Wu Mingjun. THE ESTIMATION ON ESSENTIAL NATURE VIBRATION PERIOD OF REINFORCED CONCRETE FRAME STRUCTURE OF HIGH-RISE CONSTRUCTION[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(10): 57-60. doi: 10.13204/j.gyjz20081015
Citation:
Wu Mingjun. THE ESTIMATION ON ESSENTIAL NATURE VIBRATION PERIOD OF REINFORCED CONCRETE FRAME STRUCTURE OF HIGH-RISE CONSTRUCTION[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(10): 57-60. doi: 10.13204/j.gyjz20081015
Wu Mingjun. THE ESTIMATION ON ESSENTIAL NATURE VIBRATION PERIOD OF REINFORCED CONCRETE FRAME STRUCTURE OF HIGH-RISE CONSTRUCTION[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(10): 57-60. doi: 10.13204/j.gyjz20081015
Citation:
Wu Mingjun. THE ESTIMATION ON ESSENTIAL NATURE VIBRATION PERIOD OF REINFORCED CONCRETE FRAME STRUCTURE OF HIGH-RISE CONSTRUCTION[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(10): 57-60. doi: 10.13204/j.gyjz20081015
It was discussed the method of the estimation on essential nature vibration period of reinforced concrete frame structure of high-rise construction,and was established the formulas having simpler calculation and lesser average discrepancy between actual value and the estimated one.