[1] | LIU Weiran, GUO Shida, FANG Bin, YU Haifeng, WANG Jiawei, GAO Renqing, YE Xihao, HAN Jiantian. Research on the Mechanical Properties of Steel Truss Support Platform During the Construction of the Roof of a Large-Scale Silo[J]. INDUSTRIAL CONSTRUCTION, 2025, 55(2): 263-270. doi: 10.3724/j.gyjzG22031614 |
[2] | YANG Hao, HUANG Liang, WU Xi, WEI Linggang. Field Vehicle Load Test and Numerical Analysis of GFRP Reinforced Sea Sand Concrete Pavement[J]. INDUSTRIAL CONSTRUCTION, 2024, 54(4): 200-206. doi: 10.3724/j.gyjzG23090504 |
[3] | WANG Jinrong, WANG Xiuli, GOU Baolong, WANG Yanxin. Analysis and Field Monitoring of the Influence of Temperature on the Lifting Process of Complex Long-Span Gymnasium Steel Structures[J]. INDUSTRIAL CONSTRUCTION, 2023, 53(8): 96-101,57. doi: 10.13204/j.gyjzG22102505 |
[4] | AN Daoyao. Safety Limit Analysis for the Whole Construction Process of a Super High-Rise Building Under Strong Earthquakes[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(3): 117-122. doi: 10.13204/j.gyjzG21062921 |
[5] | ZHOU Yan-ling, CAO Da-fu, WANG Kun, GE Wen-jie, LIU Jia-qi. Analysis of Creep Effect of Prestressed Concrete Continuous Beam Bridge in Construction Process[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(9): 101-107. doi: 10.13204/j.gyjzg21060914 |
[6] | LIANG Yan, WEI Yingying, FENG Haoqi, ZHAO Ming, GUO Jing. Simulation Analysis on Construction Processes of Long-Span and Complex Steel Frames with Inclined Pillars[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(2): 75-80. doi: 10.13204/j.gyjzG201902180009 |
[7] | GAO Peng, GE Changwen, LIU Maofang, MENG Lei, YIN Zongcheng, WANG Zhiqiang, GAN Zhengyong, YANG Xuan, ZHU Jie. Numerical Analysis of Crack Resistance of Concrete Structure of Ultra-Long Round Stadium During Construction[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(10): 94-99,110. doi: 10.13204/j.gyjzG22073006 |
[8] | HU Yang, WANG Qingfa, ZHENG Yu, WANG Xiuli, WU Kaikai. Analysis and Field Test Research on Construction Process of Cable Supported Grid Structure[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(1): 122-128. doi: 10.13204/j.gyjzG21110408 |
[9] | GUO Jian, HU Chengjie, LI Song, ZHU Minjun. NUMERICAL SIMULATION AND ANALYSIS OF STRONG WIND CLIMBING EFFECT ON ISLAND TERRAIN[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(4): 93-98. doi: 10.13204/j.gyjzG1907130005 |
[10] | Tian E Li Yi Yang Zhengjun Shao Xinyu Peng Pai, . REINFORCEMENT SIMULATION ANALYSIS AND MONITORING TECHNIQUE OF LOADED STEEL STRUCTURES[J]. INDUSTRIAL CONSTRUCTION, 2015, 45(7): 176-180. doi: 10.13204/j.gyjz201507035 |
[11] | Chen Xu. STUDY ON FIELD MEASUREMENT OF HIGH-FORMWORK WITH A HEIGHT OF 15 m[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(8): 106-108. doi: 10.13204/j.gyjz201308023 |
[12] | Xiong Xueyu, Cheng Chen, Li Yuan, LüPin. STUDY ON THE CONSTRUCTION PROCESS OF PRESTRESSED CONCRETE FRAME TAKING ACCOUNT OF THE IMPACT OF THE SECONDARY INTERNAL FORCE[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(12): 12-15. doi: 10.13204/j.gyjz201112003 |
[13] | Ma Yongfeng, Zhou Dingheng, Cao Liqiao, Fang Shitao. IN-SITU MONITORING AND ANALYSIS OF DEFORAMTION OF THE SUPPORT SYSTEM IN MULTI-ARCH TUNNEL[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(11): 75-80. doi: 10.13204/j.gyjz201011019 |
[14] | Zheng Jiang, Hao Jiping, Li Cunliang, Yang Xiaoli, Wang Xiantie, Liu Shaowen. MECHANICS EMULATION AND ANALYSIS OF THE HESHI STUPA OF FAMEN TEMPLE DURING THE CONSTRUCTION PROCESS[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(10): 90-95. doi: 10.13204/j.gyjz200910022 |
[15] | Zhang Hongliang, Liu Bo, Li Zenong, Wang Qun. NUMERICAL ANALYSIS OF REINFORCEMENT FOR A CRACKED MASONRY CHIMNEY[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(10): 108-111. doi: 10.13204/j.gyjz200710029 |
[16] | Liu Xuewu, Guo Yanlin, Zhang Qinglin, Liu Luyu. ANALYSIS OF INTERNAL FORCE AND DEFORMATION FOR THE NEW CCTV HEADQUARTERS DURING THE CONSTRUCTION PROCESS[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(9): 22-29. doi: 10.13204/j.gyjz200709004 |
[17] | Zhou Hongbo, . NUMERICAL SIMULATION OF LONG-TERM SETTLEMENT OF PILE FOUNDATION CONSIDERING CONSOLIDATION AND RHEOLOGICAL PROPERTIES OF SOILS[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(11): 76-82,97. doi: 10.13204/j.gyjz200611019 |
[18] | Liu An-jun, Gong Xiao-nan, Qian Guo-zhen. A NONLINEAR ANALYSIS OF COMBINED ACTIONS OF SOIL ANCHORS AND EARTH-RETAINING PILE WALL IN CONSIDERATION OF CONSTRUCTION STEPS[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(5): 74-78. doi: 10.13204/j.gyjz200605020 |
[19] | Mao Jinping, Xu Wei. RELIABILITY ANALYSIS OF ROCK- SOCKETED SUPPORT STRUCTURES WITH REAL- TIME DEFORMATION CONTROL[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(2): 42-44. doi: 10.13204/j.gyjz200602013 |
[20] | Guo Yanlin, Cui Xiaoqiang. KEY TECHNICAL PROBLEMS AND DISCUSSION IN CONSTRUCTION PROCESS OF LARGE SPAN STEEL STRUCTURES[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(12): 1-5,22. doi: 10.13204/j.gyjz200412001 |