Zhong Wenle, Chen Pei, Jiang Fengchang, Yang Genhong, Lu Jianwang. STRENGTHENING AND RECONSTRUCTION A CHEMICAL WORKSHOP INTO 2-HLS90 CONCRETE-MIXING BUILDING[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(2): 107-109. doi: 10.13204/j.gyjz200702027
Citation:
Zhong Wenle, Chen Pei, Jiang Fengchang, Yang Genhong, Lu Jianwang. STRENGTHENING AND RECONSTRUCTION A CHEMICAL WORKSHOP INTO 2-HLS90 CONCRETE-MIXING BUILDING[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(2): 107-109. doi: 10.13204/j.gyjz200702027
Zhong Wenle, Chen Pei, Jiang Fengchang, Yang Genhong, Lu Jianwang. STRENGTHENING AND RECONSTRUCTION A CHEMICAL WORKSHOP INTO 2-HLS90 CONCRETE-MIXING BUILDING[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(2): 107-109. doi: 10.13204/j.gyjz200702027
Citation:
Zhong Wenle, Chen Pei, Jiang Fengchang, Yang Genhong, Lu Jianwang. STRENGTHENING AND RECONSTRUCTION A CHEMICAL WORKSHOP INTO 2-HLS90 CONCRETE-MIXING BUILDING[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(2): 107-109. doi: 10.13204/j.gyjz200702027
It is introduced how to strengthen and reconstruct the corroded chemical workshop, which is a multi-story-frame structure, so as to work out a concrete-mixing building that can carry two production lines.It is mainly described the strengthening plan design and key construction techniques.