Huang Mingxin, Qian Weijun, Huang Kailong, Chen Bin, Mao Cheng. ERECTION TECHNOLOGY OF LARGE SPAN CHORD -TENSION TRUSS STRUCTURE FOR HARBIN INTERNATIONAL EXHIBITION CENTER[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(9): 41-44. doi: 10.13204/j.gyjz200709007
Citation:
Huang Mingxin, Qian Weijun, Huang Kailong, Chen Bin, Mao Cheng. ERECTION TECHNOLOGY OF LARGE SPAN CHORD -TENSION TRUSS STRUCTURE FOR HARBIN INTERNATIONAL EXHIBITION CENTER[J]. INDUSTRIAL CONSTRUCTION , 2007, 37(9): 41-44. doi: 10.13204/j.gyjz200709007
Huang Mingxin, Qian Weijun, Huang Kailong, Chen Bin, Mao Cheng. ERECTION TECHNOLOGY OF LARGE SPAN CHORD -TENSION TRUSS STRUCTURE FOR HARBIN INTERNATIONAL EXHIBITION CENTER[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(9): 41-44. doi: 10.13204/j.gyjz200709007
Citation:
Huang Mingxin, Qian Weijun, Huang Kailong, Chen Bin, Mao Cheng. ERECTION TECHNOLOGY OF LARGE SPAN CHORD -TENSION TRUSS STRUCTURE FOR HARBIN INTERNATIONAL EXHIBITION CENTER[J]. INDUSTRIAL CONSTRUCTION , 2007, 37(9): 41-44. doi: 10.13204/j.gyjz200709007
ERECTION TECHNOLOGY OF LARGE SPAN CHORD -TENSION TRUSS STRUCTURE FOR HARBIN INTERNATIONAL EXHIBITION CENTER
1.
1. Changjiang &Jinggong Steel Structure(Group) Co.,Ltd Shaoxing 312030;
2.
2. Architectural Design Institute in Zhejiang Province Hangzhou 310006
Received Date: 2007-05-28
Publish Date:
2007-09-20
Abstract
The erection technologies of large span chord -tension truss structure for Harbin International Exhibition Centerare introduced. Which include the organization of construction, the splicing and erectiontechnology of large span andweightchord -tension truss, the sliding technology of truss in different bearing level, the tension and analysis technology of prestresscable, the application of cast steel products etc, which provides experience for erection of steel structures in the future.
References
.黄明鑫. 大型张弦梁结构的设计与施工. 济南: 山东科学技术出版社, 2005
Relative Articles
[1] GAN Guorong, LUO Tao, ZHU Yuan, LI Juze. Study on the Prestressed Cable Tensioning Method of Super-High Prefabricated Concrete Wind Tower [J]. INDUSTRIAL CONSTRUCTION, 2023, 53(3): 48-52. doi: 10.13204/j.gyjzG22082909
[2] CAO Meigen, ZHANG Ruoyu, ZHU Yunxiang, WANG Yu, KONG Fanfang, PAN Yiwei. Research on Wind Resistant Reinforcement of In-Plane Cables of Transmission Line Tower and Influence of Design Parameters [J]. INDUSTRIAL CONSTRUCTION, 2022, 52(8): 48-56.
[3] HU Dazhu, YANG Zhenqiao, ZHU Qichang, WU Zhiping, ZHAO Juan. EXPERIMENTAL RESEARCH ON MECHANIC PROPERTIES OF PREFABRICATED REINFORCED CONCRETE BEAMS WITH H-SHAPED STEEL JOINTS [J]. INDUSTRIAL CONSTRUCTION, 2021, 51(6): 59-66,23. doi: 10.13204/j.gyjzG20042108
[4] LIU Zhansheng, SHI Guoliang, WANG Jingchao. RESEARCH ON INTELLIGENT PREDICTION METHOD OF PRESTRESSED CABLE FORCE BASED ON DIGITAL TWINS [J]. INDUSTRIAL CONSTRUCTION, 2021, 51(5): 1-9,123. doi: 10.13204/j.gyjzG20110502
[5] Chi Yuyu Li Junhua Yu Kai Shi Zhe, . STUDY OF FORCE TRANSFER BEHAVIOR FOR SRC MEMBERS WITH STUD SHEAR CONNECTORS UNDER CYCLIC REVERSED LOADING AFTER EXPOSURE TO HIGH TEMPERATURES [J]. INDUSTRIAL CONSTRUCTION, 2015, 45(7): 159-163. doi: 10.13204/j.gyjz201507032
