Citation: | Niu Yufei. APPLICABILITY DESIGN OF LARGE CRAWLER CRANE FOR CONSTRUCTION OF THIRD GENERATION NUCLEAR POWER FACILITIES[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(9): 116-119. doi: 10.13204/j.gyjz201309022 |
孙汉虹.第三代核电技术AP1000[M].北京:中国电力出版社,2010.
|
[2] 西屋电气公司.西屋公司的AP1000 先进非能动型核电厂[J].现代电力,2006,23(05):55-65.
|
[3] 左学兵,林金平.浅谈AP1000 核岛施工设计变更管理[J].工业建筑,2012,42(增刊):802-804.
|
[4] 李永辉,孙炳禹.AP1000 机组模块化施工简介[J].工业设计,2011(9):146-149.
|
[5] 魏俊明,刘琼,孙坤.第三代压水堆核电机组AP1000 的模块化施工分析[J].电力建设,2008,29(4):63-66.
|
[6] 尹清辽.中国核电建设概况及第三代核电施工特点[J].建筑机械化,2010(8):36-38.
|
[7] GB /T 38112008 起重机设计规范[S].
|
[8] 郑明光,叶成,韩旭.新能源中的核电发展[J].核技术,2010,33(2):81-86.
|
[9] 张质文.起重机设计手册[M].北京:中国铁道出版社,1997:45-46.
|
[10] 王永峰,杜广波,李浩.AP1000 核电关键设备的制造特点及国产化[J].能源技术,2010,31(1):28-33.
|
[3] | Zhang Wenxue, Li Zengyin, Liu Long. COMPARISON AND ANALYSIS ON LATERAL PRESSURE OF CONCRETE FORMWORK FROM DIFFERENT FORMULAS[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(07): 132-136. |
[4] | Hu Changming, Zhao Yunbo, Wang Jie, Liu Fengyun. FINITE ELEMENT ANALYSIS OF COOPERATIVE EFFECTS OF FORMWORK-SUPPORTING SYSTEM AND CONCRETE FLOORS[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(05): 115-121. |
[5] | Zheng Lianqiong, Cai Xuefeng, Zhuang Jinping, Zhou Jizhong, Tuo Mingbei. ON-SITE MEASUREMENT AND ANALYSIS OF SUPER HIGH OR LARGE-SPAN FORMWORK SUPPORT WITH FASTENER STEEL TUBE[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(7): 96-100. doi: 10.13204/j.gyjz201307022 |
[6] | Lin Zhangzhang, Zhang Yi, Yang Junjie. ANALYSIS OF MULTI-STORY FORMWORK SUPPORTING SYSTEM BY DETECTION AND FEM[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(2): 94-98. doi: 10.13204/j.gyjz201302019 |
[7] | Bai Xue, Ma Haibin, Yao Chuanqin, Bai Rong. DESIGN AND MODAL ANALYSIS OF JACKING FORM SYSTEM FOR SUPER HIGH-RISE BUILDING[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(5): 14-17,51. doi: 10.13204/j.gyjz201305003 |
[8] | Zhang Xuezhi, Zhang Xuefeng, Ying Yimiao, Wang Senjun. ACTUAL MEASUREMENT AND ANALYSIS OF HIGH FORM STRUT OF FASTENER-STYLE STEEL PIPE SCAFFOLD SYSTEM[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(1): 15-18. doi: 10.13204/j.gyjz201101004 |
[9] | Mei Yuan, Hu Changming, Zhou Zhengyong, Jiang Ming, Wang Xia. STATISTICAL ANALYSIS OF LOADS OF SUPPORTING STRUCTURE FOR TALL AND LARGE FALSEWORK DURING CONSTRUCTION[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(2): 42-46. doi: 10.13204/j.gyjz201002010 |
[10] | Hu Changming, Mei Yuan, Dong Pan, Zhang Xiaoyong. ANALYSIS AND STUDY ON THE BEARING CAPACITY REDUCTION FACTOR OF COUPLER TALL FALSEWORK[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(2): 12-16. doi: 10.13204/j.gyjz201002003 |
[11] | Chen Zhihua, Han Juan, . STUDY ON ARCHITECTURAL CONCRETE AND ITS APPLICATION IN TIANJIN MUSEUM[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(4): 72-75. doi: 10.13204/j.gyjz200504021 |