[1] | OU Tong, JIANG Fangxin, LAN Chunguang, BAI Shi, QIU Youwei, LIU Xuebing. Engineering Practice of Fiber Bragg Grating Retard-Bonded Prestressed Intelligent Tendons[J]. INDUSTRIAL CONSTRUCTION, 2023, 53(8): 217-221,167. doi: 10.13204/j.gyjzG22082914 |
[2] | GE Yipeng, XIONG Xueyu. FINITE ELEMENT ANALYSIS OF BENDING TEST FOR PRESTRESSED CONCRETE DOUBLE TEES[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(10): 21-27,52. doi: 10.13204/j.gyjzg21061511 |
[3] | Li Xiaofen Liu Lixin Zhang Huipeng, . EXPERIMENTAL STUDY OF FATIGUE BEHAVIOR OF THE PRESTRESSED CONCRETE BEAMS WITH PRETENSIONED BENT-UP TENDONS[J]. INDUSTRIAL CONSTRUCTION, 2015, 45(7): 95-101. doi: 10.13204/j.gyjz201507020 |
[4] | Zhang Jiwen, Zeng Juncheng, Zhang Zhenxing, Tu Yongming, LüJianpin. EXPERIMENTAL STUDY ON BEHAVIOR OF PRE-STRESSED CONCRETE UNDER FLEXURAL TENSION-COMPRESSION FATIGUE LOADING[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(8): 72-75. doi: 10.13204/j.gyjz200908019 |
[5] | Shang Renjie, Wu Zhuanqin, Li Peixun. ORTHOTROPIC CHARACTERS OF A CAST-IN-SITU CONCRETE HOLLOW PLATE AND THE CALCULATION METHOD OF AN EQUIVALENT ISOTROPIC PLATE[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(2): 72-75,93. doi: 10.13204/j.gyjz200902010 |
[6] | Liu Jingliang, Li Qian, Fan Yunyun, Wu Zhuanqin. STUDY ON PREPARATION TECHNICS AND PRODUCING EQUIPMENT OF RETARD-BONDED PRESTRESSING STRAND[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 17-19,44. doi: 10.13204/j.gyjz200811005 |
[7] | Gong Xisheng, Liu Jingliang, Zhou Jianfeng, Si Siyu. APPLICATION OF RETARD-BONDED PRESTRESSED TECHNIQUE IN PROJECT OF LIHONG ECOLOGY HOMELAND[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 28-30. doi: 10.13204/j.gyjz200811008 |
[8] | Zhou Jianfeng, Shang Renjie, Fan Yunyun, Wu Zhuanqin. STABILITY STUDY ON ADHESIVE MATERIAL OF RETARD-BONDED PRESTRESSING STRAND[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 13-16. doi: 10.13204/j.gyjz200811004 |
[9] | Wu Zhuanqin, Fan Yunyun, Liu Jingliang, Liu Gang. STUDY ON MECHANICAL PROPERTIES OF ADHESIVE MATERIALS FOR RETARD-BONDED PRESTRESSING STRAND[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 9-12,35. doi: 10.13204/j.gyjz200811003 |
[10] | Wu Zhuanqin, Zeng Zhaobo, Shang Renjie, Liu Jingliang. EXPERIMENTAL STUDY ON FRICTION COEFFICIENT OF RETARD-BONDED PRESTRESSING STRAND[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 20-23. doi: 10.13204/j.gyjz200811006 |
[11] | Fan Yunyun, Wu Zhuanqin, Zhou Jianfeng, Gong Xisheng. STUDY ON ADHESIVE MATERIALS FOR RETARD-BONDED PRESTRESSING STRAND[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 6-8,16. doi: 10.13204/j.gyjz200811002 |
[12] | Shang Renjie, Zhang Qiang, Zhou Jianfeng, Zeng Zhaobo. EXPERIMENTAL STUDY ON RETARD-BONDED PRESTRESSED CONCRETE BEAMS IN BENDING[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 24-27. doi: 10.13204/j.gyjz200811007 |
[13] | Shang Renjie, Wu Zhuanqin, Yu Yuanpeng, Yue Yanbo, Gong Xisheng. APPLICATION OF RETARD-BONDED PRESTRESSED TECHNIQUE IN CONCRETE GRID-BEAM STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 36-39. doi: 10.13204/j.gyjz200811010 |
[14] | Li Peixun. RESEARCH ON THE RETARD-BONDED PRESTRESSED TECHNIQUE AND DEVELOPMENT PROSPECTS[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 1-5. doi: 10.13204/j.gyjz200811001 |
[15] | Wang Chunwu, Meng Shaoping. ANALYSIS OF LATERAL RESTRAINTS OF PRESTRESSED CONCRETE FRAME STRUCTURES[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(8): 47-50. doi: 10.13204/j.gyjz200708013 |
[16] | Zhang Peng, Yu Yonghe, Mo Cexian, Li Bing, Wei Yongle. NONLINEAR ANALYSIS OF PRESTRESSED CONCRETE HOLLOW SLABS STRENGTHENED WITH CFRP PLATE[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(11): 106-108. doi: 10.13204/j.gyjz200611026 |
[17] | Zhou Wei, Zheng Wenzhong. REMODELING DESIGN OF SEALING AND OPENING IN FLOORS PRESTRESSED WITH UNBONDED TENDONS[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(4): 10-14. doi: 10.13204/j.gyjz200504003 |
[18] | Wang Wei, Chen Xiaobao. FINITE ELEMENT ANALYSIS OF CAST IN PLACE HOLLOW IRREGULAR FLOOR OF PRESTRESSED CONCRETE[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(2): 47-49,63. doi: 10.13204/j.gyjz200502013 |
[19] | Hou Hetao, Li Guoqiang, Wang Youquan, Qi Lixin, Tang Hongwei. THE APPLICATION OF UNBONDED PRESTRESSED TECHNIQUE TO CYLINDRICAL SHELL WITH BIG DIAMETER AND THE ANALYSIS OF TESTS[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(2): 25-27,78. doi: 10.13204/j.gyjz200402009 |
[20] | Feng Peng, Ye Lieping. ANALYSIS AND EXPERIMENTAL STUDY OF STATICALLY LOADED GFRP HOLLOW SLAB[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(4): 15-18,27. doi: 10.13204/j.gyjz200404004 |