Lin Rende. FINITE ELEMENT AND EXPERIMENTAL ANALYSIS ON FLUSH ENDPLATE BEAM-COLUMN JOINT OF PORTAL FRAME[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(8): 128-132,138. doi: 10.13204/j.gyjz201208026
Citation:
Lin Rende. FINITE ELEMENT AND EXPERIMENTAL ANALYSIS ON FLUSH ENDPLATE BEAM-COLUMN JOINT OF PORTAL FRAME[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(8): 128-132,138. doi: 10.13204/j.gyjz201208026
Lin Rende. FINITE ELEMENT AND EXPERIMENTAL ANALYSIS ON FLUSH ENDPLATE BEAM-COLUMN JOINT OF PORTAL FRAME[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(8): 128-132,138. doi: 10.13204/j.gyjz201208026
Citation:
Lin Rende. FINITE ELEMENT AND EXPERIMENTAL ANALYSIS ON FLUSH ENDPLATE BEAM-COLUMN JOINT OF PORTAL FRAME[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(8): 128-132,138. doi: 10.13204/j.gyjz201208026
The bearing capacity tests of 4 flush endplate connections of portal frame with different details were carriedout along with their finite elements analyses to comprehend the mechanical property of such connections in practice.The behaviors of these connections under positive and negative moment were analyzed by finite elements method.Theresults show that setting ribbed stiffener in joint panel zone will remarkable increase the bearing capacity, merelythickening the beam endplate will not improve the bearing capacity, the nonlinear character appears in relatively earlystage for flute type column-beam connections.
[2] Guo B,Su M,Lei S.Experimental Behavior of Rigid and Semirigid Steel Frames Under Cyclic Loading[C]∥Proceedings of the12th International Conference on Engineering,Science,Construction,and Operations in Challenging Environments.2010:2785-2792.
CECS102∶2002门式刚架轻型房屋钢结构技术规程[S].
[3] Trker T,Kartal M E,Bayraktar A,et al.Assessment of Semi-Rigid Connections in Steel Structures by Modal Testing[J].Journal of Constructional Steel Research,2009,65(7):1538-1547.
[4] Mehrabian A,Ali T,Haldar A.Nonlinear Analysis of a Steel Frame[J].Nonlinear Analysis:Theory,MethodsApplica-tions,2009,71(12):616-623.
[5] Aribert J M,Dinga O N.Modeling and Experimental Investigation of Bolted Flush End-Plate Composite Beam-to-Column Joints[J].ASCE,2000(62):711-724.
Lin Rende. FINITE ELEMENT AND EXPERIMENTAL ANALYSIS ON FLUSH ENDPLATE BEAM-COLUMN JOINT OF PORTAL FRAME[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(8): 128-132,138. doi: 10.13204/j.gyjz201208026
Lin Rende. FINITE ELEMENT AND EXPERIMENTAL ANALYSIS ON FLUSH ENDPLATE BEAM-COLUMN JOINT OF PORTAL FRAME[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(8): 128-132,138. doi: 10.13204/j.gyjz201208026