Li Shulin, Wang Xianpei, Zhao Zhongwei, Zha Yuqing. REINFORCEMENT DESIGN AND NEW CONSTRUCTION TECHNOLOGY RESEARCH OF INCREASED LANDSCAPE LOAD OF THE PEOPLE'S AIR DEFENSE BASEMENT STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 109-111. doi: 10.13204/j.gyjz200811027
Citation:
Li Shulin, Wang Xianpei, Zhao Zhongwei, Zha Yuqing. REINFORCEMENT DESIGN AND NEW CONSTRUCTION TECHNOLOGY RESEARCH OF INCREASED LANDSCAPE LOAD OF THE PEOPLE'S AIR DEFENSE BASEMENT STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 109-111. doi: 10.13204/j.gyjz200811027
Li Shulin, Wang Xianpei, Zhao Zhongwei, Zha Yuqing. REINFORCEMENT DESIGN AND NEW CONSTRUCTION TECHNOLOGY RESEARCH OF INCREASED LANDSCAPE LOAD OF THE PEOPLE'S AIR DEFENSE BASEMENT STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 109-111. doi: 10.13204/j.gyjz200811027
Citation:
Li Shulin, Wang Xianpei, Zhao Zhongwei, Zha Yuqing. REINFORCEMENT DESIGN AND NEW CONSTRUCTION TECHNOLOGY RESEARCH OF INCREASED LANDSCAPE LOAD OF THE PEOPLE'S AIR DEFENSE BASEMENT STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 109-111. doi: 10.13204/j.gyjz200811027
It is introduced reinforcement method of increasing load effect on the existing structure,and there are no working faces above the structure,the pouring concrete can be done only by compaction method of new construction technology under the beam.This new technology's implementation has opened a new channel for the reinforcement design.