Source Journal for Chinese Scientific and Technical Papers
Core Journal of RCCSE
Included in JST China
Included in the Hierarchical Directory of High-quality Technical Journals in Architecture Science Field
Volume 39 Issue 11
Dec.  2014
Turn off MathJax
Article Contents
Zhang Huaijing, Li Weixun. ANALYSIS OF INFLUENCE OF SUBWAY STATION TRANSFER CHANNEL EXCAVATION ON EXISTING PILE FOUNDATION[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(11): 81-85. doi: 10.13204/j.gyjz200911019
Citation: Zhang Huaijing, Li Weixun. ANALYSIS OF INFLUENCE OF SUBWAY STATION TRANSFER CHANNEL EXCAVATION ON EXISTING PILE FOUNDATION[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(11): 81-85. doi: 10.13204/j.gyjz200911019

ANALYSIS OF INFLUENCE OF SUBWAY STATION TRANSFER CHANNEL EXCAVATION ON EXISTING PILE FOUNDATION

doi: 10.13204/j.gyjz200911019
  • Received Date: 2008-12-20
  • Publish Date: 2009-11-20
  • Based on the design and construction scheme of transfer channel in International Trade Station of Beijing Subway No.10 Line,finite difference method is used to simulate the stress characteristic of existing piles and the displacement law during the excavation under subway station transfer channel construction,and the reasonable construction scheme is brought out.It is proved from the result that,if there aren't reinforcement measures on bridge piles,surface subsidence and settlement of bridge piles are large,and the bridge bearing capacity will be reduced seriously,therefore,the stability of bridge piles will be impacted seriously.As a result,during the excavation process of transfer channel,reinforcement measures are necessary to make sure the stability of bridge piles.
  • loading
  • 张志强,何川.地铁盾构隧道近接桩基的施工力学行为研究[J].铁道学报,2003,25(1):92-95.
    [2] 林刚,何川.盾构隧道基础上修建三连拱地铁车站结构参数研究[J].铁道学报,2003,25(6):93-98.
    [3] 李强,王明年,李德才.地铁车站暗挖隧道施工对既有桩基的影响[J].岩石力学与工程学报,2006,25(1):184-189.
    [4] 北京城建勘测设计研究有限责任公司.北京地铁10号线工程国贸站地质祥勘报告[R].北京:北京城建勘测设计研究有限公司.2003.
    [5] 关宝树.隧道工程施工要点集[M].北京:人民交通出版社,2003.
    [6] 李强,王明年.浅埋隧道近接施工地表沉降有限元分析[J].四川建筑,2004,24(1):98-101.
    [7] TBJ 10892铁路隧道喷锚构筑法技术规则[S].
    [8] TB 100032004铁路隧道设计规范[S].
    [9] 李围,何川.盾构隧道基础上修建三条平行隧道地铁车站的施工力学行为研究[J].现代隧道技术,2004,41(1):5-9.
    [10] 彭卫平,廖建三.广州地区建筑桩基设计参数分析与选取[J].岩石力学与工程学报,2004,23(6):1032-1036.
    [11] 张素情,侍倩.桩侧负摩阻力的有关研究[J].建筑技术开发,2004,31(4):23-25.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (74) PDF downloads(58) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return