Zhu Xiaojun, Wu Jianfeng, Wu Chuanchuan, Liang Shuting, Pang Rui, Hao Juan. RESEARCH ON OBLIQUE MATH-BEAMS IN A NEW-TYPE FULL PRECAST CONCRETE FRAME STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(1): 64-67. doi: 10.13204/j.gyjz201101016
Citation:
Zhu Xiaojun, Wu Jianfeng, Wu Chuanchuan, Liang Shuting, Pang Rui, Hao Juan. RESEARCH ON OBLIQUE MATH-BEAMS IN A NEW-TYPE FULL PRECAST CONCRETE FRAME STRUCTURE[J]. INDUSTRIAL CONSTRUCTION , 2011, 41(1): 64-67. doi: 10.13204/j.gyjz201101016
Zhu Xiaojun, Wu Jianfeng, Wu Chuanchuan, Liang Shuting, Pang Rui, Hao Juan. RESEARCH ON OBLIQUE MATH-BEAMS IN A NEW-TYPE FULL PRECAST CONCRETE FRAME STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(1): 64-67. doi: 10.13204/j.gyjz201101016
Citation:
Zhu Xiaojun, Wu Jianfeng, Wu Chuanchuan, Liang Shuting, Pang Rui, Hao Juan. RESEARCH ON OBLIQUE MATH-BEAMS IN A NEW-TYPE FULL PRECAST CONCRETE FRAME STRUCTURE[J]. INDUSTRIAL CONSTRUCTION , 2011, 41(1): 64-67. doi: 10.13204/j.gyjz201101016
RESEARCH ON OBLIQUE MATH-BEAMS IN A NEW-TYPE FULL PRECAST CONCRETE FRAME STRUCTURE
1.
1. Architectural Design and Research Institute,Southeast University,Nanjing 210096,China;
2.
2. School of Civil Engineering,Southeast University,Nanjing 210096,China;
3.
3. School of Civil Engineering,Huaqiao University,Quanzhou 362021,China
Received Date: 2010-07-05
Publish Date:
2011-01-20
Abstract
The oblique match-beams are the vital supporting members in a new-type full precast concrete frame structure.In order to obtain the ultimate bearing capacity of oblique match-beams with rigid scarf joint,various failure modes were analyzed with shear-friction theory and strut-and-tie model method,and corresponding design formulas for the ultimate strength were deduced.At last,through the existing experimental data,theoretical calculations on the bearing capacity of the oblique match-beams were verified.The results show that the ultimate bearing capacity formula with high accuracy.
References
ACI Committee 318.Building Code Requirements for StructuralConcrete(ACI 318-05)and Commentary (ACI 318R -05)[S].
[2] Prestressed Concrete Institute.Design Handbook PrecastPrestressed Concrete[M].Chicago:PCI, 2004.
[3] 卢志红, 王全凤, 郭子雄.配箍筋缺口梁的抗剪承载力[J].华侨大学学报:自然科学版, 1994, 15(3):289-292.
[4] 冯健, 吕志涛, 于长海.预应力及钢筋混凝土企口接头受剪性能试验研究[J].东南大学学报:自然科学版, 2000, 30(4):27-32.
[5] JTJ 3002000港口及航道护岸工程设计与施工规范[S].
[6] 黄祥海, 梁书亭, 朱筱俊.预制装配式框架干式企口连接中缺口梁的受力性能分析[J].工业建筑, 2007, 37(10):46-49.
[7] 丁大钧.现代混凝土结构学[M].北京:中国建筑工业出版社, 2000:286-292.
[8] 刘朝山, 方从启.混凝土结构设计的拉-压杆模型方法II:设计[J].混凝土, 2009, 11(3):7-13.
[9] 王田友, 苏小卒, 方江生.拉压杆模型方法在钢筋混凝土框架节点计算中的应用研究[J].土木工程学报, 2007, 40(11):36-40.
[10] 尼儿逊A H.混凝土结构设计[M].过镇海, 方鄂华, 等译.北京:中国建筑工业出版社, 2003:131-131.
[11] GB 500102002混凝土结构设计规范[S].
