[1] | CHEN Weiying, LI Yixiang, CAO Di, BI Xin. Research on Indoor Daylighting Optimization Strategy for Renovated Old Industrial Buildings with Large Spans[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(10): 139-145. doi: 10.13204/j.gyjzG22042907 |
[2] | LU Jingfu, SUN Zhanqi, QIU Yong, LI Zhongwen, ZHOU Zhenwei, HUANG Chaojun. EXPERIMENTAL RESEARCH ON MECHANICS OF LONG-SPAN AND HEAVY-LOAD PRESTRESSED CONCRETE DOUBLE-TEES[J]. INDUSTRIAL CONSTRUCTION, 2020, 50(9): 62-67. doi: 10.13204/j.gyjzG19111005 |
[3] | Bian Shaoshuai, Yao Huansong, Tan Yuehu, Li Erbing, Yang Meng, Zhou Jun. RESEARCH ON FULL FRAMING CONSTRUCTION OF LARGE-SPAN DEEP EXCAVATIONS[J]. INDUSTRIAL CONSTRUCTION, 2015, 45(8): 129-134. doi: 10.13204/j.gyjz201508024 |
[4] | Lin Yongjun, Song Changjiang, Luo Nan, Li Mingshui, Gao Xiujian. STUDY ON WIND TUNNEL TEST OF LARGE-SPAN SINGLE-LAYER RETICULATED SHELL STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(7): 130-134. doi: 10.13204/j.gyjz201307029 |
[5] | Chen Hongqiu, Zhou Guixiang, Zhou Yin, Liang Jun. AERO-INTERFERENCE OF SURROUNDING HIGH RISE BUILDINGS ON LARGE-SPAN CURVED ROOF[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(6): 55-59. doi: 10.13204/j.gyjz201206013 |
[6] | Liu Pengfei, Zhao Qilin, Jiang Kebin, Gao Hesheng. THEORETIC RESEARCH ON FRICTION LOSS OF PRE-STRESS IN LARGE-SPAN CONCRETE BRIDGE[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(10): 64-67. doi: 10.13204/j.gyjz201110016 |
[7] | Sheng Xingwang, Liu Haitao. RESEARCH ON THE KEY TECHNOLOGIES OF JINGHANG GRAND CANAL CONTINUOUS BEAM’S CONSTRUCTION MONITORING ON SHANGHAI-NANJING INTERCITY RAILWAY[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(10): 26-30,40. doi: 10.13204/j.gyjz201010007 |
[8] | Li Yongkui, Jiang Xinshan, Chen Huanjun. INSTALLATION PLANNING AND TECHNOLOGY OF QUINCUNCIAL LONG-SPAN STEEL CONSTRUCTION[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(8): 118-122. doi: 10.13204/j.gyjz201008027 |
[9] | Shang Renjie, Wu Zhuanqin, Yu Yuanpeng, Yue Yanbo, Gong Xisheng. APPLICATION OF RETARD-BONDED PRESTRESSED TECHNIQUE IN CONCRETE GRID-BEAM STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 36-39. doi: 10.13204/j.gyjz200811010 |
[10] | Mao Wenjun, Liu Xiliang. STUDY ON LOAD-BEARING BEHAVIOR OF LARGE-SPAN TYPICAL CABLE TRUSS SUPPORTING STRUCTURAL SYSTEM[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(2): 96-98. doi: 10.13204/j.gyjz200802025 |
[11] | Xiang Kai, Lu Zhoudao, Yu Jiangtao, Zhang Kechun. RESEARCH ON STRENGTHENING TECHNOLOGY OF LONG-SPAN RETICULATED SHELLS[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(1): 110-113. doi: 10.13204/j.gyjz200801028 |
[12] | Dong Jin, Zhan Zhen, Li Shulin. APPLICATION OF EXTRA -LONG OVERHANGING SCAFFOLD IN OFFICE BUILDING PROJECT[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(10): 115-117. doi: 10.13204/j.gyjz200710031 |
[13] | Tang Han, Shen Minxia, Xu Yan. DESIGN OF LONG-SPAN PRESTRESSED HOLLOW PLATE OF SHOOTING GYM FOR BEIJING OLYMPIC GAMES[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(1): 23-25,19. doi: 10.13204/j.gyjz200701007 |
[14] | Yu Dong, Qu Linhai, Guan Chuanfu. CONSTRUCTION TECHNOLOGY OF LARGE-SPAN STEEL STRUCTURE FOR A GYMNASIUM[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(3): 84-86. doi: 10.13204/j.gyjz200503028 |
[15] | Guo Yanlin, Cui Xiaoqiang. KEY TECHNICAL PROBLEMS AND DISCUSSION IN CONSTRUCTION PROCESS OF LARGE SPAN STEEL STRUCTURES[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(12): 1-5,22. doi: 10.13204/j.gyjz200412001 |
[16] | Guo Yanlin, Deng Ke, Wang Hong, Bao Guangjian, Xu Chongliang. THE INTEGRAL HOISTING TECHNOLOGY OF CHINA SOUTHERN AIRLINES GUANGZHOU AIRCRAFT HANGAR[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(12): 6-11. doi: 10.13204/j.gyjz200412002 |