Citation: | Ge Zhaoshen, Hu Changming, Shen Qin, Yin Hongbing. A STUDY ON EFFECT OF STRUCTURAL FACTORS ON STABILITY OF COUPLER STEEL TUBE FALSEWORK[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(2): 36-41. doi: 10.13204/j.gyjz201002009 |
胡长明,葛召深,王静,等.扣件式钢管模板支架剪刀撑研究[J].施工技术,2009,38(6):70-72.
|
[2] Yu W K,Chung K F,Chan S L. Structural Instability of Multi-Storey Door-Type Modular Steel Scafflods[J]. Engineering Structures,2004,26(7):867-881.
|
[3] PengJL,ChanSL,Wu C L. Effects of Geometrical Shape and Incremental Loads on Scaffold Systems[J]. Journal of Constructional Steel Research,Elsevier Science Direct,2007,63:448-459.
|
[4] PengJuiLin. Stability Analyses and DesignRecommendations for Practical Shoring Systems During Construction[J]. Journal of Construction Engineering and Management,ASCE,2002,128(6):536-544.
|
[5] PengJL,PanA D,ChenW F. ApproximateAnalysisMethod for Modular Tubular Falsework[J]. Journal of Structural Engineering,ASCE,2001,127(3):256-263.
|
[6] 施炳华.探讨扣件式钢管脚手架的稳定计算问题[J].施工技术,2004,33(2):21-22.
|
[7] 杜荣军.脚手架结构的稳定承载能力[J].施工技术,2001,30(4):1-5.
|
[8] 敖鸿斐.双排扣件式钢管脚手架整体极限承载力研究[D].上海:同济大学,2000.
|
[9] 徐崇宝,张铁铮,潘景龙,等.双排扣件式钢管脚手架工作性能的理论分析与试验研究[J].哈尔滨建筑工程学院学报,1989,22(2):38-55.
|
[10] 刘建民,曹普田,李慧民.房屋建筑扣件式钢管模板支架立杆间距的确定[J].四川建筑科学研究,2006,32(4):37-40.
|
[11] 胡长明.扣件联接钢结构试验及其理论研究[D].西安:西安建筑科技大学,2008.
|
[12] 胡长明,曾凡奎,沈勤,等.构造因素对高支模稳定承载力的影响[J].华中科技大学学报:城市科学版,2008,25(4):57-60.
|
[13] 闫鑫,胡长明,曾凡奎,等.顶端伸出长度对高大模板支架稳定承载力的影响分析[J].施工技术,2009,38(4):73-75.
|
[14] 曾凡奎,胡长明,闫鑫,等.扣件式钢管模板支架稳定性试验研究[J].工业建筑,2010,40(2):28-31.
|
[15] 胡长明,葛召深,王丽芳,等.扣件式钢管模板支架静压变形特性的试验研究[J].工业建筑,2010,40(2):32-35.
|