Citation: | Ni Guowei, Jiang Xinliang. REINFORCEMENT AND REPAIR METHOD OF EARTHQUAKE DAMAGED CONCRETE STRUCTURES[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(2): 49-54,98. doi: 10.13204/j.gyjz201302010 |
JGJ 11698建筑抗震加固技术规程[S].
|
[2] 张熙光.建筑抗震鉴定加固手册[M].北京:中国建筑工业出版社,2000:598.
|
[3] 中国建筑工业出版社.唐山地震抗震调查总结资料选编[M].北京:中国建筑工业出版社,1977:75-76.
|
[4] Maleh A M, Saadatmanesh H. Ultimate Shear Capacity ofReinforced Concrete Beams Strengthened with Web-bonded Fiberreinforced Plastic Plates[J]. ACI Structural Journal,2008(36):221-222.
|
[5] 王冬雁.无粘结预应力装配混凝土节点抗震及震损加固性能研究[D].北京工业大学,2008.
|
[6] Miyauchi K, Inoue S, Nishibayashi Setal. Shear Behavior ofReinforced Concrete Beam Strengthened with CFRP Sheet[J].Transactions of the Japan Concrete Institute.2007(19).102-103.
|
[7] 赵彤,谢剑.碳纤维布补强加固混凝土结构新技术[M].天津:天津大学出版社,2001:85-104.
|
[8] 张柯,岳清瑞,赵树红.碳纤维布加固混凝土改善延性的试验研究[J].工业建筑,2000,30(2):237-241.
|
[9] 刘波,倪国葳.地震损伤钢筋混凝土结构修复加固方法的试验研究[D].河北联合大学,2011.
|
[10] 曲哲.摇摆墙-框架结构抗震损伤机制控制及设计方法研究[D].北京:清华大学,2010.
|
[11] Zhang G W, Xiao Y, Kunnath S. Low-cycle Fatigue Damage ofCircular Concrete2 filled2 tube Columns[J]. ACI St ructuralJournal,2009,106(2):151-159.
|
[12] Yan Z H, AuftT K. Nonlinear Dynamic Analysis of Frames withPlastic Hinges at Arbit rary Locations[J]. The St ructural Designof Tall and Special Buildings,2009,18(3):313-325.
|
[13] Guna Y S, Korol YK M, Mar D, et al. Infill Wallsas a Spine toEnhance the Seismic Performance of Non-ductile ReinforcedConcrete Frames[C]∥ ASCE. Proceedings of the 2009 ATC & SEIConference on Improving the Seismic Performance of ExistingBuildings and Other St ructures. San Francisco: ASCE,2009:1093-1104.
|
[14] Bao Y H, Kunnath S K, EL-TAWIL S, et al. Macromodel-basedSimulation of Progressive Collapse:RC Frame St ructures[J].Journal of the St ructural Engineering,2008,134(7):1079-1091.
|
[15] 苏幼坡,张玉敏,王绍杰,等.从汶川地震看提高建筑结构抗倒塌能力的必要性和可行性[J].土木工程学报,2009,42(5):25-32.
|
[16] 张富文,吕西林.框架结构不同倒塌模式的数值模拟与分析[J].建筑结构学报,2009,30(5):119-125.
|
[17] 林旭川,潘鹏,叶列平,等.汶川地震中典型 RC 框架结构的震害仿真与分析[J].土木工程学报,2009,42(5):13-20.
|