工程学报,2018,14(增刊1):193-199.
    [11]
    CHEN S,CUI J,LIANG F. Case study on the deformation coupling effect of a deep foundation pit group in a coastal soft soil area[J/OL]. Applied Sciences,2022,12(12)[ 2023-05-03]. https://doi.org/10.3390/app12126205.
    [12]
    张治国,徐晨,刘明,等. 考虑基坑降水开挖影响的运营隧道变形分析[J]. 中国矿业大学学报,2015,44(2):241-248.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (50) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return