[1] | WANG Jiangang, ZHANG Qing, LI Zhijun, ZHANG Xinyue, LIU Yuanying, MEI Yuan. DYNAMIC RESPONSE ANALYSIS OF AN INDUSTRIAL BUILDING OF HYBRID STRUCTURE UNDER THE ACTION OF EARTHQUAKES[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(1): 194-199. doi: 10.13204/j.gyjzG20082807 |
[2] | WEI Guowen, TU Chuanshang, ZHOU Wenqing. THE INFLUNENCE OF DEEP CLEARANCE ON THE SETTLEMENT OF ADJACENT STRUCTURES[J]. INDUSTRIAL CONSTRUCTION, 2020, 50(4): 93-96. doi: 10.13204/j.gyjz202004017 |
[3] | Shu Biqing, Zheng Juan. DETECTION APPRAISAL AND STRENGTHENING OF A BENT FRAME STRUCTURE PLANT[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(06): 139-142. doi: 10.13204/j.gyjz201406030 |
[4] | Tang Tongzhi, Zhang Hong, Yue Bin, Gong Lifei, Feng Songtao. STUDY ON IMPROVING THICK SOFT SOIL GROUND BELOW OVERBURDEN BY VACUUM COMBINED SURCHARGE PRELOADING[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(2): 61-66,142. doi: 10.13204/j.gyjz201302013 |
[5] | Tang Hongyuan, Wang Zeyun, Jia Yigang. ASSESSMENT AND STRENGTHEN FOR A CHEMICAL FIBRE FACTORY BUILDING SUBJECTED TO FIRE DISASTER[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(7): 152-155,170. doi: 10.13204/j.gyjz201207026 |
[6] | Jiang Wenhui, Chao Si, Zou Xuan. ANALYSIS OF REBUILDING AND REINFORCING METHODS OF INDUSTRIAL BUILDINGS[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(10): 129-133. doi: 10.13204/j.gyjz201110030 |
[7] | Shi Feng. A BRIEF TALK ON ANNEX DESIGN OF AN INDUSTRIAL WORKSHOP[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(9): 17-19. doi: 10.13204/j.gyjz201009006 |
[8] | Zhang Xueyi, Lian Jie. DESIGN OF PRE-STRESSED CONCRETE PLATE WITH CRACKS STRENGTHENED BY BASALT FIBER SHEETS[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(5): 140-142. doi: 10.13204/j.gyjz201005030 |
[9] | Cheng Linlin, Jia Qiang. THE TREATMENT OF WALL CRACKS CAUSED BY CONSTRUCTION DE-WATERING[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(7): 123-126. doi: 10.13204/j.gyjz201007030 |
[10] | Yang Min, Gao Gonglue. TEST OF FOUNDATION REINFORCEMENT OF OPERATIONAL SUBSTATION BY DEVELOPING SMALL-SCALE PILE DRIVER[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(7): 118-122. doi: 10.13204/j.gyjz201007029 |
[11] | Bao Kunpeng, Bao Yinghua, Zhao Long. LEAVE BLANK IN REMODELING FOR THE OLD INDUSTRIAL BUILDING[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(3): 29-31. doi: 10.13204/j.gyjz200903010 |
[12] | Zeng Linghong, Shang Shouping, Wang Jianping, Luo Jie. EXPERIMENTAL STUDY OF BRIDGE STRUCTURAL MEMBERS STRENGTHENED WITH HIGH??PERFORMANCE FERROCEMENT[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(2): 118-122. doi: 10.13204/j.gyjz200902023 |
[13] | Wang Weijun, Wang Xibang, Sun Lianhong. APPLICATION OF STEEL GRID FRAME IN INDUSTRIAL WORKSHOP WITH LARGE SPACE BETWEEN COLUMNS[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(9): 16-18. doi: 10.13204/j.gyjz200809006 |
[14] | Liang Fa-yun, Lu Li. SAFETY EVALUATION AND STRUCTURE STRENGTHEN FOR A DYEING FACTORY BUILDING SUBJECTED TO FIRE DISASTER[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(11): 106-108,115. doi: 10.13204/j.gyjz200711030 |
[15] | Gao Peiguo, Lu Yiyan Wu, Qixiang. TESTING AND STRENGTHENING FOR THE MAIN FACTORY BUILDING OF A POWER PLANT AFTER A FIRE HAZARD[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(3): 99-101. doi: 10.13204/j.gyjz200603026 |
[16] | Huang Li, Ye Li. CAUSE ANALYSIS AND TREATMENT OF CRACKS ACCIDENT TO A FACTORY BUILDING ROOF TRUSS[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(1): 91-93. doi: 10.13204/j.gyjz200601027 |
[17] | Wen Li-ming, Shi Hong-xiang, Chen Zhao-huang. THE DESIGN OF REINFORCEMENT AND REBUILDING OF A HOSPITAL IN SOFT SOIL AREA[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(10): 97-100. doi: 10.13204/j.gyjz200610027 |
[18] | Liu Rong, Lu Tinghao. STUDY ON REFUSE SETTLEMENT WITH THE LOGISTIC MODEL[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(11): 56-59. doi: 10.13204/j.gyjz200511017 |
[19] | Zheng Jianjun, Tan Binghao. ANALYSIS OF SETTLEMENT FOUNDATION FOR A RESIDENTIAL BUILDING AND ITS STRENGTHENING[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(11): 94-96. doi: 10.13204/j.gyjz200511028 |
[20] | Hu Baolin, Guo Yaojie. CHECKOUT AND STRENGTHENING FOR THE MAIN MILL BUILDING OF A STEELWORKS[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(5): 78-79,84. doi: 10.13204/j.gyjz200405025 |