[1] | LYU Zhilin, JIANG Xu, QIANG Xuhong, SUN Kai, DONG Hao. Feasibility Research on Strengthening Damaged Steel Structure with Self-Stress SMA[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(6): 174-182. doi: 10.13204/j.gyjzG20100301 |
[5] | Jiang Chao, Wu Jinzhi, Zhang Yigang. FEASIBILITY STUDY ON SPACE FRAME CONSIDERING THE PARTICIPATION OF ROOF ELEMENTS IN THE WORK UNDER WIND SUCTION EFFECT[J]. INDUSTRIAL CONSTRUCTION, 2015, 45(1): 27-31. doi: 10.13204/j.gyjz201501005 |
[6] | Zeng Fangjin, Wei Huixing, Wang Jun, Fu Hongtao. LABORATORY MODEL TEST OF TREATING SOFT SOIL GROUND USING DEEP AIR-BOOSTED VACUUM PRELOADING[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(07): 90-94. |
[7] | Zhang Zhi-hao, Zhang Hui-le, Han Xiao-meng. OPTIMIZATION ANALYSIS OF INDOOR MODEL TEST SCHEME FOR ROCK-SOCKED FOUNDATION PILE IN KARST AREA[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(9): 84-89. doi: 10.13204/j.gyjz201209019 |
[8] | Liu Jifeng, Liu Bo, Zhang Huizhi. EXPERIMENTAL STUDY ON THE SHIELD TUNNELING-INDUCED SURFACE SETTLEMENT[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(3): 91-98. doi: 10.13204/j.gyjz201103018 |
[9] | Zhang Zhong, Zhang Xinbin. FINITE ELEMENT ANALYSIS OF TEMPERATURE STRESS OF CPR1000 NUCLEAR POWER PLANT RAFT WITH DIFFERENT POUR THICKNESS[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(10): 102-104,147. doi: 10.13204/j.gyjz200910024 |
[10] | Zhang Jianxin, Zhao Jianjun, Sun Shiguang. MODEL TEST AND ANALYS IS OF EXCESS PORE WATE PRODUCED BY DRIVING PILE GROUP[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(1): 76-78. doi: 10.13204/j.gyjz200901016 |
[11] | Guo Jinjun, Shi Jianyong. LABORATORY STRAIN-HOLDING TESTS OF SET-UP OF JACKED-IN PILES IN SAND[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(7): 61-66. doi: 10.13204/j.gyjz200907018 |
[12] | Hu Lifeng, Zhang Zhao, Gong Weiming, Xu Guoping, Guo Chao. MODEL TEST ON BEARING CAPACITY OF COMPOSITE PILE FOUNDATION IN TOP-DOWN ORDER[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(11): 76-80. doi: 10.13204/j.gyjz200911018 |
[13] | Fu Yawei, Wang Guanhu[WT], Liu Zhiqun, Liu Wei. FEASIBILITY AND DESIGN METHOD OF PASSIVE SOLAR HOUSE IN NORTHWEST AREA[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(12): 120-123. doi: 10.13204/j.gyjz200812032 |
[14] | He Jie, Liu Jie, Chen Keliang, Min Changqing. EXPERIMENT OF COMPACTING EFFECTS OF STATIC PILING IN CLAY GROUND WITH TAPERED PILE[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(1): 74-75,109. doi: 10.13204/j.gyjz200801018 |
[15] | Qin Jie, Xu Ruilong, Qin Yang, Xu Yake, Gao Heng, Li Zhenbao. EXPERIMENTAL RESEARCH ON PRESTRESSING CONSTRUCTION TECHNOLOGY OF NATIONAL GYMNASIUM[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(1): 16-19. doi: 10.13204/j.gyjz200701005 |
[16] | Zou Chunlai, Zhou Bo, Fan Xiaogang. DESIGN WAY OF ENERGY-SAVING AND FEASIBILITY OF PASSIVE BUILDINGS[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(5): 45-47. doi: 10.13204/j.gyjz200705012 |
[17] | Li Xongwei, He Liming, Jiang Gang, Wang Xudong, Zai Jinmin. LABORATORY MODEL LOADING TEST OF RAFT FOUNDATION[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(5): 20-23. doi: 10.13204/j.gyjz200505005 |
1. | 刘勇,曹毅泽,吴薪柳,樊浩博,周怡晟,宋玉香,林家桢. 地铁盾构施工下穿既有明挖隧道模型试验研究. 中国铁道科学. 2024(01): 110-121 . ![]() | |
2. | 阿卜杜拉-穆塔里伯·凯特玛斯,田雨,路德春,杜修力. 围岩相对密实度对隧道掘进时地层沉降的影响. 工业建筑. 2021(07): 11-17 . ![]() | |
3. | 王鹏. 基于机器学习的地铁隧道施工扰动控制研究. 现代隧道技术. 2019(S2): 368-373 . ![]() | |
4. | 朱逢斌,缪林昌,林水仙. 盾构隧道动态施工诱发地面沉降试验研究. 中国安全科学学报. 2017(11): 116-120 . ![]() |