Citation: | Gu Sheng, Tang Baijian. ESTIMATION OF INITIAL TENSION OF CABLES IN MULTI-STOREY PRESTRESS-MEGA-BRACED STEEL FRAME STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(1): 120-123. doi: 10.13204/j.gyjz201101027 |
[2] 彭观寿, 高轩能, 陈明华.支撑布置对钢框架结构抗侧刚度的影响[J].工业建筑, 2008, 38(5):83-88.
|
黄怡, 王元清, 石永久.支撑布置形式对多高层钢结构抗震性能的影响分析[J].钢结构, 2005, 20(5):41-45.
|
[3] Hou Xingguo, Hiroshi T.Displacement-Restraint Bracing forSeismic Retrofit of Steel Moment Frames [J].Journal ofConstructional Steel Research, 2008(12):1-9.
|
[4] Mofid M, Lotfollahi M.On the Characteristics of New Ductile KneeBracing Systems [J].Journal of Constructional Steel Research, 2006, 62:271-281.
|
[5] Aydin E, Boduroglu M H.Optimal Placement of Steel DiagonalBraces for Upgrading the Seismic Capacity of Existing Structuresand Its Comparison with Optimal Dampers [J].Journal ofConstructional Steel Research, 2008, 64:72-86.
|
[6] Di Sarno L, Elnashai A S.Bracing Systems for Seismic Retrofittingof Steel Frames [J].Journal of Constructional Steel Research, 2009, 65:452-465.
|
[7] 颜潇潇, 童根树, 景亭, 等.跨层巨型斜支撑体系的节点分析与设计[J].工业建筑, 2008, 38(10):108-111.
|
[8] Yoo Jung-Han, Roeder C W, Lehman D E.Simulated Behavior ofMulti-Storey X-Braced Frames[J].Engineering Structures, 2009, 31:182-197.
|
[9] Hosseini Hashemi B, Hassanzadeh M.Study of a Semi-Rigid SteelBraced Building Damaged in the Bam Earthquake[J].Journal ofConstructional Steel Research, 2008, 64:704-721.
|
[10] 陆赐麟, 王冬梅.预应力技术首次在我国超高层钢结构中的成功应用[J].工业建筑, 2006(增刊):188-191.
|
[11] 唐柏鉴, 蒋志勇.一种预应力巨型支撑-框架结构:中国, 200920233698.6[P].2010-06-02.
|
[12] 唐柏鉴, 董军.首部《预应力钢结构技术规程》的几点探讨[J].江苏科技大学学报:自然科学版, 2009, 23(3):202-205.
|