[6] Wu Huazong, Li Junhua, Chi Yuyu, Qiu Dongliang. EXPERIMENTAL STUDY OF BOND-SLIP BEHAVIOR OF SRC MEMBERS UNDER CYCLIC REVERSED LOADING AFTER HIGH TEMPERATURE [J]. INDUSTRIAL CONSTRUCTION, 2015, 45(5): 138-142. doi: 10.13204/j.gyjz201505029
[7] Li Xiaofen, Liu Lixin, Zhang Huipeng. EXPERIMENTAL STUDY ON BOND BEHAVIORS OF PRESTRESSED STRANDS BY PULL-OUT TEST [J]. INDUSTRIAL CONSTRUCTION, 2015, 45(5): 65-69. doi: 10.13204/j.gyjz201505015
[8] Hu Xinguo, Zhu Han. EFFECTS OF ADDING BASALT FIBER ON BOND PROPERTIES BETWEEN DEFORMED BAR AND CONCRETE [J]. INDUSTRIAL CONSTRUCTION, 2013, 43(3): 84-87. doi: 10.13204/j.gyjz201303018
[9] Zheng Jianxiang, Qiu Guozhi, Lu Xiaojun, Wu Shaopeng, Gong Jinghai. STUDY ON LIFTING METHOD FOR STEEL CYLINDER OF THE CONTAINMENT OF AP1000 NUCLEAR PLANT [J]. INDUSTRIAL CONSTRUCTION, 2013, 43(5): 28-32. doi: 10.13204/j.gyjz201305006
[10] Li Buhui, Zhang Dachang, Bao Tao. ANALYSES OF STRUCTURAL TYPE SELECTION FOR THE LONG-SPAN ROOF OF A GYMNASIUM CONSIDERING HURRICANE [J]. INDUSTRIAL CONSTRUCTION, 2012, 42(11): 121-126. doi: 10.13204/j.gyjz201211026
[11] Shen Bin, Qin Jie, Li Guoli, Qian Yingxin, Yang Zhiming. THE PRESTRESS CONSTRUCTION TECHNOLOGY OF A BEAM STRING STRUCTURE FOR BEIJING NORTH STATION [J]. INDUSTRIAL CONSTRUCTION, 2008, 38(12): 12-14,25. doi: 10.13204/j.gyjz200812004
[12] Pei Jie, Shui Weihou, Cao Hui. NEW MODEL OF LONG PILE LOAD TRANSFER FOR SOFT FOUNDATION IN SHANGHAI [J]. INDUSTRIAL CONSTRUCTION, 2005, 35(7): 50-54,49. doi: 10.13204/j.gyjz200507015
[13] Huang Wei, Feng Dingguo. TEST AND RESEARCH ON SLIDING AND SHOCK INSULATION OF LARGE BAY REINFORCED CONCRETE AND BRICK CONSTRUCTION [J]. INDUSTRIAL CONSTRUCTION, 2005, 35(12): 47-50,79. doi: 10.13204/j.gyjz200512014
[14] Chen Liuguo, Fang Congqi, Kou Xinjian, Chen Bing. BOND PROPERTY OF REINFORCED CONCRETE WITH CORRODED REINFORCEMENT [J]. INDUSTRIAL CONSTRUCTION, 2004, 34(5): 15-17. doi: 10.13204/j.gyjz200405005
[15] Yin Zifeng, Jin Xiangwu. ANALYSIS AND TREATMENT OF A LOCAL SLIDING ACCIDENT OF NO.3 RETAINING WALL OF A PROJECT [J]. INDUSTRIAL CONSTRUCTION, 2004, 34(2): 88-90. doi: 10.13204/j.gyjz200402026
Proportional views
Created with Highcharts 5.0.7 Amount of access Chart context menu Abstract Views, HTML Views, PDF Downloads Statistics Abstract Views HTML Views PDF Downloads 2024-05 2024-06 2024-07 2024-08 2024-09 2024-10 2024-11 2024-12 2025-01 2025-02 2025-03 2025-04 0 1 2 3 4 5
Created with Highcharts 5.0.7 Chart context menu Access Class Distribution FULLTEXT : 20.0 % FULLTEXT : 20.0 % META : 80.0 % META : 80.0 % FULLTEXT META
Created with Highcharts 5.0.7 Chart context menu Access Area Distribution 其他 : 20.0 % 其他 : 20.0 % China : 2.2 % China : 2.2 % 东莞 : 2.2 % 东莞 : 2.2 % 北京 : 8.9 % 北京 : 8.9 % 张家口 : 6.7 % 张家口 : 6.7 % 杭州 : 8.9 % 杭州 : 8.9 % 漯河 : 2.2 % 漯河 : 2.2 % 芒廷维尤 : 40.0 % 芒廷维尤 : 40.0 % 西宁 : 6.7 % 西宁 : 6.7 % 阳泉 : 2.2 % 阳泉 : 2.2 % 其他 China 东莞 北京 张家口 杭州 漯河 芒廷维尤 西宁 阳泉