[1] | ZHANG Ailin, LI Ying, JIANG Ziqin, ZHANG Like. Research on the Influence of Different Parameters on the Hysteretic Performance of Buckling-Constrained Prefabricated Beam-Column Joints[J]. INDUSTRIAL CONSTRUCTION, 2025, 55(1): 65-74. doi: 10.3724/j.gyjzG23021614 |
[2] | ZHOU Zhijun, TIAN Yeqing, ZHANG Mingyi, WANG Kangchao, ZHU Shanshan. Analysis on Bearing Characteristics of Pile Groups with Post-Grouting at Pile Ends in Loess Areas[J]. INDUSTRIAL CONSTRUCTION, 2024, 54(3): 182-190. doi: 10.3724/j.gyjzG22090209 |
[3] | JIANG Zhenyu, XIE Huibing. Research on Integration of Detection and Analysis for Rigid-Frame Bridges Based on BIM[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(2): 180-185. doi: 10.13204/j.gyjzG21041612 |
[4] | ZHANG Beibei, WU Tingliang, WANG Yusong, JIN Mingchao. Stability Analysis on Foundation Treatment for a Transverse Karst Cave in Guiyang[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(4): 133-139. doi: 10.13204/j.gyjzG21032405 |
[5] | Shao Yahui, Ke Shitang, Ge Yaojun, Zhao Xinyue. THE STRENGTH AND STABILITY ANALYSIS OF SUPER LARGE COOLING TOWERS WITH GAS FLUE[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(03): 80-84. doi: 10.13204/j.gyjz201403018 |
[6] | Meng Xian-de, Long Ping, Zhang Xin, Hu Xin-wei, Zhao Xu-qian. RESEARCH ON BRACE-FRAME JOINTS OF HIGH-RISE STEEL STRUCTURES[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(10): 137-141. doi: 10.13204/j.gyjz201210028 |
[7] | Sun Ying-xia, Zhang Zhi-hao, Wang Jin-an. FAILURE PATTERN STUDY AND STABILITY ANALYSIS OF PILE FOUNDATION IN KARST AREA[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(9): 96-102. doi: 10.13204/j.gyjz201209021 |
[8] | LüJiangen, Wang Ronghui. DETERIORATION EXAMINATION AND REINFORCEMENT OF CFST TIED ARCH BRIDGE[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(8): 158-161. doi: 10.13204/j.gyjz201208031 |
[10] | Peng Xiaochuan, Wang Lei, Ye Xiaoling. THE CAUSE ANALYSIS OF THE DAMAGED LADDER BEAM MEMBERS FOR STAIRCASES AFTER EARTHQUAKE AND REINFORCEMENT DESIGN[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(8): 118-120. doi: 10.13204/j.gyjz201108028 |
[11] | Wang Xinghua, Lei Ming. ANALYSIS OF NEGATIVE PRESSURE DISTRIBUTION OF VERTICAL DRAINAGE CHANNELS FOR STABILIZATION OF ROADBED BY VACUUM PRELOADING[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(10): 86-90. doi: 10.13204/j.gyjz201010019 |
[12] | Chun Qing, Li Jinbao, Pan Jianwu. REINFORCEMENT DESIGN OF PIERS FOR A RAILWAY BRIDGE[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(10): 6-10. doi: 10.13204/j.gyjz201010002 |
[13] | LüFanren, Yin Jiming, Jin Yaohua, Yao Rong. ANALYSIS OF PILE IN CONSIDERATION OF PLASTIC INTERACTION BETWEEN PILE AND SOIL[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(7): 52-55,41. doi: 10.13204/j.gyjz201007014 |
[14] | Liu Hui, Peng Chuan, Chen Yonggui, Rao Zhong. STUDY OF CONSTRUCTION MONITORING FOR HIGHWAY TUNNEL CROSSING A BIG CAVE[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(8): 128-131. doi: 10.13204/j.gyjz201008029 |
[15] | Wang Zhen, Zhang Tianshen. THE STRENGTHENING DESIGN OF A RC TRIPLE HINGED ARCH NATATORIUM[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(2): 115-117. doi: 10.13204/j.gyjz200902022 |
[16] | Zhang Huaijing, Li Weixun. ANALYSIS OF INFLUENCE OF SUBWAY STATION TRANSFER CHANNEL EXCAVATION ON EXISTING PILE FOUNDATION[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(11): 81-85. doi: 10.13204/j.gyjz200911019 |
[17] | Zhang Weixi, Chen Ping, Zhao Dong, Mao Xiaofei. ANALYSIS AND STRENGTHENING OF STRUCTURAL DEFECTS OF THE SOUTHWESTERN BIG TEMPLE IN ANCIENT CITY OF GAOCHANG[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(8): 86-88,106. doi: 10.13204/j.gyjz200708022 |
[18] | Zhang Kechun, Lu Zhoudao, Yuan Tingpeng, Wang Liguo. THEORY OF PERFORMANCE-BASED REHABILITATION DESIGN WITH CARBON FIBER REINFORCED POLYMER[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(12): 90-92,99. doi: 10.13204/j.gyjz200612025 |
[19] | Duan Yonghui, Xiao Zhaoran, Zhang Zhao. RESEARCH AND COMPARATION OF MECHANICAL BEHAVIORS OF COMPOSITE FOUNDATION WITH RIGID PILES AND THE ONE WITH FLEXIBLE PILES BY 3-D FEM[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(2): 54-56. doi: 10.13204/j.gyjz200602016 |
[20] | Liu Qijian, Yang Linde. ANALYSIS OF VERTICAL BEARING CAPACITY AND DISPLACEMENT BY THE SETTLEMENT OF PILE TOP[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(3): 35-37. doi: 10.13204/j.gyjz200503014 |