Citation: | Peng Tian, Liu Zhenhua, Liu Xiangyu. SIMULATION OF CONSTRUCTION PROCESS OF LARGE BEAM STRING STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(5): 108-111,125. doi: 10.13204/j.gyjz201105024 |
《建筑施工手册》(第四版)编写组.建筑施工手册[M].4版.北京:中国建筑工业出版社,2003.
|
[2] GB 5020522001钢结构工程施工质量验收规范[S].
|
[3] 何春涛,何应勇,张建.宁夏大学活动中心钢管桁架屋盖卸载施工技术[J].钢结构,2007,22(8):81-84.
|
[4] 李志鹏.常州市体育场游泳馆钢结构屋盖吊装施工[J].施工技术,2009(3):55-57.
|
[5] 郑惠平.大跨度曲线连续桁架屋盖的施工[J].工业建筑,2000,30(3):45-47.
|
[1] | QIN Weihong, WANG Shuliang, HUI Zhuo, JIE Peng, LI Yunjie. TENSIONING INFLUENCE COEFFICIENT OF CABLE DOME STRUCTURES[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(10): 1-8. doi: 10.13204/j.gyjzG21042502 |
[2] | ZOU Kongqing, LIU Guo, WU Yibing, DING Shihong, SONG Zhifeng. MECHANICAL ANALYSIS OF THE INTEGRAL LIFTING PROCESS FOR A LONG-SPAN AND COMPLEX ASSEMBLED STEEL ROOF[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(5): 124-130,138. doi: 10.13204/j.gyjzG201906170007 |
[3] | WEN Changjuan, PENG Dekun, ZHU Fadong, LI Kun, CHENG Jun, SHU Bo, XU Yong, TANG Hongyuan, WANG Xudong. INSTALLATION TECHNIQUE OF SUPER LARGE FREE-FORM SURFACE ROOF SYSTEM[J]. INDUSTRIAL CONSTRUCTION, 2020, 50(5): 186-192. doi: 10.13204/j.gyjz202005030 |
[4] | XUE Suduo, LU Jian, LI Xiongyan, LIU Renjie. RESEARCH ON THE SCHEME OF CABLE-SUPPORTED MEMBRANE ROOF OF CABLE-SUPPORTED STRUCTURE WITHOUT INNER HOOP[J]. INDUSTRIAL CONSTRUCTION, 2020, 50(4): 97-102,92. doi: 10.13204/j.gyjz202004018 |
[6] | Zhou Xiaoguo, Zhang Fuxing, Zhu Jiafeng, Peng Xiaolong. SENSITIVITY ANALYSIS OF PARAMETERS OF CABLES FOR STEEL MEGA FRAME AND CABLE-BRACED STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(12): 132-136. doi: 10.13204/j.gyjz2001412022 |
[7] | Wang Xin. THE STEEL STRUCTURES ERECTION FOR BEIJING INSTITUTE OF TECHNOLOGY GYMNASIUM[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(08): 140-143. |
[8] | Gu Sheng, Tang Baijian. ESTIMATION OF INITIAL TENSION OF CABLES IN MULTI-STOREY PRESTRESS-MEGA-BRACED STEEL FRAME STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(1): 120-123. doi: 10.13204/j.gyjz201101027 |
[9] | Li Hongxing, Bai Guoliang, Lei Yisheng, Yue Jianguang. ANALYSIS ON A COLLAPSE ACCIDENTS OF ARCHED CORRUGATED STEEL ROOF[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(10): 112-114. doi: 10.13204/j.gyjz200710030 |
[10] | Wang Yuan-qing, Tan Cheng-dong, Zhang Yong. ANALYSIS ON SEISMIC RESPONSE OF ARCHED CORRUGATED METAL ROOF[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(8): 78-81. doi: 10.13204/j.gyjz200608024 |
[11] | Wang Yuanqing, Tan Chengdong, Zhang Yong. DESIGN AND ANALYSIS OF FOUNDATION OF ARCHED CORRUGATED METAL ROOF[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(2): 82-84. doi: 10.13204/j.gyjz200602024 |
[12] | Tong Liping, Ren Junchao, Tang Bifeng. STUDY OF THE SUSPENDED CABLE-ARCH STEEL ROOF SYSTEM OF ZHENGZHOU INTERNATIONAL CONVENTION AND EXHIBITION CENTER[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(3): 65-67. doi: 10.13204/j.gyjz200403020 |
[13] | Guo Yanlin, Deng Ke, Wang Hong, Bao Guangjian, Xu Chongliang. THE INTEGRAL HOISTING TECHNOLOGY OF CHINA SOUTHERN AIRLINES GUANGZHOU AIRCRAFT HANGAR[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(12): 6-11. doi: 10.13204/j.gyjz200412002 |
[14] | Lou Junjie, Guo Yanlin, Miao Youwu, Lin Bing, Xu Yanlin, Cui Wei. THE INSTALLATION SCHEME AND ANALYSIS OF SECONDARY TRUSSES OF STEEL ROOF IN MACAO GYM[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(12): 12-14,35. doi: 10.13204/j.gyjz200412003 |
[15] | Ding Peimin, Xiao Zhibin, Qiu Tao. DESIGN METHODS OF ANCHORS PLATES AS TENSION FOUNDATIONS OF TENSILE CABLE-MEMBRANE STRUCTURES[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(4): 49-52. doi: 10.13204/j.gyjz200404015 |
[16] | Wu Jie, Zhang Qilin, Luo Xiaoqun. A SEQUENTIAL TWO-LEVELS ALGORITHM FOR THE OPTIMIZATION DESIGN OF PRESTRESS OF TENSIONED INTEGRAL STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(4): 82-83,91. doi: 10.13204/j.gyjz200404024 |