[1] | LI Aidong, HUANG Zhenfeng, SONG Boyang, LI Xiaozhong, ZHANG Chenming, YANG Li, ZHANG Sumei. Mechanical Properties of Inclined Steel-Reinforced Concrete Column Structure of Shenzhen Huangmugang Comprehensive Transportation Hub[J]. INDUSTRIAL CONSTRUCTION, 2024, 54(1): 86-95. doi: 10.3724/j.gyjzG23092513 |
[2] | LIU Liang, ZHAO Jun, ZHU Jiao, LI Ximin, SHEN Wentao, ZHANG Renqiang, LIN Dongyang, DAI Ruzhang, YU Peng, CHEN Bin. A New Construction and Erection Technique for Transmission Towers Based on Finite Element Model and Computer Vision[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(8): 64-70,90. doi: 10.13204/j.gyjzG22042602 |
[3] | ZHOU Qian. STUDY ON SOIL WORK OF ANCIENT BUILDINGS IN THE FORBIDDEN CITY[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(5): 204-211,203. doi: 10.13204/j.gyjzG20052404 |
[4] | Zhou Yi. SLIDING FORM CONSTRUCTION TECHNOLOGY OF UREA PRILLING TOWER WITH AN ANNUAL OUTPUT OF 12 ×105 TONS FOR VLAN FERTILIZER PLANT[J]. INDUSTRIAL CONSTRUCTION, 2015, 45(6): 128-132. doi: 10.13204/j.gyjz201506025 |
[5] | Zhu Jinfeng. CONSTRUCTION TECHNOLOGY OF SHANGHAI ZHONGSHAN HOSPITAL BULIDING[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(4): 168-174. doi: 10.13204/j.gyjz201304035 |
[6] | Yan Xiangmei, Guan Qiaoyan. SAFE CONSTRUCTION TECHNOLOGY ANALYSIS OF HENAN BROADCAST TV TOWER[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(5): 126-128. doi: 10.13204/j.gyjz2011205024 |
[7] | Wang Zeqiang, Chen Xinli, You Deqing, Xu Ruilong, Xu Wenlei. THE CONSTRUCTION TECHNOLOGY OF PRESTRESSED STEEL STRUCTURE FOR SIYANG STADIUM[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(8): 97-101,88. doi: 10.13204/j.gyjz201208021 |
[8] | Han Jiancong, Zhao Wei. APPLICATION OF CONSTRUCTION TECHNOLOGY OF BIG,FLEXIBLE AND LIGHT ROOFING IN A LARGE CONSTRUCTION PROJECT[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(5): 139-142. doi: 10.13204/j.gyjz201105030 |
[9] | Yan Xiangmei. JOINTLESS CONSTRUCTION TECHNOLOGY ANALYSIS OF FOUNDATION CONCRETE FOR HENAN TV TOWER[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(7): 92-95,73. doi: 10.13204/j.gyjz201107021 |
[10] | Wei Dexin, Jiang Jianrong, Di Wulong. THE MAIN SUSPENSION CABLE ERECTING TECHNOLOGY OF SELF-ANCHORED SUSPENSION BRIDGE[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(9): 108-112. doi: 10.13204/j.gyjz201109024 |
[11] | Li Yongkui, Jiang Xinshan, Chen Huanjun. INSTALLATION PLANNING AND TECHNOLOGY OF QUINCUNCIAL LONG-SPAN STEEL CONSTRUCTION[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(8): 118-122. doi: 10.13204/j.gyjz201008027 |
[12] | Wang Xiaodun, Liu Zhansheng, Chen Kun. STUDY ON THE CONSTRUCTION OF CABLE SUPPORTED STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(8): 35-41. doi: 10.13204/j.gyjz201008009 |
[13] | Zhang Xianyi, Wu Huiying, Chen Huabin, Li Gang, Wang Yunchuan, Han Defei. QUALITY CONTROL REQUIRMENTS OF HOT ROLLING PROCESS FOR HRBF500[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(11): 9-12. doi: 10.13204/j.gyjz200911003 |
[14] | Bu Liangtao, Peng Chao, Gao Wei. DESIGN AND CONSTRUCTION OF SELF COMPACTING CONCRETE IN REINFORCING A 130m HIGH RC SMOKESTACK[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(6): 113-116. doi: 10.13204/j.gyjz200806029 |
[15] | Wang Zeqiang, Qin Jie, Li Guoli, Chen Xinli, Tekky I. Budisetia. THE CONSTRUCTION TECHNOLOGY OF PRESTRESSED STEEL STRUCTURE IN THE MAIN STADIUM FOR INDONESIAN COUNTRYWIDE GAME[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(12): 8-11. doi: 10.13204/j.gyjz200812003 |
[16] | Yu Qing, Yan Shanzhang. DISCUSSION ON THE PROCESS CONTROL METHOD OF POURING QUALITY OF CORE CONCRETE IN CONCRETE-FILLED STEEL TUBES[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(9): 104-106. doi: 10.13204/j.gyjz200809029 |
[17] | Shen Bin, Qin Jie, Li Guoli, Qian Yingxin, Yang Zhiming. THE PRESTRESS CONSTRUCTION TECHNOLOGY OF A BEAM STRING STRUCTURE FOR BEIJING NORTH STATION[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(12): 12-14,25. doi: 10.13204/j.gyjz200812004 |
[18] | Bu Liang-tao, Gao Wei, Ye Zhen. RESEARCH ON CONSTRUCTION TECHNOLOGY OF USING HIGH CAPABILITY FERROCEMENT MORTAR TO STRENGTHEN A RC FRAME BEAM[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(8): 89-91,77. doi: 10.13204/j.gyjz200608027 |
[19] | Qin Jie, Shen Shi-zhao. CONSTRUCTION TECHNOLOGY AND EXPERIMENTAL STUDY ON PRESTRESSED CABLE ARCH STRUCTURES[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(5): 91-94. doi: 10.13204/j.gyjz200605024 |
[20] | Yu Dong, Qu Linhai, Guan Chuanfu. CONSTRUCTION TECHNOLOGY OF LARGE-SPAN STEEL STRUCTURE FOR A GYMNASIUM[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(3): 84-86. doi: 10.13204/j.gyjz200503028 |