Sun Bin, Yang Jiang-hong. DETECTION APPRAISAL AND TREATMENT OF OVERALL RISING OF A BASEMENT[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(10): 159-161. doi: 10.13204/j.gyjz201210033
Citation:
Sun Bin, Yang Jiang-hong. DETECTION APPRAISAL AND TREATMENT OF OVERALL RISING OF A BASEMENT[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(10): 159-161. doi: 10.13204/j.gyjz201210033
Sun Bin, Yang Jiang-hong. DETECTION APPRAISAL AND TREATMENT OF OVERALL RISING OF A BASEMENT[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(10): 159-161. doi: 10.13204/j.gyjz201210033
Citation:
Sun Bin, Yang Jiang-hong. DETECTION APPRAISAL AND TREATMENT OF OVERALL RISING OF A BASEMENT[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(10): 159-161. doi: 10.13204/j.gyjz201210033
A building was framed structure consisting of one undergound floor and three surface floors,whose total height was 15. 90 m,and total floor area being 7 800 m2 .An overall rising of its basement was produced and different degrees of damages occurred on partial concrete members due to continuous heavy rain after the completion of the basement.