[1] | LI Pengfei, FENG Chuxiang, ZHU Chengfeng, XIAO Ziqiang, HE Zhimin, WANG Jianmin. Experimental Research on Fatigue Performance of Prestressed Ceramsite Concrete Composite Beams[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(8): 103-110. doi: 10.13204/j.gyjzG21092202 |
[2] | QU Zhihao, HUANG Feng, Zheng Aichen, GAO Xiaoye. Experimental Study on the Influence of Joint Fillers on the Crack Initiation Strength of Rock Masses[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(8): 175-179. doi: 10.13204/j.gyjzG21062915 |
[3] | WU Shukang, ZHANG Wenxue, JI Jun, LU Xiangtao. EXPERIMENTAL RESEARCH OF LATERAL PRESSURE ON SELF-COMPACTING CONCRETE FORMWORKS CONSIDERING TIME-VARYING PROPERTIES[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(8): 120-125. doi: 10.13204/j.gyjzG21010409 |
[4] | Li Xiaofen, Liu Lixin, Zhang Huipeng. EXPERIMENTAL STUDY ON BOND BEHAVIORS OF PRESTRESSED STRANDS BY PULL-OUT TEST[J]. INDUSTRIAL CONSTRUCTION, 2015, 45(5): 65-69. doi: 10.13204/j.gyjz201505015 |
[5] | Cai Xiaoning, Meng Shaoping, Sun Weiwei. REHABILITATION MECHANISM STUDY OF BEAM-TO-COLUMN CONNECTIONS FOR SELF-CENTERING POST-TENSIONED PRECAST FRAME[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(09): 56-61. |
[6] | Chong Xun, Ye Xianguo, Jiang Qing, Jiang Ye, Huang Xiaokun, Liu Gang. EXPERIMENTAL STUDY ON SEISMIC BEHAVIOR OF PRESTRESSED HIGH-STRENGTH CONCRETE BEAMS[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(11): 22-26,48. doi: 10.13204/j.gyjz201211005 |
[7] | Liu Pengfei, Zhao Qilin, Jiang Kebin, Gao Hesheng. THEORETIC RESEARCH ON FRICTION LOSS OF PRE-STRESS IN LARGE-SPAN CONCRETE BRIDGE[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(10): 64-67. doi: 10.13204/j.gyjz201110016 |
[8] | Pan Yudi. THE EXPERIMENTAL RESEARCH ON THE STIFFNESS OF PRESTRESSED CONCRETE BEAMS UNDER LONG-TERM VARIABLE LOADS[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(5): 50-53. doi: 10.13204/j.gyjz200805011 |
[9] | Ma Jingyou, Li Jun’an, Liu Gang, Shang Renjie. APPLICATION OF RETARD-BONDED PRESTRESSED TECHNIQUE IN BEIJING CHILDREN'S NEW PALACE[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 31-35. doi: 10.13204/j.gyjz200811009 |
[10] | Shang Renjie, Wu Zhuanqin, Yu Yuanpeng, Yue Yanbo, Gong Xisheng. APPLICATION OF RETARD-BONDED PRESTRESSED TECHNIQUE IN CONCRETE GRID-BEAM STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 36-39. doi: 10.13204/j.gyjz200811010 |
[11] | Gong Xisheng, Liu Jingliang, Zhou Jianfeng, Si Siyu. APPLICATION OF RETARD-BONDED PRESTRESSED TECHNIQUE IN PROJECT OF LIHONG ECOLOGY HOMELAND[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 28-30. doi: 10.13204/j.gyjz200811008 |
[12] | Liu Jingliang, Li Qian, Fan Yunyun, Wu Zhuanqin. STUDY ON PREPARATION TECHNICS AND PRODUCING EQUIPMENT OF RETARD-BONDED PRESTRESSING STRAND[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 17-19,44. doi: 10.13204/j.gyjz200811005 |
[13] | Wu Zhuanqin, Fan Yunyun, Liu Jingliang, Liu Gang. STUDY ON MECHANICAL PROPERTIES OF ADHESIVE MATERIALS FOR RETARD-BONDED PRESTRESSING STRAND[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 9-12,35. doi: 10.13204/j.gyjz200811003 |
[14] | Li Peixun. RESEARCH ON THE RETARD-BONDED PRESTRESSED TECHNIQUE AND DEVELOPMENT PROSPECTS[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 1-5. doi: 10.13204/j.gyjz200811001 |
[15] | Shang Renjie, Zhang Qiang, Zhou Jianfeng, Zeng Zhaobo. EXPERIMENTAL STUDY ON RETARD-BONDED PRESTRESSED CONCRETE BEAMS IN BENDING[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 24-27. doi: 10.13204/j.gyjz200811007 |
[16] | Zhou Jianfeng, Shang Renjie, Fan Yunyun, Wu Zhuanqin. STABILITY STUDY ON ADHESIVE MATERIAL OF RETARD-BONDED PRESTRESSING STRAND[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 13-16. doi: 10.13204/j.gyjz200811004 |
[17] | Fan Yunyun, Wu Zhuanqin, Zhou Jianfeng, Gong Xisheng. STUDY ON ADHESIVE MATERIALS FOR RETARD-BONDED PRESTRESSING STRAND[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 6-8,16. doi: 10.13204/j.gyjz200811002 |
[18] | Zhang Ke, Ye Lieping, Yue Qingrui. ANALYSIS OF MAXIMUM TENSIONED PRESTRESS AND INTERFACIAL BOND STRESS OF PRESTRESSED CFRP SHEETS[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(7): 96-99. doi: 10.13204/j.gyjz200707028 |
[19] | Zhang Xin, Liang Ru-ming, Wei He, Ye Lie-ping. EXPERIMENTAL STUDY ON RC COLUMN REINFORCEDWITH UNBONDED HIGH-STRENGTH STRANDS[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(11): 81-84. doi: 10.13204/j.gyjz200711022 |
[20] | Cai Jiangyong. IMPROVING SUGGESTION ON CALCULATION METHOD OF FRICTION LOSS IN PRESTRESSED CONCRETE STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(4): 94-95,75. doi: 10.13204/j.gyjz200404029 |