Wang Zeqiang, Chen Xinli, You Deqing, Xu Ruilong, Xu Wenlei. THE CONSTRUCTION TECHNOLOGY OF PRESTRESSED STEEL STRUCTURE FOR SIYANG STADIUM[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(8): 97-101,88. doi: 10.13204/j.gyjz201208021
Citation:
Wang Zeqiang, Chen Xinli, You Deqing, Xu Ruilong, Xu Wenlei. THE CONSTRUCTION TECHNOLOGY OF PRESTRESSED STEEL STRUCTURE FOR SIYANG STADIUM[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(8): 97-101,88. doi: 10.13204/j.gyjz201208021
Wang Zeqiang, Chen Xinli, You Deqing, Xu Ruilong, Xu Wenlei. THE CONSTRUCTION TECHNOLOGY OF PRESTRESSED STEEL STRUCTURE FOR SIYANG STADIUM[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(8): 97-101,88. doi: 10.13204/j.gyjz201208021
Citation:
Wang Zeqiang, Chen Xinli, You Deqing, Xu Ruilong, Xu Wenlei. THE CONSTRUCTION TECHNOLOGY OF PRESTRESSED STEEL STRUCTURE FOR SIYANG STADIUM[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(8): 97-101,88. doi: 10.13204/j.gyjz201208021
The stadium was built in Siyang County of Jiangsu Province.The cable stayed gridding structure is used forthe stadium.The designed tensile force was gained from the calculation software of Midas/Gen.And the simulationcalculation was carried out in detail according to the construction course.The construction course of steel and cablewas introduced.According to character of this project, the construction methods of tensioning the front and backcables of the same pillar in the same time were provided.The cable force and the distortion were monitored in thecourse of construction.According to the construction simulation results, the rationality and correctness of constructionmonitoring were proposed.Which provided a basis for the methods of steel construction and prestressed construction.