[1] | Cai Xiaoning, Meng Shaoping, Sun Weiwei. REHABILITATION MECHANISM STUDY OF BEAM-TO-COLUMN CONNECTIONS FOR SELF-CENTERING POST-TENSIONED PRECAST FRAME[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(09): 56-61. |
[2] | Zhao Lingxian, Zheng Qizhen, Yang Jue, Liu Guojun, Ye Minjian. INSERTING LAYERS RECONSTRUCTION DESIGN FOR AN INDUSTRIAL WORKSHOP[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(04): 162-166. |
[3] | Shu Biqing, Zheng Juan. DETECTION APPRAISAL AND STRENGTHENING OF A BENT FRAME STRUCTURE PLANT[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(06): 139-142. doi: 10.13204/j.gyjz201406030 |
[4] | Zhou Zhiyun, Zhan Yawei, Yang Jue, Yang Fei, Han Mingzhen. DETECTION AND REINFORCEMENT OF AN EXCELLENT HISTORIC BUILDING[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(09): 166-171. |
[5] | Yang Jue, Zheng Qizhen, Han Mingfei. THE INSPECTION AND REINFORCEMENT ON THE STEEL TRUSS OF A BELT TRANSPORT CORRIDOR[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(3): 138-141,124. doi: 10.13204/j.gyjz201303029 |
[6] | Zhu Lanlan, Zheng Qizhen, Wang Dong, Yang Jue. SEISMIC APPRAISAL AND STRENGTHENING DESIGN OF A STOREY-ADDING-FRAME STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(1): 160-163,65. doi: 10.13204/j.gyjz201201031 |
[7] | He Shihua. ASSESSMENT AND REINFORCEMENTS OF THE PIERS AND GIRDER OF A HIGHSPEED RAILWAY BRIDGE AFTER FIRE[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(12): 143-145,160. doi: 10.13204/j.gyjz201212031 |
[8] | Wang Qingxiang, Wang Xuan. EXPERIMENTAL INVESTIGATION ON THE SEISMIC BEHAVIOR OF SEVERE EARTHQUAKE-DAMAGED GFRP TUBED REINFORCED CONCRETE BRIDGE PIERS REPAIRED WITH WRAPPED CFRP SHEETS[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(10): 6-9,5. doi: 10.13204/j.gyjz201110002 |
[9] | Miao Jijun, Zhu Qiongqiong, Liu Yanchun, Gao Litang, Fan Long. RESEARCH ON APPRAISAL AND RETROFITTING MEASURES FOR A FISHERY FACTORY BUILDING SUBJECTED TO FIRE[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(11): 134-137. doi: 10.13204/j.gyjz201111029 |
[10] | Liu Wenjing, Yang Jianzhong, Wang Ni. INSPECTION AND REINFORCEMENT OF HYDROCHLORIC ACID CORROSION ACCIDENT OF A CONCRETE STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(6): 139-141,145. doi: 10.13204/j.gyjz201106030 |
[11] | Wang Zhenming, Wang Xiaojing, Yang Bin. NEWINTERPRETATION OF THE MODERN SENSE OF CENTURY BARRIER——RESTORATION AND REMODELING OF QINGDAO CHANGZHOU ROAD PRISON[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(1): 138-141. doi: 10.13204/j.gyjz200901031 |
[12] | Zheng Qizhen, Bao Yongliang, Wei Lin. THE DETECTION & IDENTIFICATION ON THE MAJOR STRUCTURE OF PROTECTED HISTORICAL SIGNIFICANT BUILDING[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(8): 1-3,7. doi: 10.13204/j.gyjz200908001 |
[13] | Yan Weibo, Li Zhenbao, Ma Hua, Zhou Xiyuan, Duan Shichang. AN EXPERIMENTAL STUDY ON PERFORMANCES OF STRENGTHENED RC FRAMES WITH RC DAMPERS AND BRACES[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(7): 29-32. doi: 10.13204/j.gyjz200707010 |
[14] | Yang Hong-lie. IDENTIFICATION OF HISTORIC AND CULTURAL VALUE OF MODERN ARCHITECTURES[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(6): 117-119. doi: 10.13204/j.gyjz200606032 |
[15] | Liu Jin-gbo, Du Yi-xin, Fei Bi-gang, Wang Yan, Liu Yang-bing. THE STOREY-ADDING AND REINFORCEMENT DESIGN AND CONSTRUCTION FOR A BUILDING[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(10): 93-96. doi: 10.13204/j.gyjz200610026 |
[16] | Gao Peiguo, Lu Yiyan Wu, Qixiang. TESTING AND STRENGTHENING FOR THE MAIN FACTORY BUILDING OF A POWER PLANT AFTER A FIRE HAZARD[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(3): 99-101. doi: 10.13204/j.gyjz200603026 |
[17] | Shen Mingshan, Li Jinbao, Pan Liushun, Wang Ruikou. STRENGTHENING OF MAIN MILL BUILDING OF JIANGSU JINGSHEN SALT INDUSTRY COMPANY LIMITED[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(5): 105-106. doi: 10.13204/j.gyjz200505028 |
[18] | Tao Zhong, Yu Qing. SUMMARY OF-STATE-OF-THE ART OF FRP-CONFINED CONCRETE COLUMNS[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(9): 1-4,37. doi: 10.13204/j.gyjz200509001 |
[19] | Song Xiang. DETECTION AND RESTORATION OF BUILDING WITH CONCRETE FRAME AFTER FIRE[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(6): 92-94. doi: 10.13204/j.gyjz200506027 |
[20] | Ji Wenhong, Deng Jingwen, Xin Dingkang, Zhao Xiping. ANALYSIS OF STRUCTURAL DAMAGE TO A COMBINED MILL BUILDING AFTER FIRE AND ITS REHABILITATION[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(7): 93-96. doi: 10.13204/j.gyjz200407028 |