[1] | XIE Chongfeng, WANG Ninghui, FENG Peng, LIN Hongwei, DING Guozhen. Structural Analysis and Whole-Process Simulation of Ultra-Large ConcreteGravity-Based Structure in Arctic Ocean[J]. INDUSTRIAL CONSTRUCTION, 2024, 54(1): 46-55. doi: 10.3724/j.gyjzG23100822 |
[2] | HUA Qinchun, WANG Xiuli, WANG Kang, WANG Jinzhou, LI Yanyan, LI Chunlong. Progressive Collapse Analysis and Construction Process Monitoring for Long-Span Retractable Structures[J]. INDUSTRIAL CONSTRUCTION, 2024, 54(4): 90-98. doi: 10.3724/j.gyjzG23102005 |
[3] | WU Yongjingbang, JIN Nan, SHI Zhongqi, YUE Qingrui, ZHONG Rumian. Research Progress on Dynamic Characteristic Monitoring Methods of Super High-Rise Buildings[J]. INDUSTRIAL CONSTRUCTION, 2024, 54(1): 1-10. doi: 10.3724/j.gyjzG23071809 |
[4] | GAO Ke, DENG Deyuan, ZHU Hongping, WENG Shun, GAO Fei. Static and Dynamic Deformation Monitoring of Super High-Rise Buildings During the Construction Stage[J]. INDUSTRIAL CONSTRUCTION, 2024, 54(1): 130-139. doi: 10.3724/j.gyjzG23081112 |
[5] | WANG Jinrong, WANG Xiuli, GOU Baolong, WANG Yanxin. Analysis and Field Monitoring of the Influence of Temperature on the Lifting Process of Complex Long-Span Gymnasium Steel Structures[J]. INDUSTRIAL CONSTRUCTION, 2023, 53(8): 96-101,57. doi: 10.13204/j.gyjzG22102505 |
[6] | FANG Dongping, MA Ling, GUO Hongling, YANG Fabing, ZHANG Jinxun. RISK EVALUATION OF ACCIDENTS FOR SUPER HIGH-RISE BUILDINGS UNDER CONSTRUCTION Ⅰ: METHODS[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(11): 200-204. doi: 10.13204/j.gyjzG20031011 |
[7] | ZHOU Yuqi, YAN Peiyu. RESEARCH ON LONG-TERM EFFECT OF LARGE-DIAMETER ROCK-SOCKETED PILES AND FIELD MEASUREMENTS[J]. INDUSTRIAL CONSTRUCTION, 2020, 50(9): 106-111. doi: 10.13204/j.gyjzG20040106 |
[8] | SHU Xingping, DONG Yuchen, LU Beirong, CAI Jun. EXPERIMENTAL STUDY AND FINITE ELEMENT SIMULATION FOR SHEAR PROPERTIES OF CORE TUBES FOR THE STRUCTURE OF STAINLESS STEEL SANDWICH PANEL[J]. INDUSTRIAL CONSTRUCTION, 2020, 50(2): 10-16. doi: 10.13204/j.gyjz202002002 |
[9] | LI Qiang, ZHOU Ting, CHEN Zhihua, LIU Haonan. INFLUENCE OF NON-LOAD ACTION ON SUPER HIGH RISE BUILDINGS CONCRETE-FILLED SQUARE STEEL TUBE STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2020, 50(12): 150-159. doi: 10.13204/j.gyjzG19120105 |
[10] | Chen Zhihua, Niu Ben, Zhang Zhisheng. ANALYSIS OF STRESS MONITORING RESULTS OF KEY JOINTS IN STEEL STRUCTURE OF TIANJIN LIBRARY[J]. INDUSTRIAL CONSTRUCTION, 2015, 45(2): 154-158. doi: 10.13204/j.gyjz201502031 |
[11] | Wu Zhuo, Yao Qi, Ye Dong. OPTIMIZATION DESIGN OF SUPER HIGH-RISE FRAME-CORE TUBE STRUCTURE FOR ANHUI HOTEL[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(12): 163-167. doi: 10.13204/j.gyjz2001412028 |
[12] | Liu Wenyan. STRUCTURAL DESIGN OF A SUPER-HIGH-RISE OFFICE BUILDING[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(12): 157-162. doi: 10.13204/j.gyjz2001412027 |
[13] | Wang Zeqiang, Chen Xinli, You Deqing, Xu Ruilong, Xu Wenlei. THE CONSTRUCTION TECHNOLOGY OF PRESTRESSED STEEL STRUCTURE FOR SIYANG STADIUM[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(8): 97-101,88. doi: 10.13204/j.gyjz201208021 |
[14] | Zhang Xuewei, Li Xinkui, Xia Fei, Li Kuikui. SIMULATION ANALYSIS AND CONSTRUCTION MONITORING OF A LARGE SPAN STEEL GRID STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(12): 72-75. doi: 10.13204/j.gyjz201212016 |
[15] | Li Di, Wang Zhaoyang, Jiang Guanye, Zhou Ming, Tan Shenzhou. THE TOWER CRANE REASONABLE APPLICATION IN THE CONSTRUCTION OF SUPER HIGH-RISE BUILDING[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(12): 76-80,108. doi: 10.13204/j.gyjz201212017 |
[16] | Shao Jianwen, Gan Gang, He Yong, Mao Jianghong, Cui Heliang. CONSTRUCTION MONITORING AND PERFORMANCE ANALYSIS OF AN UNDERPINNING BRICK-CONCRETE STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(12): 141-145,105. doi: 10.13204/j.gyjz201112031 |
[17] | Xu Ruilong, You Deqing, Qin Jie, Jiang Zhenyan. THE CONSTRUCTION TECHNOLOGY OF THE BEAM STRING STRUCTURE FOR XIAMEN INTERNATIONAL CONFERENCE & EXHIBITION CENTER[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(12): 15-17. doi: 10.13204/j.gyjz200812005 |
[18] | Wang Zeqiang, Qin Jie, Li Guoli, Chen Xinli, Tekky I. Budisetia. THE CONSTRUCTION TECHNOLOGY OF PRESTRESSED STEEL STRUCTURE IN THE MAIN STADIUM FOR INDONESIAN COUNTRYWIDE GAME[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(12): 8-11. doi: 10.13204/j.gyjz200812003 |
[19] | Chen Dachuan, Hu Haibo. REINFORCEMENT AND CONSTRUCTION MONITORING OF A STRUCTURE AFTER FIRE[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(12): 106-109. doi: 10.13204/j.gyjz200812028 |
[20] | Xu Ruilong, Qin Jie, Li Guoli, Qin Yang, Zhang Wei. THE BEAM STRING STRUCTURE CONSTRUCTION TECHNOLOGY OF THE OLYMPIC TRAINING STADIUM FOR THE NATIONAL OLYMPIC SPORTS CENTER[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(1): 26-29. doi: 10.13204/j.gyjz200701008 |