Zhang Yongqing, Wu Jianqiang, Li Jinbao, Zhao Qiming. DEVIATION-RECTIFYING AND STRENGTHENING OF COLUMNS FOR AMILL BULLDING[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(2): 106-108105. doi: 10.13204/j.gyjz200802028
Citation:
Zhang Yongqing, Wu Jianqiang, Li Jinbao, Zhao Qiming. DEVIATION-RECTIFYING AND STRENGTHENING OF COLUMNS FOR AMILL BULLDING[J]. INDUSTRIAL CONSTRUCTION , 2008, 38(2): 106-108105. doi: 10.13204/j.gyjz200802028
Zhang Yongqing, Wu Jianqiang, Li Jinbao, Zhao Qiming. DEVIATION-RECTIFYING AND STRENGTHENING OF COLUMNS FOR AMILL BULLDING[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(2): 106-108105. doi: 10.13204/j.gyjz200802028
Citation:
Zhang Yongqing, Wu Jianqiang, Li Jinbao, Zhao Qiming. DEVIATION-RECTIFYING AND STRENGTHENING OF COLUMNS FOR AMILL BULLDING[J]. INDUSTRIAL CONSTRUCTION , 2008, 38(2): 106-108105. doi: 10.13204/j.gyjz200802028
DEVIATION-RECTIFYING AND STRENGTHENING OF COLUMNS FOR AMILL BULLDING
1.
1. Jiangsu Shagang Group Co.,Ltd Zhangjiagang 215625;
2.
2. Jiangsu Jianyou Project Management and Consultation Co.,Ltd Huaian 223800;
3.
3. Jiangsu Southeast Special Engineering Co.,Ltd Nanjing 210008
Received Date: 2007-09-20
Publish Date:
2008-02-20
Abstract
The sways of foundation piles, cushion caps and columns occurred due to unsuitable excavation of equipment foundations for a mill builging. The causes were analyzed. It was described emphatically the deviation-rectifying and strengthening technologies of the concrete columns for the mill building.
References
[2] GB 50010-2002 混凝土结构设计规范
DGJ 32PJ57-2007 建(构) 筑物整体迁移技术规程
[3] GB 50367-2006 混凝土结构加固设计规范