[1] | SHI Xudong, ZHANG Bei, CUI Yidan. Experimental Research on Precompression Deformation Performance of Prestressed Concrete with Different Strength Grades Experiencing Given Ultralow Temperatures[J]. INDUSTRIAL CONSTRUCTION, 2024, 54(4): 180-187. doi: 10.3724/j.gyjzG23071204 |
[2] | LIU Jiaqi, CAO Dafu, WANG Kun, ZHOU Yanling, DONG Zheng. EXPERIMENTAL RESEARCH ON SHEAR CAPACITY OF PRESTRESSED TRUSS-TYPE STEEL-REINFORCED CONCRETE BEAMS[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(10): 14-20. doi: 10.13204/j.gyjzG21051308 |
[3] | XU Kaicheng, YAO Feng, XU Hanqi, CHEN Mengcheng, ZHANG Zhixing. EXPERIMENTAL RESEARCH ON SEISMIC PROPERTIES OF PRESTRESSED CONCRETE BEAMS IN SIMULATED ACID RAIN[J]. INDUSTRIAL CONSTRUCTION, 2020, 50(6): 39-44,21. doi: 10.13204/j.gyjz202006007 |
[4] | Li Xiaofen Liu Lixin Zhang Huipeng, . EXPERIMENTAL STUDY OF FATIGUE BEHAVIOR OF THE PRESTRESSED CONCRETE BEAMS WITH PRETENSIONED BENT-UP TENDONS[J]. INDUSTRIAL CONSTRUCTION, 2015, 45(7): 95-101. doi: 10.13204/j.gyjz201507020 |
[5] | Zhang Yiduo, Xu Lulu, Liu Ronggui, Liu Tao. STUDY ON DAMAGE OF PRE-STRESSED CONCRETE BEAMS IN THE ALTERNATIVE ACTION OF FREEZE-THAWING AND FATIGUE LOAD[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(4): 57-61. doi: 10.13204/j.gyjz201304012 |
[6] | Zhang Jiwen, Zeng Juncheng, Zhang Zhenxing, Tu Yongming, LüJianpin. EXPERIMENTAL STUDY ON BEHAVIOR OF PRE-STRESSED CONCRETE UNDER FLEXURAL TENSION-COMPRESSION FATIGUE LOADING[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(8): 72-75. doi: 10.13204/j.gyjz200908019 |
[7] | Gong Xisheng, Liu Jingliang, Zhou Jianfeng, Si Siyu. APPLICATION OF RETARD-BONDED PRESTRESSED TECHNIQUE IN PROJECT OF LIHONG ECOLOGY HOMELAND[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 28-30. doi: 10.13204/j.gyjz200811008 |
[8] | Ma Jingyou, Li Jun’an, Liu Gang, Shang Renjie. APPLICATION OF RETARD-BONDED PRESTRESSED TECHNIQUE IN BEIJING CHILDREN'S NEW PALACE[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 31-35. doi: 10.13204/j.gyjz200811009 |
[9] | Liu Jingliang, Li Qian, Fan Yunyun, Wu Zhuanqin. STUDY ON PREPARATION TECHNICS AND PRODUCING EQUIPMENT OF RETARD-BONDED PRESTRESSING STRAND[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 17-19,44. doi: 10.13204/j.gyjz200811005 |
[10] | Zhou Jianfeng, Shang Renjie, Fan Yunyun, Wu Zhuanqin. STABILITY STUDY ON ADHESIVE MATERIAL OF RETARD-BONDED PRESTRESSING STRAND[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 13-16. doi: 10.13204/j.gyjz200811004 |
[11] | Wu Zhuanqin, Fan Yunyun, Liu Jingliang, Liu Gang. STUDY ON MECHANICAL PROPERTIES OF ADHESIVE MATERIALS FOR RETARD-BONDED PRESTRESSING STRAND[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 9-12,35. doi: 10.13204/j.gyjz200811003 |
[12] | Shang Renjie, Wu Zhuanqin, Yu Yuanpeng, Yue Yanbo, Gong Xisheng. APPLICATION OF RETARD-BONDED PRESTRESSED TECHNIQUE IN CONCRETE GRID-BEAM STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 36-39. doi: 10.13204/j.gyjz200811010 |
[13] | Fan Yunyun, Wu Zhuanqin, Zhou Jianfeng, Gong Xisheng. STUDY ON ADHESIVE MATERIALS FOR RETARD-BONDED PRESTRESSING STRAND[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 6-8,16. doi: 10.13204/j.gyjz200811002 |
[14] | Wu Zhuanqin, Zeng Zhaobo, Shang Renjie, Liu Jingliang. EXPERIMENTAL STUDY ON FRICTION COEFFICIENT OF RETARD-BONDED PRESTRESSING STRAND[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 20-23. doi: 10.13204/j.gyjz200811006 |
[15] | Li Peixun. RESEARCH ON THE RETARD-BONDED PRESTRESSED TECHNIQUE AND DEVELOPMENT PROSPECTS[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 1-5. doi: 10.13204/j.gyjz200811001 |
[16] | Chai Wenge, Li Wenli. EXPERIMENT ON THE MECHANICAL PROPERTY OF DOUBLE-BALL ANCHORAGE OF PRESTRESSED CONCRETE[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(8): 103-106. doi: 10.13204/j.gyjz200708027 |
[17] | Sun Wei-wei, Meng Shao-ping, Wu Jing. RESEARCH ON SEISMIC CAPACITY OF PRESTRESSED CONCRETE FRAME STRUCTURES WITH LARGE LONGITUDINAL LENGTH[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(5): 23-26. doi: 10.13204/j.gyjz200605007 |
[18] | Tu Yongming, LüZhitao. RESEARCH ON THE EXPERIMENT OF PRESTRESSED CONCRETE STRUCTURES IN CARBONATION ENVIRONMENT AND THE PREDICTION MODEL OF CARBONATION DEPTH[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(1): 47-50. doi: 10.13204/j.gyjz200601015 |
[19] | Zhou Wei, Zheng Wenzhong. REMODELING DESIGN OF SEALING AND OPENING IN FLOORS PRESTRESSED WITH UNBONDED TENDONS[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(4): 10-14. doi: 10.13204/j.gyjz200504003 |
[20] | Hou Hetao, Li Guoqiang, Wang Youquan, Qi Lixin, Tang Hongwei. THE APPLICATION OF UNBONDED PRESTRESSED TECHNIQUE TO CYLINDRICAL SHELL WITH BIG DIAMETER AND THE ANALYSIS OF TESTS[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(2): 25-27,78. doi: 10.13204/j.gyjz200402009 |