Du Shubo, Sun Shengnan, Li Huiyong. BIM PRACTICE IN DATONG LIBRARY WITH RHINO[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(8): 169-171,168. doi: 10.13204/j.gyjz201208034
Citation:
Du Shubo, Sun Shengnan, Li Huiyong. BIM PRACTICE IN DATONG LIBRARY WITH RHINO[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(8): 169-171,168. doi: 10.13204/j.gyjz201208034
Du Shubo, Sun Shengnan, Li Huiyong. BIM PRACTICE IN DATONG LIBRARY WITH RHINO[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(8): 169-171,168. doi: 10.13204/j.gyjz201208034
Citation:
Du Shubo, Sun Shengnan, Li Huiyong. BIM PRACTICE IN DATONG LIBRARY WITH RHINO[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(8): 169-171,168. doi: 10.13204/j.gyjz201208034
The integration concept by BIM is widely recognized in construction and it will be the mainstream in thefuture.BIM is very important to collaborate every stage during the full life-cycle of a building, because BIM havepowerful advantage in integration and processing of data.As a design software, it is necessary for Rhino to connectwith BIM.It was introduced the application of Rhino during the steel design and construction of Datong Library, andshowed the guiding role and effectiveness of solving the problem during the design and construction of a complex steelstructure.