[1] | FENG Jiangquan, HUANG Leiqun, HUANG Zhenhua, ZHANG Wei. DESIGN AND CONSTRUCTION OF PREFABRICATED SPINNING STEEL PIPE PILES WITH ENLARGED ENDS[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(3): 158-164. doi: 10.13204/j.gyjzS20052504 |
[2] | WANG Lei, YU Feng, WANG Zijun. A DESIGN METHOD FOR BEARING CAPACITY OF STEEL PIPE PILES IN CLAYEY SOIL BASED ON CONE PENETRATION TESTS[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(10): 163-169. doi: 10.13204/j.gyjzG20092205 |
[3] | LIU Zhongyu, LI Qingkai, ZHU Xinmu, XIA Yangyang. ANALYSIS OF RADIAL ELASTIC VISCO-PLASTIC CONSOLIDATION FOR IDEAL SAND-DRAINED GROUND BASED ON HANSBO'S FLOW[J]. INDUSTRIAL CONSTRUCTION, 2020, 50(3): 96-101,108. doi: 10.13204/j.gyjz202003016 |
[4] | Wu Lichun, Wang Houxing, Yin Qingfang. EFFECTS OF RAMMING ENERGY OF DYNAMIC CONSOLIDATION ON THE IMPROVEMENT OF SATURATED HYDRAULIC FILL[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(1): 128-132. doi: 10.13204/j.gyjz201201024 |
[5] | Yang Hai-yong, Bai Yin, Xing Yi. CONSTRUCTION METHOD FOR CERAMIC PLATE CURTAIN WALL OF CENTURY HALL IN TSINGHUA UNIVERSITY[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(9): 129-133. doi: 10.13204/j.gyjz201209028 |
[6] | Wen Yanfang, Ning Lianwang. PREFABRICATED CREATIVE ENERGY-SAVING PANELS OF INSULATION AND DECORATION FOR BUILDING FACADE[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(12): 25-27,83. doi: 10.13204/j.gyjz201012008 |
[7] | Tang Xiaoping. A STUDY ON APPLICATION OF STRENGTHENING OF FRAME BEAM WITH CARBON FIBER REINFORCED POLYMER AFTER FIRE[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(12): 113-117. doi: 10.13204/j.gyjz201012029 |
[8] | Wu Mai, Zhao Xin, Wang Enyuan, Li Yanfeng, Guo Chengbo, Yang Bin. STUDY ON BEARING BEHAVIORS AND CONSTRUCTION PROCEDURE OF COLUMNAR-HAMMER RAMMED CONCRETE PILE[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(8): 114-117. doi: 10.13204/j.gyjz201008026 |
[9] | Dong Jinrong. INFLUENCE OF PILE BOTTOM SLIME ON SKIN FRICTION AND BEARING CAPACITY ESTIMATION TO PILE[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(4): 93-97. doi: 10.13204/j.gyjz200904021 |
[10] | Shen Baohan, Lan Lan, Wang Yan, Liu Zhenliang, He Dexin. TEST STUDY OF DX PILESWITH DOUBLE BULBS AT HENAN HMQ ELECTRIC POWER PLANT[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(2): 38-44,63. doi: 10.13204/j.gyjz200902005 |
[11] | Shen Baohan, Wang Haiyan, Sun Junping, He Dexin, Li Yanli, Liu Ying, Zeng Yajie. TEST STUDY OF DX PILES WITH SINGLE AND DOUBLE BULBS AT TANG SHAN HTW ELECTRIC PLANT[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(2): 16-25,122. doi: 10.13204/j.gyjz200902003 |
[12] | Gong Xisheng, Liu Jingliang, Zhou Jianfeng, Si Siyu. APPLICATION OF RETARD-BONDED PRESTRESSED TECHNIQUE IN PROJECT OF LIHONG ECOLOGY HOMELAND[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 28-30. doi: 10.13204/j.gyjz200811008 |
[13] | Liu Rong. EXPERIMENTAL STUDIES ON THE PORE WATER PRESSURE OF MUNICIPAL SOLID WASTE[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(12): 69-71. doi: 10.13204/j.gyjz200812018 |
[14] | Zhong Wenle, Chen Pei, Jiang Fengchang, Yang Genhong, Lu Jianwang. STRENGTHENING AND RECONSTRUCTION A CHEMICAL WORKSHOP INTO 2-HLS90 CONCRETE-MIXING BUILDING[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(2): 107-109. doi: 10.13204/j.gyjz200702027 |
[15] | Lian Feng, Gong Xiaonan, Zhang Changsheng. EFFECT ANALYSIS OF SOFT FOUNDATION TREATMENT BY VACUUM PRELOADING[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(10): 58-62. doi: 10.13204/j.gyjz200710016 |
[16] | Mei Fu-liang. INCREMENT-DIMENSIONAL PRECISE INTEGRATION METHOD OF SOLVING CONSOLIDATION EQUATION FOR SATURATION SOIL[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(4): 50-51. doi: 10.13204/j.gyjz200604015 |
[17] | Xie Qun, Lu Zhoudao, Yu Jiangtao. RESEARCH ON PROBLEMS OF REINFORCED CONCRETE STRUCTURES STRENGTHENEDWITH PRESTRESSED FRP[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(7): 93-95. doi: 10.13204/j.gyjz200507027 |
[18] | Lei Jinbo, Li Maolin, Xiang Dongde, Jiang Hongdao. REGULARITY ANALYSIS AND STUDY ON PORE WATER PRESSURE DURING PTC PILE CONSTRUCTION[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(6): 56-60. doi: 10.13204/j.gyjz200506016 |
[19] | Wen Xiaogui, Zhu Jiancai, Gong Xiaonan. EXPERIMENTAL STUDY ON MECHANISM OF REINFORCING SOFT FOUNDATION OF BRIDGE HEAD BY VACUUM COMBINED WITH SURCHARGE PRELOADING[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(5): 40-43. doi: 10.13204/j.gyjz200405013 |