Citation: | Song Jinhu, Miao Linchang, Xu Zheng, Wang Jun. IMPACT ANALYSIS OF TWIN-TUNNELS SPACE ON INTERNAL FORCES IN LINING[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(1): 110-116,84. doi: 10.13204/j.gyjz201201021 |
Yamaguchi I,Yamazaki I,Kiritani Y. Study on Ground-Tunnel Interactions of Four Shield Tunnels Driven in Close Proximity,in Relation to Design and Construction of Parallel Shield Tunnels[J].Tunnelling and Underground Space Technology,1998,(03):289-304.
|
陈卫军,朱忠隆. 近距离交叠隧道研究现状及评析[J].现代隧道技术,2002,(01):42-47.
|
Lo K W,Chong L K,Leung L F. Field Instrumentation of a Multiple Tunnels Interaction Problem[J].Tunnels and Tunnelling,1998.4-16.
|
白廷辉,尤旭东,李文勇. 盾构超近距离穿越地铁运营隧道的保护技术[J].地下空间,2000.2-6.
|
王伟,夏才初,朱合华. 双线盾构越江隧道合理间距优化与分析[J].岩石力学与工程学报,2006,(25):3311-3316.
|
GB50299--1999地下铁道工程施工及验收规范[S].
|
日本土木工程师学会. 日本盾构隧道标准规范[S].
|
Osman A S. Stability of Unlined Twin Tunnels in Undrained Clay[J].Tunnelling and Underground Space Technology,2010,(25):290-296.
|
Chehade F H,Shahrour I. Numerical Analysis of the Interaction Between Twin-Tunnels:Influence of the Relative Position and Construction Procedure[J].Tunnelling and Underground Space Technology,2008,(23):210-214.
|
Chu Bin-Lin,Hsu Sung-Chi,Chang Yi-Long. Mechanical Behavior of a Twin-Tunnel in Muhi-Layered Formations[J].Tunnelling and Underground Space Technology,2007,(22):351-362.
|
晏莉,阳军生,张学民. 水平互层岩体并行隧道中间岩柱稳定分析[J].岩石力学与工程学报,2009,(28):2898-2904.
|
张云,殷宗泽,徐永福. 盾构法隧道引起的地表变形分析[J].岩石力学与工程学报,2002,(03):388-392.
|
Kima H J,Eisenstein Z. Prediction of Tunnel Lining Loads Using Correction Factors[J].Engineering Geology,2006,(85):302-312.
|
朱伟,黄正荣,梁精华. 盾构衬砌管片的壳一弹簧设计模型研究[J].岩土工程学报,2006,(08):940-947.
|
熊刚,杨立坡. 基于ANSYS二次开发的实体单元模型内力图的实现[J].交通与计算机,2007,(04):106-110.
|
钟小春. 盾构隧道管片土压力的研究[D].南京:河海大学,2005.
|
Lee C J,Wu B R,Chen H T. Tunnel Stability and Arching Effects During Tunneling in Soft Clayey Soil[J].Tunnelling and Underground Space Technology,2006,(21):119-132.
|
Song Jinhu,Miao Linchang,Li Chunlin. Construction Effect Analysis of Near Tunnel Based on the Ground-Equivalent Circle Zone-Lining Model[A].2011.2059-2062.
|