Liu Jingliang, Li Qian, Fan Yunyun, Wu Zhuanqin. STUDY ON PREPARATION TECHNICS AND PRODUCING EQUIPMENT OF RETARD-BONDED PRESTRESSING STRAND[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 17-19,44. doi: 10.13204/j.gyjz200811005
Citation:
Liu Jingliang, Li Qian, Fan Yunyun, Wu Zhuanqin. STUDY ON PREPARATION TECHNICS AND PRODUCING EQUIPMENT OF RETARD-BONDED PRESTRESSING STRAND[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 17-19,44. doi: 10.13204/j.gyjz200811005
Liu Jingliang, Li Qian, Fan Yunyun, Wu Zhuanqin. STUDY ON PREPARATION TECHNICS AND PRODUCING EQUIPMENT OF RETARD-BONDED PRESTRESSING STRAND[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 17-19,44. doi: 10.13204/j.gyjz200811005
Citation:
Liu Jingliang, Li Qian, Fan Yunyun, Wu Zhuanqin. STUDY ON PREPARATION TECHNICS AND PRODUCING EQUIPMENT OF RETARD-BONDED PRESTRESSING STRAND[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 17-19,44. doi: 10.13204/j.gyjz200811005
It is studied the preparation technics deeply based on the performance characters of adhesive materials,then put forward the solution to every influencing factor during the preparation process,and described the environment control of preparation process.At the same time,it is also developed the coating system equipment,the cooling equipment and the scratch equipment suitable for the processing of retard-bonded prestressing strand,which provides the equipment guarantee to the production of retard-bonded prestressing strand.