Relative Articles
[1] HU Jianlin, XUE Jinhao, GUO Jiangfeng, MENG Zhipeng, LIU Yang, ZHENG Ruihai. Experimental Study on Influential Factors for Shear Properties of Interfaces Between Anchor Bolts and Soil Under Different Confining Pressures [J]. INDUSTRIAL CONSTRUCTION, 2024, 54(3): 200-205. doi: 10.3724/j.gyjzG22090804
[2] SUI Weining, MA Yong, YANG Haitao, WU Jinguo. Experimental Study on Mechanical Properties of a New Connection Joint Between PC External Wall Panel and Steel Frame with Frictional Energy Dissipation [J]. INDUSTRIAL CONSTRUCTION, 2023, 53(5): 109-117. doi: 10.13204/j.gyjzG22011501
[3] ZHANG Chenrong, YAN Jingliang, LIU Xiaogang. Research on Tensile and Shear Performance of Fully-Prefabricated Slabs with UHPC Split-Joints [J]. INDUSTRIAL CONSTRUCTION, 2023, 53(9): 119-127. doi: 10.13204/j.gyjzG23022811
[4] QIN Yongjun, LI Xiangyang, CUI Zhuang, WANG Bo. RESEARCH ON SHEAR PERFORMANCES OF CONCRETE DEEP BEAMS MIXED WITH DESERT SAND WITHOUT WEB REINFORCEMENT [J]. INDUSTRIAL CONSTRUCTION, 2021, 51(9): 98-105. doi: 10.13204/j.gyjzG20081505
[6] Li Xufeng Wang Xinwu Li Congling, . ASEISMIC EXPERIMENTAL STUDY ON MID-FRAME JOINTS OF SEMI-RIGID BEAM-COLUMN CONNECTION [J]. INDUSTRIAL CONSTRUCTION, 2015, 45(10): 150-154. doi: 10.13204/j.gyjz201510028
[7] Huang Xianbin Wang Zhaoling Wang Xiji Li Weian, . STUDY OF XUANKOU CONTINUOUS BOX GIRDER BRIDGE'S CONSTRUCTION TECHNOLOGY [J]. INDUSTRIAL CONSTRUCTION, 2015, 45(7): 126-131. doi: 10.13204/j.gyjz201507026
[8] Ji Bohai, Tian Yuan, Fu Zhongqiu, Xu Hanjiang. ANALYSIS OF FATIGUE STRESS AMPLITUDE OF DIAPHRAGM NOTCH IN ORTHOTROPIC STEEL BRIDGE DECK [J]. INDUSTRIAL CONSTRUCTION, 2014, 44(05): 128-131.
[9] Zhong Xiaoping, Jin Weiliang. FRAMEWORK OF DESIGN THEORY OF WHOLE LIFE-CYCLE PERFORMANCE IN CONCRETE STRUCTURE [J]. INDUSTRIAL CONSTRUCTION, 2013, 43(8): 1-9. doi: 10.13204/j.gyjz201308001
[10] Liang Shuting, Pang Rui, Zhu Xiaojun, Meng Yao. EFFECT OF DETAILED FORMATIONS ON THE MECHANICAL PROPERTY OF HAIRPIN CONNECTORS IN PRECAST RC FLOOR SLABS [J]. INDUSTRIAL CONSTRUCTION, 2011, 41(10): 59-63. doi: 10.13204/j.gyjz201110015
[11] Wang Mei, Liang Shuting, Li Keming, Zhu Xiaojun, Pang Rui. FORCED PERFORMANCES STUDY ON TOTAL-PRECAST CONCRETE FRAME COLUMN WITH ALVEOUS-CONNECTION [J]. INDUSTRIAL CONSTRUCTION, 2010, 40(2): 69-73. doi: 10.13204/j.gyjz201002016
[12] Zhou Nannan, Wang Lai, Wang Guobing, Yang Ning. NONLINEAR FINITE ELEMENT ANALYSIS OF SEISMIC BEHAVIOR OF SEMI-RIGID CONNECTION STEEL FRAME [J]. INDUSTRIAL CONSTRUCTION, 2009, 39(3): 112-115,85. doi: 10.13204/j.gyjz200903029
[13] Zhao Jianli, Shen Shuilong. MODIFICATION OF FIP STRUT-AND-TIE MODEL FOR DESIGN OF INTERIOR ANCHORAGE ZONES OF POST-TENSIONED CONCRETE STRUCTURES [J]. INDUSTRIAL CONSTRUCTION, 2009, 39(12): 57-60. doi: 10.13204/j.gyjz200912015
[14] Wang Xintang, Ji Yao, Wang Jianping. COMPUTATION OF BUCKLING LOAD OF STEEL FRAMES WITH SEMI-RIGID CONNECTIONS [J]. INDUSTRIAL CONSTRUCTION, 2008, 38(4): 82-86. doi: 10.13204/j.gyjz200804021
[15] Huang Xianghai, Liang Shuting, Zhu Xiaojun. RESEARCH ON HIDDEN CORBEL OF DRY JOINTS OF PRECAST CONCRETE FRAME STRUCTURE [J]. INDUSTRIAL CONSTRUCTION, 2008, 38(2): 35-38,48. doi: 10.13204/j.gyjz200802012
[16] Zhou An, . EXPERIMENT ON ULTIMATE BEARING CAPACITY AND SHEAR RIGIDITY OF STUD CONNECTORS [J]. INDUSTRIAL CONSTRUCTION, 2007, 37(10): 84-87. doi: 10.13204/j.gyjz200710023
[17] Huang Xianghai, Liang Shuting, Zhu Xiaojun. RESEARCH ON DAPPED -END BEAMS OF DRY DAPPED -END CONNECTIONS IN PRECAST CONCRETE FRAME STRUCTURE [J]. INDUSTRIAL CONSTRUCTION, 2007, 37(10): 46-49. doi: 10.13204/j.gyjz200710013
Proportional views