[1] | HUA Qinchun, WANG Xiuli, WANG Kang, WANG Jinzhou, LI Yanyan, LI Chunlong. Progressive Collapse Analysis and Construction Process Monitoring for Long-Span Retractable Structures[J]. INDUSTRIAL CONSTRUCTION, 2024, 54(4): 90-98. doi: 10.3724/j.gyjzG23102005 |
[2] | WANG Jinrong, WANG Xiuli, GOU Baolong, WANG Yanxin. Analysis and Field Monitoring of the Influence of Temperature on the Lifting Process of Complex Long-Span Gymnasium Steel Structures[J]. INDUSTRIAL CONSTRUCTION, 2023, 53(8): 96-101,57. doi: 10.13204/j.gyjzG22102505 |
[3] | JIA Feng, DU Yongqiang, YANG Wenbo, NIE Jincheng, KOU Hao, XIAO Longge. Research on Deformation Laws of Deeply Buried Tunnels with Small Clearance in Soft Rock by Different Tunnelling Methods[J]. INDUSTRIAL CONSTRUCTION, 2023, 53(11): 21-28. doi: 10.13204/j.gyjzG22091803 |
[4] | ZHAO Ping, XU Feng, WANG Huadong, WANG Gang, WU Fabo, HAN Yukun, ZHENG Chengcheng, LIU Tingfang. Influence of Tunnel Lining Thickness on Structural Safety and Evolution Laws of Crack[J]. INDUSTRIAL CONSTRUCTION, 2023, 53(11): 11-20. doi: 10.13204/j.gyjzG22090204 |
[5] | ZHANG Mingliang, XIN Yabing, HU Tao, CHEN Hao. Intelligent Monitoring and Analysis of Incremental Launching Construction of Precast Frame Bridge[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(10): 106-110. doi: 10.13204/j.gyjzG20110607 |
[6] | CENG Fankui, LIU Xinzhao, PAN Zhuang, XING Guohua, ZHANG Jianhua, LU Xiaolan. CONSTRUCTION SIMULATIONS AND MONITORING OF A FORMWORK FOR SUPER HIGH-RISE BUILDINGS[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(11): 127-131,136. doi: 10.13204/j.gyjzG210102701 |
[7] | LI Qiang, ZHOU Ting, CHEN Zhihua, LIU Haonan. INFLUENCE OF NON-LOAD ACTION ON SUPER HIGH RISE BUILDINGS CONCRETE-FILLED SQUARE STEEL TUBE STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2020, 50(12): 150-159. doi: 10.13204/j.gyjzG19120105 |
[8] | ZHOU Yuqi, YAN Peiyu. RESEARCH ON LONG-TERM EFFECT OF LARGE-DIAMETER ROCK-SOCKETED PILES AND FIELD MEASUREMENTS[J]. INDUSTRIAL CONSTRUCTION, 2020, 50(9): 106-111. doi: 10.13204/j.gyjzG20040106 |
[9] | Chen Zhihua, Niu Ben, Zhang Zhisheng. ANALYSIS OF STRESS MONITORING RESULTS OF KEY JOINTS IN STEEL STRUCTURE OF TIANJIN LIBRARY[J]. INDUSTRIAL CONSTRUCTION, 2015, 45(2): 154-158. doi: 10.13204/j.gyjz201502031 |
[10] | Zhou Kui, Zhou Kun, Ning Nana, Yu Jinxin. THE SAFETY IMPACT MONITORING ANALYSIS OF HIGHWAY TUNNEL BLASTING EXCAVATION CLOSE TO EXISTING CIVIL DEFENSE ENGINEERING[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(08): 144-150. |
[11] | Huang Junjie, Su Qian, Zhou Heng, Zheng Jianbin. REINFORCEMENT DESIGN OF THE DISEASE PILE FOUNDATION OF EXISTING BRIDGE IN KARST AREA AND NUMERICAL ANALYSIS[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(7): 166-170. doi: 10.13204/j.gyjz201207029 |
[12] | Wang Zeqiang, Chen Xinli, You Deqing, Xu Ruilong, Xu Wenlei. THE CONSTRUCTION TECHNOLOGY OF PRESTRESSED STEEL STRUCTURE FOR SIYANG STADIUM[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(8): 97-101,88. doi: 10.13204/j.gyjz201208021 |
[13] | Zhang Xuewei, Li Xinkui, Xia Fei, Li Kuikui. SIMULATION ANALYSIS AND CONSTRUCTION MONITORING OF A LARGE SPAN STEEL GRID STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(12): 72-75. doi: 10.13204/j.gyjz201212016 |
[14] | Shao Jianwen, Gan Gang, He Yong, Mao Jianghong, Cui Heliang. CONSTRUCTION MONITORING AND PERFORMANCE ANALYSIS OF AN UNDERPINNING BRICK-CONCRETE STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(12): 141-145,105. doi: 10.13204/j.gyjz201112031 |
[15] | Ma Jian. DESIGN OF SUPPORTING SCHEME AND CONSTRUCTION MONITORING FOR SUPER LARGE DEEP EXCAVATIONS[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(9): 97-100. doi: 10.13204/j.gyjz201009025 |
[16] | Xu Ruilong, You Deqing, Qin Jie, Jiang Zhenyan. THE CONSTRUCTION TECHNOLOGY OF THE BEAM STRING STRUCTURE FOR XIAMEN INTERNATIONAL CONFERENCE & EXHIBITION CENTER[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(12): 15-17. doi: 10.13204/j.gyjz200812005 |
[17] | Wang Zeqiang, Qin Jie, Li Guoli, Chen Xinli, Tekky I. Budisetia. THE CONSTRUCTION TECHNOLOGY OF PRESTRESSED STEEL STRUCTURE IN THE MAIN STADIUM FOR INDONESIAN COUNTRYWIDE GAME[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(12): 8-11. doi: 10.13204/j.gyjz200812003 |
[18] | Chen Dachuan, Hu Haibo. REINFORCEMENT AND CONSTRUCTION MONITORING OF A STRUCTURE AFTER FIRE[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(12): 106-109. doi: 10.13204/j.gyjz200812028 |
[19] | Xu Ruilong, Qin Jie, Li Guoli, Qin Yang, Zhang Wei. THE BEAM STRING STRUCTURE CONSTRUCTION TECHNOLOGY OF THE OLYMPIC TRAINING STADIUM FOR THE NATIONAL OLYMPIC SPORTS CENTER[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(1): 26-29. doi: 10.13204/j.gyjz200701008 |
[20] | Xiao Wuquan, Leng Wuming, L Wentian. ANALYSIS OF MONITORING RESULTS OF INTERNAL FORCE AND DEFORMATI ON OF SUPPORT SYSTEM FOR A SUBWAY DEEP EXCAVATION[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(9): 5-7. doi: 10.13204/j.gyjz200409002 |