Xu Guie, Fan Lihua. STUDY ON CONSTRUCTION TECHNOLOGY OF PHOENIX INTERNATIONAL MEDIA CENTER MOBIUS RING EXTERNAL WALL[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(03): 158-161. doi: 10.13204/j.gyjz201403031
Citation:
Xu Guie, Fan Lihua. STUDY ON CONSTRUCTION TECHNOLOGY OF PHOENIX INTERNATIONAL MEDIA CENTER MOBIUS RING EXTERNAL WALL[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(03): 158-161. doi: 10.13204/j.gyjz201403031
Xu Guie, Fan Lihua. STUDY ON CONSTRUCTION TECHNOLOGY OF PHOENIX INTERNATIONAL MEDIA CENTER MOBIUS RING EXTERNAL WALL[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(03): 158-161. doi: 10.13204/j.gyjz201403031
Citation:
Xu Guie, Fan Lihua. STUDY ON CONSTRUCTION TECHNOLOGY OF PHOENIX INTERNATIONAL MEDIA CENTER MOBIUS RING EXTERNAL WALL[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(03): 158-161. doi: 10.13204/j.gyjz201403031
The order of the Phoenix International Media Center Mobius ring shape wall by a plurality of different sizes of the face curtain wall,through scale-like organization,to form a continuous surface. Wall unit for each connection point plate deformation angle characteristics are not the same size,the design uses aluminum clad steel keel dustpan unitized curtain wall construction method,cell plate steel hoop ear plate fixed at its anchor point for the hoop screw center points,steel hoop in a horizontal plane through the deputy bearing left and right adjustment 25 mm, bearings and through the threaded stud between the upper and lower adjustable 30 mm,processing and installation of curtain wall to ensure accuracy,quality,and meet the deformation control requirements.