Zhang Kaichen, Wang Feng, Si Bo, Li Ming. DESIGN AND CONSTRUCTION OF THE CORBEL BETWEEN THE OLD COLUMN AND THE NEW BEAM FOR A REFORM PROJECT[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(11): 126-128. doi: 10.13204/j.gyjz200911029
Citation:
Zhang Kaichen, Wang Feng, Si Bo, Li Ming. DESIGN AND CONSTRUCTION OF THE CORBEL BETWEEN THE OLD COLUMN AND THE NEW BEAM FOR A REFORM PROJECT[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(11): 126-128. doi: 10.13204/j.gyjz200911029
Zhang Kaichen, Wang Feng, Si Bo, Li Ming. DESIGN AND CONSTRUCTION OF THE CORBEL BETWEEN THE OLD COLUMN AND THE NEW BEAM FOR A REFORM PROJECT[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(11): 126-128. doi: 10.13204/j.gyjz200911029
Citation:
Zhang Kaichen, Wang Feng, Si Bo, Li Ming. DESIGN AND CONSTRUCTION OF THE CORBEL BETWEEN THE OLD COLUMN AND THE NEW BEAM FOR A REFORM PROJECT[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(11): 126-128. doi: 10.13204/j.gyjz200911029
It was explored a new design and construction method of the corbel between the old column and the new beam for a reform project in Beijing.Each ascendancy of the anchoring and pre-stressing technology was applied in this project.The experience of the design and construction can give some advice to the similar project
Zhang Kaichen, Wang Feng, Si Bo, Li Ming. DESIGN AND CONSTRUCTION OF THE CORBEL BETWEEN THE OLD COLUMN AND THE NEW BEAM FOR A REFORM PROJECT[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(11): 126-128. doi: 10.13204/j.gyjz200911029
Zhang Kaichen, Wang Feng, Si Bo, Li Ming. DESIGN AND CONSTRUCTION OF THE CORBEL BETWEEN THE OLD COLUMN AND THE NEW BEAM FOR A REFORM PROJECT[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(11): 126-128. doi: 10.13204/j.gyjz200911029