Gong Xiao-tao, Zhang Zhi-hao, Ma Lin, Yang Song. APPLICATION OF VIBRO REPLACEMENT STONE COLUMN-PLAIN CONCRETE PILE COMPOSITE FOUNDATION IN TREATMENT OF THE NEWLY RECLAIMED KARST AREA[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(10): 166-170. doi: 10.13204/j.gyjz201210035
Citation:
Gong Xiao-tao, Zhang Zhi-hao, Ma Lin, Yang Song. APPLICATION OF VIBRO REPLACEMENT STONE COLUMN-PLAIN CONCRETE PILE COMPOSITE FOUNDATION IN TREATMENT OF THE NEWLY RECLAIMED KARST AREA[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(10): 166-170. doi: 10.13204/j.gyjz201210035
Gong Xiao-tao, Zhang Zhi-hao, Ma Lin, Yang Song. APPLICATION OF VIBRO REPLACEMENT STONE COLUMN-PLAIN CONCRETE PILE COMPOSITE FOUNDATION IN TREATMENT OF THE NEWLY RECLAIMED KARST AREA[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(10): 166-170. doi: 10.13204/j.gyjz201210035
Citation:
Gong Xiao-tao, Zhang Zhi-hao, Ma Lin, Yang Song. APPLICATION OF VIBRO REPLACEMENT STONE COLUMN-PLAIN CONCRETE PILE COMPOSITE FOUNDATION IN TREATMENT OF THE NEWLY RECLAIMED KARST AREA[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(10): 166-170. doi: 10.13204/j.gyjz201210035
Taking a project in Dalian for example,it was analyzed the characteristics and difficulties of the ground improvement in newly reclaimed complex karst areas,i t was proposed a the workable,more innovative composite foundation improvement method: composite foundation combined vibro replacement stone colunmn and plain concrete pile.The paper also introduced its application in a newly redaimed area with complex cavity.